[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1122765":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1122765,791,1,"单选题","比较矿井与地面工程施工测量工作内容不同与相同，说法不正确的是(",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","矿井工程有联系测量，而地面一般没有",false,{"key":16,"text":17,"correct":14},"B","平面控制网都可以采用导线法布设",{"key":19,"text":20,"correct":21},"C","地面需要施工控制网，而矿山井下不需要",true,{"key":23,"text":24,"correct":14},"D","井下导线网不是一次测量可以完成","",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]