[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123076":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1123076,791,1,"单选题","业主在确属需要时有权发布变更指示。指示的内容包括详细的变更内容、变更工 程量、变更项目的施工技术要求和有关部门文件图纸，以及（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","变更处理的原则",true,{"key":16,"text":17,"correct":18},"B","变更费用计算方法",false,{"key":20,"text":21,"correct":18},"C","变更工期计算方法",{"key":23,"text":24,"correct":18},"D","变更合同修改内容","",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]