[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-790-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":647},{"id":5,"name":6,"category":7,"favorite":8},790,"二建建筑工程实务","建筑工程",0,24,50,2588,[13,38,52,64,76,88,100,112,124,136,148,160,175,190,205,219,233,248,262,276,288,300,315,327,339,351,366,380,394,408,420,432,444,454,466,478,490,502,514,526,536,548,560,568,580,592,601,613,625,637],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1121226,2,"多选题","某现浇钢筋混凝土楼盖，主梁跨度为9m，次梁跨度为4.8m，次梁轴线间距为4.5m，施工缝宜留置在（ ）的位置。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","距主梁轴线1m，且平行于主梁轴线",false,{"key":24,"text":25,"correct":26},"B","距主梁轴线1.8m，且平行于主梁轴线",true,{"key":28,"text":29,"correct":26},"C","距主梁轴线2m，且平行于主梁轴线",{"key":31,"text":32,"correct":22},"D","距次梁轴线2m，且平行于次梁轴线",{"key":34,"text":35,"correct":22},"E","距次梁轴线1.8m，且平行于次梁轴线","BC","",{"id":39,"libraryId":5,"type":40,"typeLabel":41,"stem":42,"options":43,"answer":24,"analysis":37},1121227,1,"单选题","跨度为2米，当设计无具体要求时，同条件养护试件的混凝土抗压强度应达到设计的混凝土立方体抗压强度标准值的（ ）方可拆除模板",[44,46,48,50],{"key":20,"text":45,"correct":22},"100%",{"key":24,"text":47,"correct":26},"50%",{"key":28,"text":49,"correct":22},"75%",{"key":31,"text":51,"correct":22},"40%",{"id":53,"libraryId":5,"type":40,"typeLabel":41,"stem":54,"options":55,"answer":31,"analysis":37},1121228,"钢筋工程机械连接接头试验时发现有1个试件的抗拉强度不符合要求，这时应再取（ ）个试件进行复检。",[56,58,60,62],{"key":20,"text":57,"correct":22},"3",{"key":24,"text":59,"correct":22},"4",{"key":28,"text":61,"correct":22},"5",{"key":31,"text":63,"correct":26},"6",{"id":65,"libraryId":5,"type":40,"typeLabel":41,"stem":66,"options":67,"answer":20,"analysis":37},1121229,"当采用冷拉调直钢筋时，必须控制钢筋的（ ）。",[68,70,72,74],{"key":20,"text":69,"correct":26},"冷拉率",{"key":24,"text":71,"correct":22},"屈服强度",{"key":28,"text":73,"correct":22},"强屈比",{"key":31,"text":75,"correct":22},"延伸率",{"id":77,"libraryId":5,"type":40,"typeLabel":41,"stem":78,"options":79,"answer":24,"analysis":37},1121230,"在浇筑墙柱混凝土时，在其底部应先填50～100mm厚的与混凝土成分相同的（ ）。",[80,82,84,86],{"key":20,"text":81,"correct":22},"水泥浆",{"key":24,"text":83,"correct":26},"水泥砂浆",{"key":28,"text":85,"correct":22},"减石子混凝土",{"key":31,"text":87,"correct":22},"混凝土",{"id":89,"libraryId":5,"type":40,"typeLabel":41,"stem":90,"options":91,"answer":24,"analysis":37},1121231,"当采用插入式振捣器振捣混凝土时，振捣器插入下层混凝土内的深度应不小于（ ）。",[92,94,96,98],{"key":20,"text":93,"correct":22},"30mm",{"key":24,"text":95,"correct":26},"50mm",{"key":28,"text":97,"correct":22},"80mm",{"key":31,"text":99,"correct":22},"100mm",{"id":101,"libraryId":5,"type":40,"typeLabel":41,"stem":102,"options":103,"answer":28,"analysis":37},1121232,"对于掺用缓凝型外加剂、矿物掺合料或有抗渗性要求的混凝土，覆盖浇水养护的时间不得少于（ ）。",[104,106,108,110],{"key":20,"text":105,"correct":22},"7d",{"key":24,"text":107,"correct":22},"10d",{"key":28,"text":109,"correct":26},"14d",{"key":31,"text":111,"correct":22},"15d",{"id":113,"libraryId":5,"type":40,"typeLabel":41,"stem":114,"options":115,"answer":28,"analysis":37},1121233,"《砌体结构工程施工质量验收规范》GB50203-2011规定，施工时所用的小砌块的产品龄期不应小于（ ）。",[116,118,120,122],{"key":20,"text":117,"correct":22},"12d",{"key":24,"text":119,"correct":22},"24d",{"key":28,"text":121,"correct":26},"28d",{"key":31,"text":123,"correct":22},"36d",{"id":125,"libraryId":5,"type":40,"typeLabel":41,"stem":126,"options":127,"answer":28,"analysis":37},1121234,"关于小砌块砌筑方式，正确的是（ ）。",[128,130,132,134],{"key":20,"text":129,"correct":22},"底面朝下正砌",{"key":24,"text":131,"correct":22},"底面朝外垂直砌",{"key":28,"text":133,"correct":26},"底面朝上反砌",{"key":31,"text":135,"correct":22},"底面朝内垂直砌",{"id":137,"libraryId":5,"type":40,"typeLabel":41,"stem":138,"options":139,"answer":31,"analysis":37},1121235,"某C20钢筋混凝土现浇板跨度为3.8m，其模板拆除时混凝土强度设计无具体要求，当现浇板混凝土强度至少为（ ）MPa时才可以拆除底模及支架。",[140,142,144,146],{"key":20,"text":141,"correct":22},"1.2",{"key":24,"text":143,"correct":22},"10",{"key":28,"text":145,"correct":22},"12.5",{"key":31,"text":147,"correct":26},"15",{"id":149,"libraryId":5,"type":40,"typeLabel":41,"stem":150,"options":151,"answer":24,"analysis":37},1121236,"关于钢结构采用螺栓连接的做法，错误的是（ ）。",[152,154,156,158],{"key":20,"text":153,"correct":22},"高强度螺栓的连接摩擦面不涂漆",{"key":24,"text":155,"correct":26},"高强度螺栓若不能自由穿入孔，采用气割扩孔",{"key":28,"text":157,"correct":22},"普通螺栓与高强螺栓从中间开始，对称向两边进行紧固",{"key":31,"text":159,"correct":22},"高强度螺栓终拧后，螺栓丝扣普遍外露2～3扣",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":174,"analysis":37},1121237,"加气混凝土砌块墙如无切实有效措施，不得使用的部位有（ ）。",[164,166,168,170,172],{"key":20,"text":165,"correct":22},"建筑物室内地面标高以上部位",{"key":24,"text":167,"correct":26},"长期浸水",{"key":28,"text":169,"correct":26},"受化学环境侵蚀的部位",{"key":31,"text":171,"correct":22},"抗震设防烈度8度地区的内隔墙",{"key":34,"text":173,"correct":26},"砌块表面经常处于80℃以上的高温环境","BCE",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":189,"analysis":37},1121238,"钢结构构件防腐涂料涂装的常用施工方法有（ ）。",[179,181,183,185,187],{"key":20,"text":180,"correct":26},"涂刷法",{"key":24,"text":182,"correct":26},"喷涂法",{"key":28,"text":184,"correct":26},"滚涂法",{"key":31,"text":186,"correct":22},"弹涂法",{"key":34,"text":188,"correct":22},"粘贴法","ABC",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":204,"analysis":37},1121239,"在高强螺栓施工中，摩擦面的处理方法有（ ）。",[194,196,198,200,202],{"key":20,"text":195,"correct":26},"喷丸法",{"key":24,"text":197,"correct":26},"砂轮打磨法",{"key":28,"text":199,"correct":26},"酸洗法",{"key":31,"text":201,"correct":22},"碱洗法",{"key":34,"text":203,"correct":26},"钢丝刷人工除锈","ABCE",{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":189,"analysis":37},1121240,"模板及其支架在设计时应考虑的因素主要有（ ）。",[209,211,213,215,217],{"key":20,"text":210,"correct":26},"承载能力",{"key":24,"text":212,"correct":26},"刚度",{"key":28,"text":214,"correct":26},"稳定性",{"key":31,"text":216,"correct":22},"强度",{"key":34,"text":218,"correct":22},"宽度",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":36,"analysis":37},1121241,"关于模板工程安装的说法，错误的有（ ）。",[223,225,227,229,231],{"key":20,"text":224,"correct":22},"模板工程安装前，应进行详细的设计计算",{"key":24,"text":226,"correct":26},"模板与混凝土接触面应清理干净并刷油性隔离剂",{"key":28,"text":228,"correct":26},"浇筑混凝土前，所有模板均应浇水湿润，但模板内不得有积水",{"key":31,"text":230,"correct":22},"模板及其支架下基础应平整光洁",{"key":34,"text":232,"correct":22},"模板的接缝应严密，不漏浆",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":247,"analysis":37},1121242,"钢筋常用的连接方法有（ ）。",[237,239,241,243,245],{"key":20,"text":238,"correct":26},"焊接连接",{"key":24,"text":240,"correct":22},"铆钉连接",{"key":28,"text":242,"correct":22},"化学粘接",{"key":31,"text":244,"correct":26},"机械连接",{"key":34,"text":246,"correct":26},"绑扎连接","ADE",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":174,"analysis":37},1121243,"关于钢筋安装的说法中，正确的有（ ）。",[252,254,256,258,260],{"key":20,"text":253,"correct":22},"框架梁钢筋一般应安装在柱纵向钢筋外侧",{"key":24,"text":255,"correct":26},"柱箍筋转角与纵向钢筋交叉点均应扎牢",{"key":28,"text":257,"correct":26},"楼板的钢筋中间部分可以相隔交叉绑扎",{"key":31,"text":259,"correct":22},"现浇悬挑板上部负筋被踩下可以不修理",{"key":34,"text":261,"correct":26},"主次梁交叉处主梁钢筋通常在下",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":247,"analysis":37},1121244,"关于泵送混凝土施工的说法，正确的有（ ）。",[266,268,270,272,274],{"key":20,"text":267,"correct":26},"混凝土泵可以将混凝土一次输送到浇筑地点",{"key":24,"text":269,"correct":22},"混凝土泵车可随意设置",{"key":28,"text":271,"correct":22},"泵送混凝土配合比设计可以同普通混凝土",{"key":31,"text":273,"correct":26},"混凝土泵送应能连续工作",{"key":34,"text":275,"correct":26},"混凝土泵送输送管宜直，转弯宜缓",{"id":277,"libraryId":5,"type":40,"typeLabel":41,"stem":278,"options":279,"answer":24,"analysis":37},1121245,"热熔法铺贴屋面卷材的技术要求是（ ）",[280,282,284,286],{"key":20,"text":281,"correct":22},"厚度小于3mm的改性沥青防水卷材应采用热熔法施工",{"key":24,"text":283,"correct":26},"厚度小于3mm的改性沥青防水卷材严禁采用热熔法施工",{"key":28,"text":285,"correct":22},"卷材表面热熔后不得立即滚铺卷材，应控制一定的间隔时间",{"key":31,"text":287,"correct":22},"采用条粘法施工时，每幅卷材与基层的粘结面至少应有一条，宽度不应小",{"id":289,"libraryId":5,"type":40,"typeLabel":41,"stem":290,"options":291,"answer":28,"analysis":37},1121246,"屋面卷材防水层，距屋面周边800mm内，以及叠层铺贴的各层卷材之间应（ ）。",[292,294,296,298],{"key":20,"text":293,"correct":22},"条粘",{"key":24,"text":295,"correct":22},"点粘",{"key":28,"text":297,"correct":26},"满粘",{"key":31,"text":299,"correct":22},"空铺",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":314,"analysis":37},1121247,"地下工程防水混凝土应连续浇筑，宜少留施工缝，当需要留设施工缝时其留置位置正确的有（ ）。",[304,306,308,310,312],{"key":20,"text":305,"correct":22},"墙体水平施工工缝应留在底板与侧墙的交接处",{"key":24,"text":307,"correct":22},"墙体有预留孔洞时，施工缝距孔洞边缘不宜大于300mm",{"key":28,"text":309,"correct":26},"顶板、底板不宜留施工缝",{"key":31,"text":311,"correct":26},"垂直施工缝宜于变形缝相结合",{"key":34,"text":313,"correct":22},"板墙结合的水平施工缝可留在板墙接缝处","CD",{"id":316,"libraryId":5,"type":40,"typeLabel":41,"stem":317,"options":318,"answer":31,"analysis":37},1121248,"地下工程铺贴高聚物改性沥青卷材应采用（ ）施工。",[319,321,323,325],{"key":20,"text":320,"correct":22},"冷粘法",{"key":24,"text":322,"correct":22},"自粘法",{"key":28,"text":324,"correct":22},"热风焊接法",{"key":31,"text":326,"correct":26},"热熔法",{"id":328,"libraryId":5,"type":40,"typeLabel":41,"stem":329,"options":330,"answer":31,"analysis":37},1121249,"关于屋面防水水落口做法的说法，正确的是（ ）。",[331,333,335,337],{"key":20,"text":332,"correct":22},"防水层贴入水落口杯内不应小于30mm，周围直径500mm范围内的坡度不应小于3%",{"key":24,"text":334,"correct":22},"防水层贴入水落口杯内不应小于30mm，周围直径500mm范围内的坡度不应小于5%",{"key":28,"text":336,"correct":22},"防水层贴入水落口杯内不应小于50mm，周围直径500mm范围内的坡度不应小于3%",{"key":31,"text":338,"correct":26},"防水层贴入水落口杯内不应小于50mm，周围直径500mm范围内的坡度不应小于5%",{"id":340,"libraryId":5,"type":40,"typeLabel":41,"stem":341,"options":342,"answer":24,"analysis":37},1121250,"屋面防水层用细石混凝土作保护层时，细石混凝土应留设分格缝，其纵横间距一般最大为（ ）。",[343,345,347,349],{"key":20,"text":344,"correct":22},"5m",{"key":24,"text":346,"correct":26},"6m",{"key":28,"text":348,"correct":22},"8m",{"key":31,"text":350,"correct":22},"10m",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":365,"analysis":37},1121251,"某高层建筑，针对其屋面防水等级及设防要求的说法，正确的有（ ）。",[355,357,359,361,363],{"key":20,"text":356,"correct":26},"Ⅰ级防水",{"key":24,"text":358,"correct":22},"Ⅱ级防水",{"key":28,"text":360,"correct":22},"Ⅲ级防水",{"key":31,"text":362,"correct":22},"一道防水设防",{"key":34,"text":364,"correct":26},"两道防水设防","AE",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":174,"analysis":37},1121252,"卷材防水层铺贴顺序和方向应符合下列（ ）的规定。",[370,372,374,376,378],{"key":20,"text":371,"correct":22},"卷材防水层施工时，应先进行细部构造处理，然后由屋面最高标高向下铺贴",{"key":24,"text":373,"correct":26},"卷材防水层施工时，应先进行细部构造处理，然后由屋面最低标高向上铺贴先远后近",{"key":28,"text":375,"correct":26},"檐沟.天沟卷材施工时，宜顺檐沟、天沟方向铺贴，搭接缝应顺流水方向",{"key":31,"text":377,"correct":22},"檐沟.