[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123051":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1123051,791,1,"单选题","矿业工程项目进行招标时，其计价方法一般不采用（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","以估算计价编制标底",true,{"key":16,"text":17,"correct":18},"B","以定额计价编制标底",false,{"key":20,"text":21,"correct":18},"C","以工程量清单计价编制标底",{"key":23,"text":24,"correct":18},"D","以投标报价的计价编制标底","",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]