[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123149":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1123149,791,1,"单选题","矿业工程施工的技术准备中，关于施工图工作的说法，正确的是要求（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","检查地质条件图纸是否满足工程施工要求，否则应更换图纸",false,{"key":16,"text":17,"correct":14},"B","掌握施工对工程地质条件的影响",{"key":19,"text":20,"correct":14},"C","检查图纸的完整、齐全性就是检查其套数",{"key":22,"text":23,"correct":24},"D","根据图纸标定的坐标确定建筑物位置，并检查其正确性",true,"",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]