[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1122972":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1122972,791,1,"单选题","矿井建设总工期等于（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","矿井施工准备工期与矿井竣工工期之和",true,{"key":16,"text":17,"correct":18},"B","矿井施工准备工期与矿井投产工期之和",false,{"key":20,"text":21,"correct":18},"C","矿井竣工工期",{"key":23,"text":24,"correct":18},"D","矿井投产工期与矿井竣工工期之和","",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]