[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123071":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1123071,791,1,"单选题","矿业工程施工合同变更的正确说法是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","合同变更是对失效合同的完善与补充",false,{"key":16,"text":17,"correct":18},"B","合同变更需要双方当事人的一致同意",true,{"key":20,"text":21,"correct":14},"C","合同变更不具有法律约束力",{"key":23,"text":24,"correct":14},"D","合同变更可取消原来的债权债务","",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]