[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-790-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":662},{"id":5,"name":6,"category":7,"favorite":8},790,"二建建筑工程实务","建筑工程",0,5,50,2588,[13,34,46,58,70,81,93,111,126,141,156,170,182,197,209,221,233,248,260,275,289,301,313,325,339,351,363,375,387,401,416,430,445,460,475,487,499,511,523,532,544,556,567,579,590,602,614,626,638,650],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1120268,1,"单选题","当基坑开挖深度不大，地质条件和周围环境允许时，最适宜的开挖方案是（）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","逆作法挖土",false,{"key":24,"text":25,"correct":22},"B","中心岛式挖土",{"key":27,"text":28,"correct":22},"C","盆式控土",{"key":30,"text":31,"correct":32},"D","放坡挖土",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1120269,"关于中心岛式挖土的说法，正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"基坑四边应留土坡",{"key":24,"text":41,"correct":32},"中心岛可作为临时施工场地",{"key":27,"text":43,"correct":22},"利于减少支护体系的变形",{"key":30,"text":45,"correct":22},"多用于无支护土方开挖",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},1120270,"可以用作填方土料的土料是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"淤泥",{"key":24,"text":53,"correct":22},"淤泥质土",{"key":27,"text":55,"correct":22},"膨胀土",{"key":30,"text":57,"correct":32},"黏性土",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},1120271,"泥浆护壁钻孔灌注桩施工工艺流程中“第二次清孔”的下一道工序是（）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"下钢筋笼",{"key":24,"text":65,"correct":22},"下钢导管",{"key":27,"text":67,"correct":22},"质量验收",{"key":30,"text":69,"correct":32},"浇筑水下混凝土",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1120272,"下列土方开挖方式中，属于无支护土方工程的是（）。",[74,76,78,80],{"key":20,"text":75,"correct":32},"放坡开挖",{"key":24,"text":77,"correct":22},"中心岛式开挖",{"key":27,"text":79,"correct":22},"盆式挖土",{"key":30,"text":21,"correct":22},{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":27,"analysis":33},1120273,"验槽时，应重点观察的是（ ）。",[85,87,89,91],{"key":20,"text":86,"correct":22},"基坑中心点",{"key":24,"text":88,"correct":22},"基坑边角处",{"key":27,"text":90,"correct":32},"受力较大的部位",{"key":30,"text":92,"correct":22},"最后开挖的部位",{"id":94,"libraryId":5,"type":95,"typeLabel":96,"stem":97,"options":98,"answer":110,"analysis":33},1120274,2,"多选题","验槽时，需进行轻型动力触探的情况有（ ）。",[99,101,103,105,107],{"key":20,"text":100,"correct":32},"持力层明显不均匀",{"key":24,"text":102,"correct":32},"局部有软弱下卧层",{"key":27,"text":104,"correct":22},"基槽底面有积水",{"key":30,"text":106,"correct":22},"基槽底面存在高抵差",{"key":108,"text":109,"correct":32},"E","有直接观察难以发现的浅埋坑穴、古墓、古井等","ABE",{"id":112,"libraryId":5,"type":95,"typeLabel":96,"stem":113,"options":114,"answer":125,"analysis":33},1120275,"地基验槽中采用钎探法时，同一单位工程中各钎探点打钎应（ ）。",[115,117,119,121,123],{"key":20,"text":116,"correct":32},"钎径一致",{"key":24,"text":118,"correct":22},"钎探耗时一致",{"key":27,"text":120,"correct":32},"锤重一致",{"key":30,"text":122,"correct":32},"用力（落距）一致",{"key":108,"text":124,"correct":22},"锤击数一致","ACD",{"id":127,"libraryId":5,"type":95,"typeLabel":96,"stem":128,"options":129,"answer":140,"analysis":33},1120276,"关于砌体结构工程施工的说法，正确的有（ ）。",[130,132,134,136,138],{"key":20,"text":131,"correct":32},"A.