[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1122846":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1122846,791,1,"单选题","水冲法沉桩一般是边冲水边打桩，当沉桩至最后（ ）时停止冲水，用锤击至规 定标高。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","0, 5m",false,{"key":16,"text":17,"correct":14},"B","1m",{"key":19,"text":20,"correct":21},"C","1 ~2m",true,{"key":23,"text":24,"correct":14},"D","2~3m","",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]