[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123047":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1123047,791,1,"单选题","其他项目清单中，为配合协调招标人进行的工程分包和材料采购所需的费用是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","预留金",false,{"key":16,"text":17,"correct":14},"B","材料购置费",{"key":19,"text":20,"correct":21},"C","总承包服务费",true,{"key":23,"text":24,"correct":14},"D","零星工作费","",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]