[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123072":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1123072,791,1,"单选题","矿业工程施工合同变更的范围或要求包括（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","合同中特定工作工程量的改变",false,{"key":16,"text":17,"correct":14},"B","不得改变施工顺序或时间安排",{"key":19,"text":20,"correct":21},"C","工程的质量或相关特性的变更",true,{"key":23,"text":24,"correct":14},"D","不得删减合同约定的工作内容","",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]