[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1122791":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1122791,791,1,"单选题","关于施工测量工作的基本原则，以下说法错误的是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工测量是一个区域性的工作，因此它必须从涉及范围的整体出发，逐步传递进行。为满足施工测量工作的整体一致性，并能克服因误差的传播和累积而对测量成果造成的影响",false,{"key":16,"text":17,"correct":14},"B","程序上符合“ 由整体到局部”的要求；",{"key":19,"text":20,"correct":21},"C","实施的步骤是“ 先细部后控制”",true,{"key":23,"text":24,"correct":14},"D","精度上要求“ 由高级到低级”","实施的步骤是“ 先控制后细部”。",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]