[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1122914":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1122914,791,1,"单选题","在立井施工中，（）是最费工时的工作，它约占整个掘进工作循环时间的50%~ 60%,是决定立井施工速度的关键工作。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","装岩与提升工作",true,{"key":16,"text":17,"correct":18},"B","钻眼爆破工作",false,{"key":20,"text":21,"correct":18},"C","测量工作",{"key":23,"text":24,"correct":18},"D","支护工作","",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]