[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123158":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1123158,791,1,"单选题","矿山建设是复杂的综合工程项目，在各个施工阶段都要围绕（ ）组织快速 施工。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","矿井生产的主要工程",false,{"key":16,"text":17,"correct":14},"B","矿井投产的主要工程",{"key":19,"text":20,"correct":14},"C","矿井贯通的关键工程",{"key":22,"text":23,"correct":24},"D","关键线路的关键工程",true,"",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]