[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1122770":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1122770,791,1,"单选题","关于矿业工程测量控制网的说法，错误的是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","选择控制网点的一个依据是施工总布置图",false,{"key":16,"text":17,"correct":14},"B","施工控制网的坐标系统应与工程设计时采用的系统相同",{"key":19,"text":20,"correct":14},"C","如精度满足，可利用原区域内的控制网作为其新的控制网",{"key":22,"text":23,"correct":24},"D","当原控制网精度不满足时，此网的所有测点均不能用于新控制网",true,"",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]