[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123062":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1123062,791,1,"单选题","投标报价可采用的策略是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","提出改进技术方案",true,{"key":16,"text":17,"correct":18},"B","提前递交标书",false,{"key":20,"text":21,"correct":18},"C","低于成本价竞标",{"key":23,"text":24,"correct":18},"D","适当延长工期","",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]