[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123100":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1123100,791,1,"单选题","关于吊桶提升，以下说法错误的是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","选用的吊桶必须具有“ 产品合格证”",false,{"key":16,"text":17,"correct":14},"B","立井施工期间，立井中升降人员可采用吊桶升降人员，并遵守规定",{"key":19,"text":20,"correct":21},"C","立井中用吊桶升降人员时的最大速度：在使用钢丝绳罐道时，不得超过提升高度数值的1\u002F2；无罐道时，不得超过2m\u002Fs",true,{"key":23,"text":24,"correct":14},"D","立井中用吊桶升降物料时的最大速度：在使用钢丝绳罐道时，不得超过提升高度数值的2\u002F3；无罐道时，不得超过2m\u002Fs","立井中用吊桶升降人员时的最大速度：在使用钢丝绳罐道时，不得超过提升高度数值的1\u002F2；无罐道时，不得超过1m\u002Fs。",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]