[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123238":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1123238,791,1,"单选题","尾矿库闭库设计和闭库施工方案，未经（）以上安全生产监督管理部门审查或 审查不合格的，企业不得进行尾矿库闭库施工。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","矿级",false,{"key":16,"text":17,"correct":14},"B","县级",{"key":19,"text":20,"correct":14},"C","市级",{"key":22,"text":23,"correct":24},"D","省级",true,"",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]