[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123123":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1123123,791,1,"单选题","矿山地面建筑工程文明施工要做到（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工设备必须有专人看管",false,{"key":16,"text":17,"correct":14},"B","废石运输时要密闭或覆盖",{"key":19,"text":20,"correct":21},"C","操作地点和周围必须清洁整齐",true,{"key":23,"text":24,"correct":14},"D","电力线路悬挂高度必须2m以上","",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]