[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1122788":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1122788,791,1,"单选题","关于井下控制测量，以下说法错误的是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","井下平面控制包括基本控制与采区控制两类。两类控制都应敷设为闭合导线或者附合导线、复测支导线",false,{"key":16,"text":17,"correct":14},"B","基本控制导线应沿主要巷道布设，包括井底车场、硐室、水平运输巷道、总回风道、集中运输石门等。",{"key":19,"text":20,"correct":14},"C","采区控制布设在采区主要巷道，包括上、下山等",{"key":22,"text":23,"correct":24},"D","井下高程点或经纬仪导线点的高程，在主要巷道中应用三角高程测量方法确定，在其他巷道中可以采用水准测量方法或三角高程测量方法确定",true,"井下高程点或经纬仪导线点的高程，在主要巷道中应用水准测量法确定，在其他巷道中可以采用水准测量方法或三角高程测量方法确定。",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]