[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1122981":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1122981,791,1,"单选题","矿山工程项目在进度控制方法上有其自身的特点，下列说法不属于该特点的是( )",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","施工顺序明确而限制多，使控制方法难度增加",false,{"key":16,"text":17,"correct":14},"B","复杂的环境因素对进度计划影响大，使控制具有不确定性",{"key":19,"text":20,"correct":14},"C","进度控制手段多，但应用具有限制性",{"key":22,"text":23,"correct":24},"D","实施单行作业条件好，能减少施工干扰",true,"",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]