[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1122850":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1122850,791,1,"单选题","关于土桩和灰土桩，以下说法错误的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","土桩和灰土桩挤密地基是由桩间挤密土和填夯的桩体组成的人工“ 复合地基”",false,{"key":16,"text":17,"correct":18},"B","适用于处理地下水位以上，深度10~25 m的湿陷性黄土或人工填土地基",true,{"key":20,"text":21,"correct":14},"C","土桩主要适用于消除湿陷性黄土地基的湿陷性，灰土桩主要适用于提高人工填土地基的承载力",{"key":23,"text":24,"correct":14},"D","地下水位以下或含水量超过2 5 %的土，不宜采用","适用于处理地下水位以上，深度5~1 5 m的湿陷性黄土或人工填土地基。",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]