砌体基底标高不同处应从低处砌起",{"key":24,"text":133,"correct":22},"砌体墙上不允许留置临时施工洞口",{"key":27,"text":135,"correct":22},"宽度为500mm的洞口上方应设置加筋砖梁",{"key":30,"text":137,"correct":32},"配筋砌体施工质量控制等级分为B二级",{"key":108,"text":139,"correct":22},"无构造柱的砖砌体的转角处可以留置直槎","AD",{"id":142,"libraryId":5,"type":95,"typeLabel":96,"stem":143,"options":144,"answer":155,"analysis":33},1120277,"关于大体积混凝土裂缝控制做法，正确的有（ ）。",[145,147,149,151,153],{"key":20,"text":146,"correct":32},"控制混凝土入模温度",{"key":24,"text":148,"correct":22},"增大水灰比，加大水泥用量",{"key":27,"text":150,"correct":22},"混凝土浇筑完毕，无需覆盖",{"key":30,"text":152,"correct":32},"掺入适量微膨胀剂",{"key":108,"text":154,"correct":32},"观测混凝土温度变化，以便采取措施","ADE",{"id":157,"libraryId":5,"type":95,"typeLabel":96,"stem":158,"options":159,"answer":155,"analysis":33},1120278,"下列施工措施中，有利于大体积混凝土裂缝控制的是（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":32},"选用低水化热的水泥",{"key":24,"text":163,"correct":22},"提高水灰比",{"key":27,"text":165,"correct":22},"提高混凝土的入模温度",{"key":30,"text":167,"correct":32},"及时对混凝土进行保温、保湿养护",{"key":108,"text":169,"correct":32},"采用二次抹面工艺",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":20,"analysis":33},1120279,"在软土地区基坑开挖深度超过（）时，一般就要用井点降水。",[174,176,178,180],{"key":20,"text":175,"correct":32},"3m",{"key":24,"text":177,"correct":22},"5m",{"key":27,"text":179,"correct":22},"8m",{"key":30,"text":181,"correct":22},"10m",{"id":183,"libraryId":5,"type":95,"typeLabel":96,"stem":184,"options":185,"answer":196,"analysis":33},1120280,"关于土方开挖的说法，正确的有（ ）。",[186,188,190,192,194],{"key":20,"text":187,"correct":22},"基坑开挖可采用机械直接开挖至基底标高",{"key":24,"text":189,"correct":32},"基坑开挖方案应根据支护结构设计、降排水要求确定",{"key":27,"text":191,"correct":32},"土方开挖前应先进行测量定位，设置好控制点",{"key":30,"text":193,"correct":32},"软土基坑必须分层均衡开挖",{"key":108,"text":195,"correct":32},"基坑开挖完成后应及时验槽，减少暴露时间","BCDE",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":20,"analysis":33},1120281,"关于设备基础分层浇筑顺序的说法，正确的是（）。",[201,203,205,207],{"key":20,"text":202,"correct":32},"从低处开始，沿长边方向自一端向另一端浇筑",{"key":24,"text":204,"correct":22},"从低处开始，沿短边方向自一端向另一端浇筑",{"key":27,"text":206,"correct":22},"从高处开始，沿长边方向自一端向另一端浇筑",{"key":30,"text":208,"correct":22},"从高处开始，沿短边方向自一端向另一端浇筑",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":30,"analysis":33},1120282,"在进行土方平衡调配时，需要重点考虑的性能参数是（ ）。",[213,215,217,219],{"key":20,"text":214,"correct":22},"天然含水量",{"key":24,"text":216,"correct":22},"天然密度",{"key":27,"text":218,"correct":22},"密实度",{"key":30,"text":220,"correct":32},"可松性",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":30,"analysis":33},1120283,"关于土方回填施工工艺的说法，错误的是（ ）。",[225,227,229,231],{"key":20,"text":226,"correct":22},"土料应尽量采用同类土",{"key":24,"text":228,"correct":22},"应从场地最低处开始回填",{"key":27,"text":230,"correct":22},"应在相对两侧对称回填",{"key":30,"text":232,"correct":32},"虚铺厚度根据含水量确定",{"id":234,"libraryId":5,"type":95,"typeLabel":96,"stem":235,"options":236,"answer":247,"analysis":33},1120284,"关于混凝土基础的主要形式的说法，正确的有（）。",[237,239,241,243,245],{"key":20,"text":238,"correct":32},"条形基础",{"key":24,"text":240,"correct":32},"单独基础",{"key":27,"text":242,"correct":32},"筏形基础",{"key":30,"text":244,"correct":32},"箱形基础",{"key":108,"text":246,"correct":22},"球形基础","ABCD",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":24,"analysis":33},1120285,"不以降低基坑内地下水位为目的的井是（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":22},"集水井",{"key":24,"text":255,"correct":32},"减压井",{"key":27,"text":257,"correct":22},"回灌井",{"key":30,"text":259,"correct":22},"降水井",{"id":261,"libraryId":5,"type":95,"typeLabel":96,"stem":262,"options":263,"answer":274,"analysis":33},1120286,"关于混凝土条形基础施工的说法，正确的有（）。",[264,266,268,270,272],{"key":20,"text":265,"correct":32},"宜分段分层连续浇筑",{"key":24,"text":267,"correct":32},"一般不留施工缝",{"key":27,"text":269,"correct":32},"各段层间应相互衔接",{"key":30,"text":271,"correct":22},"每段浇筑长度应控制在4～5m",{"key":108,"text":273,"correct":22},"不宜逐段逐层呈阶梯型向前推进","ABC",{"id":276,"libraryId":5,"type":95,"typeLabel":96,"stem":277,"options":278,"answer":196,"analysis":33},1120287,"地基验槽时，需在基底进行轻型动力触探的部位有（ ）。",[279,281,283,285,287],{"key":20,"text":280,"correct":22},"基底已处理的部位",{"key":24,"text":282,"correct":32},"持力层明显不均匀部位",{"key":27,"text":284,"correct":32},"有浅埋古井的部位",{"key":30,"text":286,"correct":32},"浅部有软弱下卧层的部位",{"key":108,"text":288,"correct":32},"设计文件注明的部位",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":24,"analysis":33},1120288,"关于大体积混凝土浇筑的说法，正确的是（ ）。",[293,295,297,299],{"key":20,"text":294,"correct":22},"宜沿短边方向进行",{"key":24,"text":296,"correct":32},"可多点同时浇筑",{"key":27,"text":298,"correct":22},"宜从高处开始",{"key":30,"text":300,"correct":22},"应采用平板振捣器振捣",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":27,"analysis":33},1120289,"根据《建筑基坑支护技术规程》,基坑侧壁的安全等级分为（）级。",[305,307,309,311],{"key":20,"text":306,"correct":22},"1",{"key":24,"text":308,"correct":22},"2",{"key":27,"text":310,"correct":32},"3",{"key":30,"text":312,"correct":22},"4",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":20,"analysis":33},1120290,"下列预应力混凝土管桩压桩的施工顺序中，正确的是（ ）。",[317,319,321,323],{"key":20,"text":318,"correct":32},"先深后浅",{"key":24,"text":320,"correct":22},"先小后大",{"key":27,"text":322,"correct":22},"先短后长",{"key":30,"text":324,"correct":22},"自四周向中间进行",{"id":326,"libraryId":5,"type":95,"typeLabel":96,"stem":327,"options":328,"answer":274,"analysis":33},1120291,"关于钢筋混凝土预制桩锤击沉桩顺序的说法，正确的有（ ）。",[329,331,333,335,337],{"key":20,"text":330,"correct":32},"基坑不大时，打桩可逐排打设",{"key":24,"text":332,"correct":32},"对于密集桩群，从中间开始分头向四周或两边对称施打",{"key":27,"text":334,"correct":32},"当一侧毗邻建筑物时，由毗邻建筑物处向另一方向施打",{"key":30,"text":336,"correct":22},"对基础标高不一的桩，宜先浅后深",{"key":108,"text":338,"correct":22},"对不同规格的桩，宜先小后大",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":27,"analysis":33},1120292,"采用锤击沉桩法施工的摩擦桩，主要以（ ）控制其入土深度。",[343,345,347,349],{"key":20,"text":344,"correct":22},"贯入度",{"key":24,"text":346,"correct":22},"持力层",{"key":27,"text":348,"correct":32},"标高",{"key":30,"text":350,"correct":22},"锤击数",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":20,"analysis":33},1120293,"深基坑工程的第三方监测应由（ ）委托。",[355,357,359,361],{"key":20,"text":356,"correct":32},"建设单位",{"key":24,"text":358,"correct":22},"监理单位",{"key":27,"text":360,"correct":22},"设计单位",{"key":30,"text":362,"correct":22},"施工单位",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":24,"analysis":33},1120294,"某跨度为2m的板，设计混凝土强度等级为C20，其同条件养护的标准立方体试块的抗压强度标准值达到（）时即可拆除底模。",[367,369,371,373],{"key":20,"text":368,"correct":22},"5N\u002Fmm2",{"key":24,"text":370,"correct":32},"10N\u002Fmm2",{"key":27,"text":372,"correct":22},"15N\u002Fmm2",{"key":30,"text":374,"correct":22},"20N\u002Fmm2",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":27,"analysis":33},1120295,"梁下部纵向受力钢筋接头位置宜设置在（）。",[379,381,383,385],{"key":20,"text":380,"correct":22},"梁跨中",{"key":24,"text":382,"correct":22},"梁支座",{"key":27,"text":384,"correct":32},"距梁支座1\u002F3处",{"key":30,"text":386,"correct":22},"可随意设置",{"id":388,"libraryId":5,"type":95,"typeLabel":96,"stem":389,"options":390,"answer":274,"analysis":33},1120296,"关于砌筑砂浆的说法，正确的有（）。",[391,393,395,397,399],{"key":20,"text":392,"correct":32},"砂浆应采用机械搅拌",{"key":24,"text":394,"correct":32},"水泥粉煤灰砂浆搅拌时间不得小于3min",{"key":27,"text":396,"correct":32},"留置试块为边长7.07cm的正方体",{"key":30,"text":398,"correct":22},"同盘砂浆应留置两组试件",{"key":108,"text":400,"correct":22},"六个试件为一组",{"id":402,"libraryId":5,"type":95,"typeLabel":96,"stem":403,"options":404,"answer":415,"analysis":33},1120297,"模板工程设计的安全性指标包括（ ）。",[405,407,409,411,413],{"key":20,"text":406,"correct":32},"强度",{"key":24,"text":408,"correct":32},"刚度",{"key":27,"text":410,"correct":22},"平整度",{"key":30,"text":412,"correct":32},"稳定性",{"key":108,"text":414,"correct":22},"实用性","ABD",{"id":417,"libraryId":5,"type":95,"typeLabel":96,"stem":418,"options":419,"answer":274,"analysis":33},1120298,"混凝土的自然养护方法有（ ）",[420,422,424,426,428],{"key":20,"text":421,"correct":32},"覆盖浇水养护",{"key":24,"text":423,"correct":32},"塑料布覆盖包裹养护",{"key":27,"text":425,"correct":32},"养生液养护",{"key":30,"text":427,"correct":22},"蒸汽养护",{"key":108,"text":429,"correct":22},"升温养护",{"id":431,"libraryId":5,"type":95,"typeLabel":96,"stem":432,"options":433,"answer":444,"analysis":33},1120299,"关于钢结构高强度螺栓安装的说法，正确的有（）。",[434,436,438,440,442],{"key":20,"text":435,"correct":32},"应从刚度大的部位向不受约束的自由端进行",{"key":24,"text":437,"correct":22},"应从不受约束的自由端向刚度大的部位进行",{"key":27,"text":439,"correct":32},"应从螺栓群中部开始向四周扩展逐个拧紧",{"key":30,"text":441,"correct":22},"应从螺栓群四周开始向中部集中逐个拧紧",{"key":108,"text":443,"correct":32},"同一接头中高强度螺栓的初拧、复拧、终拧应在24小时内完成","ACE",{"id":446,"libraryId":5,"type":95,"typeLabel":96,"stem":447,"options":448,"answer":459,"analysis":33},1120300,"关于模板工程安装要点的说法，正确的有（）。",[449,451,453,455,457],{"key":20,"text":450,"correct":32},"支架必须有足够的支承面积，底座必须有足够的承载力",{"key":24,"text":452,"correct":32},"在浇筑混凝土前，木模板应浇水润湿，但模板内不应有积水",{"key":27,"text":454,"correct":32},"模板的接缝不应漏浆",{"key":30,"text":456,"correct":22},"跨度不小于3m的现浇钢筋混凝土梁、板，其模板应按设计要求起拱",{"key":108,"text":458,"correct":32},"设计无要求时，6m的现浇钢筋混凝土梁起拱高度应为跨度的1\u002F1000～3\u002F1000","ABCE",{"id":461,"libraryId":5,"type":95,"typeLabel":96,"stem":462,"options":463,"answer":474,"analysis":33},1120301,"模板的拆除顺序一般为（）。",[464,466,468,470,472],{"key":20,"text":465,"correct":22},"先支先拆，后支后拆",{"key":24,"text":467,"correct":32},"后支先拆，先支后拆",{"key":27,"text":469,"correct":32},"先拆非承重部分，后拆承重部分",{"key":30,"text":471,"correct":22},"先拆承重部分，后拆非承重部分",{"key":108,"text":473,"correct":22},"先下后上，先内后外","BC",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":24,"analysis":33},1120302,"一般墙体大模板在常温条件下，混凝土强度最少要达到（）时即可拆模。",[479,481,483,485],{"key":20,"text":480,"correct":22},"0.5N\u002Fmm2",{"key":24,"text":482,"correct":32},"1.0N\u002Fmm2",{"key":27,"text":484,"correct":22},"1.5N\u002Fmm2",{"key":30,"text":486,"correct":22},"2.0N\u002Fmm2",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":27,"analysis":33},1120303,"一般情况下，后浇带混凝土的最低养护时间是（ ）。",[491,493,495,497],{"key":20,"text":492,"correct":22},"3d",{"key":24,"text":494,"correct":22},"7d",{"key":27,"text":496,"correct":32},"14d",{"key":30,"text":498,"correct":22},"21d",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":27,"analysis":33},1120304,"施工期间最高气温为25℃时，砌筑用普通水泥砂浆拌成后最迟必须在（）内使用完毕。",[503,505,507,509],{"key":20,"text":504,"correct":22},"1h",{"key":24,"text":506,"correct":22},"2h",{"key":27,"text":508,"correct":32},"3h",{"key":30,"text":510,"correct":22},"4h",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":20,"analysis":33},1120305,"设计无明确要求时，模板的拆除顺序正确的是（ ）。",[515,517,519,521],{"key":20,"text":516,"correct":32},"从上而下",{"key":24,"text":518,"correct":22},"先支的先拆",{"key":27,"text":520,"correct":22},"先拆承重模板",{"key":30,"text":522,"correct":22},"后拆非承重模板",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":27,"analysis":33},1120306,"受力钢筋代换应征得（ )同意。",[527,528,529,530],{"key":20,"text":358,"correct":22},{"key":24,"text":362,"correct":22},{"key":27,"text":360,"correct":32},{"key":30,"text":531,"correct":22},"勘察单位",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":20,"analysis":33},1120307,"无圈梁或垫梁时，板、次梁与主梁交叉处钢筋绑扎的是（）。",[536,538,540,542],{"key":20,"text":537,"correct":32},"板的钢筋在上，次梁钢筋居中，主梁钢筋在下",{"key":24,"text":539,"correct":22},"次梁钢筋在上，板的钢筋居中，主梁钢筋在下",{"key":27,"text":541,"correct":22},"主梁钢筋在上，次梁钢筋居中，板的钢筋在下",{"key":30,"text":543,"correct":22},"板的钢筋在上，主梁钢筋居中，次梁钢筋在下",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":27,"analysis":33},1120308,"某现浇钢筋混凝土梁板跨度8m，模板设计时，起拱高度宜为（）。",[548,550,552,554],{"key":20,"text":549,"correct":22},"4mm",{"key":24,"text":551,"correct":22},"6mm",{"key":27,"text":553,"correct":32},"16mm",{"key":30,"text":555,"correct":22},"25mm",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":27,"analysis":33},1120309,"某跨度6m、设计强度为C30的钢筋混凝土梁，其同条件养护试件（150mm立方体）抗压强度如下表，可拆除横梁底模的最早时间是（）。",[560,561,563,565],{"key":20,"text":494,"correct":22},{"key":24,"text":562,"correct":22},"9d",{"key":27,"text":564,"correct":32},"11d",{"key":30,"text":566,"correct":22},"13d",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":20,"analysis":33},1120310,"某跨度8m 的混凝土楼板，设计强度等级C30，模板采用快拆支架体系，支架立杆间距2m，拆模时混凝土的最低强度是（ ）MPa。",[571,573,575,577],{"key":20,"text":572,"correct":32},"15",{"key":24,"text":574,"correct":22},"22.5",{"key":27,"text":576,"correct":22},"25.5",{"key":30,"text":578,"correct":22},"30",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":24,"analysis":33},1120311,"跨度为8m，混凝土设计强度等级为C40 的钢筋混凝土简支梁，混凝土强度最少达到（ ）N\u002Fmm2时才能拆除底模。",[583,585,586,588],{"key":20,"text":584,"correct":22},"28",{"key":24,"text":578,"correct":32},{"key":27,"text":587,"correct":22},"32",{"key":30,"text":589,"correct":22},"34",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":27,"analysis":33},1120312,"关于小型空心砌块砌筑工艺的说法，正确的是（ ）",[594,596,598,600],{"key":20,"text":595,"correct":22},"上下通缝砌筑",{"key":24,"text":597,"correct":22},"不可采用铺浆法砌筑",{"key":27,"text":599,"correct":32},"先绑扎构造柱钢筋后砌筑，最后浇筑混凝土",{"key":30,"text":601,"correct":22},"防潮层以下的空心小砌块砌体，应用C15 混凝土灌实砌体的孔洞",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":30,"analysis":33},1120313,"混凝土悬臂构件底模拆除时，混凝土强度至少不得低于设计强度的（ ）%。",[606,608,610,612],{"key":20,"text":607,"correct":22},"50",{"key":24,"text":609,"correct":22},"75",{"key":27,"text":611,"correct":22},"90",{"key":30,"text":613,"correct":32},"100",{"id":615,"libraryId":5,"type":15,"typeLabel":16,"stem":616,"options":617,"answer":30,"analysis":33},1120314,"关于砌体结构施工的做法，错误的是（ ）。",[618,620,622,624],{"key":20,"text":619,"correct":22},"施工现场砌块堆放整齐，堆放高度1.9m",{"key":24,"text":621,"correct":22},"常温情况下砌体砖砌筑时，提前2d 浇水湿润",{"key":27,"text":623,"correct":22},"砖砌体的水平灰缝厚度为11mm",{"key":30,"text":625,"correct":32},"必须留置的临时间断处砌成直搓",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":30,"analysis":33},1120315,"关于混凝土原材料的说法，错误的是（ ）。",[630,632,634,636],{"key":20,"text":631,"correct":22},"水泥进场时，应对其强度、安定性等指标进行复验",{"key":24,"text":633,"correct":22},"采用海砂时，应按批检验其氯盐含量",{"key":27,"text":635,"correct":22},"快硬硅酸盐水泥出厂超过一个月，应再次复验后按复验结果使用",{"key":30,"text":637,"correct":32},"钢筋混凝土结构中，严禁使用含氯化物的外加剂",{"id":639,"libraryId":5,"type":15,"typeLabel":16,"stem":640,"options":641,"answer":30,"analysis":33},1120316,"关于后浇带设置和处理的说法，正确的是（ ）",[642,644,646,648],{"key":20,"text":643,"correct":22},"若设计无要求，至少保留21d 后再浇筑",{"key":24,"text":645,"correct":22},"填充后浇带，可采用高膨胀混凝土",{"key":27,"text":647,"correct":22},"膨胀混凝土强度等级比原结构强度相同",{"key":30,"text":649,"correct":32},"填充混凝土保持至少14d 的湿润养护",{"id":651,"libraryId":5,"type":15,"typeLabel":16,"stem":652,"options":653,"answer":24,"analysis":33},1120317,"关于混凝土外加剂的说法，错误的是（ ）。",[654,656,658,660],{"key":20,"text":655,"correct":22},"掺入适量减水剂能改善混凝土的耐久性",{"key":24,"text":657,"correct":32},"高温季节大体积混凝土施工应掺速凝剂",{"key":27,"text":659,"correct":22},"掺入引气剂可提高混凝土的抗渗性和抗冻性",{"key":30,"text":661,"correct":22},"早强剂可加速混凝土早期强度增长",[663,666,669,672,675,678],{"id":15,"name":664,"category":7,"favorite":665},"领导干部任职前廉政法规知识测试题",92,{"id":667,"name":668,"category":7,"favorite":15},595,"建筑结构与设备",{"id":670,"name":671,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":673,"name":674,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":676,"name":677,"category":7,"favorite":8},534,"BIM工程师",{"id":679,"name":677,"category":7,"favorite":8},535]