[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123397":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1123397,791,1,"单选题","在沉桩施工中，经常用以配合其他沉桩方法的措施是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","锤击沉桩",false,{"key":16,"text":17,"correct":14},"B","静力压桩",{"key":19,"text":20,"correct":14},"C","振动沉桩",{"key":22,"text":23,"correct":24},"D","射水沉桩",true,"P53-55 射水沉桩是锤击沉桩的一种辅助方法。利用高压水流过桩侧面或空心桩内部的射水管冲击桩尖附近土层，便于锤击沉桩。",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]