[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1122761":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1122761,791,1,"单选题","在矿井的工程建设和生产过程中，矿山测量的基准点是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","最重要建筑物上的测点",false,{"key":16,"text":17,"correct":14},"B","通视性最好的测点",{"key":19,"text":20,"correct":21},"C","近井点和井口高程基点",true,{"key":23,"text":24,"correct":14},"D","精度等级最高的测点","",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]