[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123192":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1123192,791,1,"单选题","按地基变形设计或应作变形验算且需进行地基处理的建筑物或构筑物，应对处理 后的地基进行（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","变形验算",true,{"key":16,"text":17,"correct":18},"B","沉降观测",false,{"key":20,"text":21,"correct":18},"C","稳定性验算",{"key":23,"text":24,"correct":18},"D","现场试验确定其适用性","",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]