天沟卷材施工时，宜顺檐沟、天沟方向铺贴，搭接缝应逆流水方向",{"key":34,"text":379,"correct":26},"卷材宜平行屋脊铺贴，上下层卷材不得相互垂直铺贴",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":365,"analysis":37},1121253,"下列关于屋面防水基本要求说法正确的是（ ）。",[384,386,388,390,392],{"key":20,"text":385,"correct":26},"屋面防水以防为主,以排为辅",{"key":24,"text":387,"correct":22},"当混凝土结构采用结构找坡时,坡度不应小于2%",{"key":28,"text":389,"correct":22},"当采用材料找坡时,坡度宜为3%",{"key":31,"text":391,"correct":22},"找坡层最薄处厚度不宜小于10mm",{"key":34,"text":393,"correct":26},"保温层上找平层应在初凝前设置分隔缝,纵横缝间距不宜大于6m",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":204,"analysis":37},1121254,"关于热粘法铺贴卷材，说法正确的有（ ）。",[398,400,402,404,406],{"key":20,"text":399,"correct":26},"宜采用专用导热油炉加热",{"key":24,"text":401,"correct":26},"加热温度不应高于200℃",{"key":28,"text":403,"correct":26},"使用温度不宜低于180℃",{"key":31,"text":405,"correct":22},"粘贴卷材的热熔型改性沥青胶结料厚度宜为1.0~2.5mm",{"key":34,"text":407,"correct":26},"采用热熔型改性沥青胶结料辅贴卷材时，应随刮随滚铺，并应展平压实",{"id":409,"libraryId":5,"type":40,"typeLabel":41,"stem":410,"options":411,"answer":28,"analysis":37},1121255,"室内防水施工过程包括：①细部附加层、②防水层、③结合层、④清理基层，正确的施工流程是（ ）。",[412,414,416,418],{"key":20,"text":413,"correct":22},"①②③④",{"key":24,"text":415,"correct":22},"④①②③",{"key":28,"text":417,"correct":26},"④③①②",{"key":31,"text":419,"correct":22},"④②①③",{"id":421,"libraryId":5,"type":40,"typeLabel":41,"stem":422,"options":423,"answer":24,"analysis":37},1121256,"地下工程防水卷材的施工最常用的方法是（ ）。",[424,426,428,430],{"key":20,"text":425,"correct":22},"外防内贴法",{"key":24,"text":427,"correct":26},"外防外贴法",{"key":28,"text":429,"correct":22},"内防内贴法",{"key":31,"text":431,"correct":22},"内防外贴法",{"id":433,"libraryId":5,"type":40,"typeLabel":41,"stem":434,"options":435,"answer":24,"analysis":37},1121257,"下列关于防水卷材铺贴，说法正确的是（ ）。",[436,438,440,442],{"key":20,"text":437,"correct":22},"屋面卷材宜垂直屋脊铺设，搭接缝应顺流水方向",{"key":24,"text":439,"correct":26},"卷材铺设宜先立面，后平面",{"key":28,"text":441,"correct":22},"上下两道卷材应相互垂直铺设",{"key":31,"text":443,"correct":22},"有重物屋盖的卷材防水时，应优先采用满粘法、点粘法、条粘法",{"id":445,"libraryId":5,"type":40,"typeLabel":41,"stem":446,"options":447,"answer":24,"analysis":37},1121258,"地下工程，铺贴厚度小于3mm的高聚物改性沥青卷材时，严禁采用的施工方法是（ ）。",[448,449,450,452],{"key":20,"text":320,"correct":22},{"key":24,"text":326,"correct":26},{"key":28,"text":451,"correct":22},"满粘法",{"key":31,"text":453,"correct":22},"空铺法",{"id":455,"libraryId":5,"type":40,"typeLabel":41,"stem":456,"options":457,"answer":28,"analysis":37},1121259,"屋面涂膜防水施工中，采用二层以上胎体增强材料时，上下层不得互相垂直铺设，搭接缝应错开，其间距不应小于幅宽的（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":22},"1\u002F5",{"key":24,"text":461,"correct":22},"1\u002F4",{"key":28,"text":463,"correct":26},"1\u002F3",{"key":31,"text":465,"correct":22},"1\u002F2",{"id":467,"libraryId":5,"type":40,"typeLabel":41,"stem":468,"options":469,"answer":31,"analysis":37},1121260,"平屋面采用结构找坡时，屋面防水找平层的排水坡度不应小于（ ）。",[470,472,474,476],{"key":20,"text":471,"correct":22},"1%",{"key":24,"text":473,"correct":22},"1.5%",{"key":28,"text":475,"correct":22},"2%",{"key":31,"text":477,"correct":26},"3%",{"id":479,"libraryId":5,"type":40,"typeLabel":41,"stem":480,"options":481,"answer":20,"analysis":37},1121261,"屋面防水卷材平行屋脊的卷材搭接缝，其方向应（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":26},"顺流水方向",{"key":24,"text":485,"correct":22},"垂直流水方向",{"key":28,"text":487,"correct":22},"顺流最大频率风向",{"key":31,"text":489,"correct":22},"垂直年最大频率风向",{"id":491,"libraryId":5,"type":40,"typeLabel":41,"stem":492,"options":493,"answer":24,"analysis":37},1121262,"关于涂料防水的说法，正确的是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"有机防水涂料宜用于结构主体的迎水面或背水面",{"key":24,"text":497,"correct":26},"无机防水涂料可用于结构主体的迎水面或背水面",{"key":28,"text":499,"correct":22},"防水涂膜多遍完成，每遍涂刷时应顺同一方向交替搭接",{"key":31,"text":501,"correct":22},"涂料防水层中胎体增强材料上下两层应相互垂直铺贴",{"id":503,"libraryId":5,"type":40,"typeLabel":41,"stem":504,"options":505,"answer":24,"analysis":37},1121263,"墙体水平施工缝不应留在剪力最大处或底板与侧墙的交接处，应留在高出底板表面不小于（ ）mm的墙体上。",[506,508,510,512],{"key":20,"text":507,"correct":22},"500",{"key":24,"text":509,"correct":26},"300",{"key":28,"text":511,"correct":22},"800",{"key":31,"text":513,"correct":22},"200",{"id":515,"libraryId":5,"type":40,"typeLabel":41,"stem":516,"options":517,"answer":28,"analysis":37},1121264,"水泥砂浆防水层可用于地下工程防水的最高温度是（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":22},"25℃",{"key":24,"text":521,"correct":22},"50℃",{"key":28,"text":523,"correct":26},"80℃",{"key":31,"text":525,"correct":22},"100℃",{"id":527,"libraryId":5,"type":40,"typeLabel":41,"stem":528,"options":529,"answer":31,"analysis":37},1121265,"立面铺贴防水卷材适应采用（ ）。",[530,531,533,535],{"key":20,"text":453,"correct":22},{"key":24,"text":532,"correct":22},"点粘法",{"key":28,"text":534,"correct":22},"条粘法",{"key":31,"text":451,"correct":26},{"id":537,"libraryId":5,"type":40,"typeLabel":41,"stem":538,"options":539,"answer":31,"analysis":37},1121266,"地下工程防水混凝土墙体的水平施工缝应留在（ ）。",[540,542,544,546],{"key":20,"text":541,"correct":22},"顶板与侧墙的交接处",{"key":24,"text":543,"correct":22},"底板与侧墙的交接处",{"key":28,"text":545,"correct":22},"低于顶板底面不小于300mm的墙体上",{"key":31,"text":547,"correct":26},"高出底板表面不小于300mm的墙体上",{"id":549,"libraryId":5,"type":40,"typeLabel":41,"stem":550,"options":551,"answer":24,"analysis":37},1121267,"屋面防水设防要求为一道防水设防的建筑，其防水等级为（ ）。",[552,554,556,558],{"key":20,"text":553,"correct":22},"Ⅰ级",{"key":24,"text":555,"correct":26},"Ⅱ级",{"key":28,"text":557,"correct":22},"Ⅲ级",{"key":31,"text":559,"correct":22},"Ⅳ级",{"id":561,"libraryId":5,"type":40,"typeLabel":41,"stem":562,"options":563,"answer":31,"analysis":37},1121268,"立面或大坡面铺贴防水卷材时，应采用的施工方法是（ ）。",[564,565,566,567],{"key":20,"text":453,"correct":22},{"key":24,"text":532,"correct":22},{"key":28,"text":534,"correct":22},{"key":31,"text":451,"correct":26},{"id":569,"libraryId":5,"type":40,"typeLabel":41,"stem":570,"options":571,"answer":28,"analysis":37},1121269,"热熔型防水涂料大面施工时，最适宜的施工方法是（ ）。",[572,574,576,578],{"key":20,"text":573,"correct":22},"喷涂施工",{"key":24,"text":575,"correct":22},"滚涂施工",{"key":28,"text":577,"correct":26},"刮涂施工",{"key":31,"text":579,"correct":22},"刷涂施工",{"id":581,"libraryId":5,"type":40,"typeLabel":41,"stem":582,"options":583,"answer":28,"analysis":37},1121270,"关于水泥砂浆防水层施工的说法，正确的是（ ）。",[584,586,588,590],{"key":20,"text":585,"correct":22},"施工气温不应低于0℃",{"key":24,"text":587,"correct":22},"养护温度不宜低于-5℃",{"key":28,"text":589,"correct":26},"保持砂浆表面湿润",{"key":31,"text":591,"correct":22},"养护时间不得小于7D",{"id":593,"libraryId":5,"type":40,"typeLabel":41,"stem":594,"options":595,"answer":20,"analysis":37},1121271,"卷材防水层的施工环境温度最低的是（ ）。",[596,597,598,600],{"key":20,"text":326,"correct":26},{"key":24,"text":320,"correct":22},{"key":28,"text":599,"correct":22},"热粘法",{"key":31,"text":322,"correct":22},{"id":602,"libraryId":5,"type":40,"typeLabel":41,"stem":603,"options":604,"answer":20,"analysis":37},1121272,"防水混凝土冬期施工时，其入模温度不应低于（ ）。",[605,607,609,611],{"key":20,"text":606,"correct":26},"5℃",{"key":24,"text":608,"correct":22},"10℃",{"key":28,"text":610,"correct":22},"0℃",{"key":31,"text":612,"correct":22},"-5℃",{"id":614,"libraryId":5,"type":40,"typeLabel":41,"stem":615,"options":616,"answer":20,"analysis":37},1121273,"下列关于地下防水基本要求说法错误的是（ ）。",[617,619,621,623],{"key":20,"text":618,"correct":26},"地下工程的防水等级分为二级",{"key":24,"text":620,"correct":22},"防水混凝土的适用环境温度不得高于80℃",{"key":28,"text":622,"correct":22},"防水混凝土可通过调整配合比,或掺加外加剂、掺合料等措施配制而成,其抗渗等级不得小于P6",{"key":31,"text":624,"correct":22},"试配防水混凝土的抗渗等级应比设计要求提高0.2MPa",{"id":626,"libraryId":5,"type":40,"typeLabel":41,"stem":627,"options":628,"answer":31,"analysis":37},1121274,"下列关于室内防水基本要求说法错误的是（ ）。",[629,631,633,635],{"key":20,"text":630,"correct":22},"防水混凝土终凝后应立即进行养护,养护时间不得少于14d",{"key":24,"text":632,"correct":22},"防水混凝土冬期施工时,其入模温度不应低于5℃",{"key":28,"text":634,"correct":22},"防水水泥砂浆终凝后应及时进行养护,养护时间不应少于14d",{"key":31,"text":636,"correct":26},"涂膜防水层施工时,涂刷方向相互垂直,宜先涂刷平面,后涂刷立面",{"id":638,"libraryId":5,"type":40,"typeLabel":41,"stem":639,"options":640,"answer":20,"analysis":37},1121275,"下列关于卷材防水屋面施工顺序中错误的是（ ）。",[641,642,644,645],{"key":20,"text":371,"correct":26},{"key":24,"text":643,"correct":22},"檐沟天沟卷材施工时，宜顺檐沟、天沟方向铺贴，",{"key":28,"text":379,"correct":22},{"key":31,"text":646,"correct":22},"檐沟天沟卷材施工时，搭接缝应顺流水方向",[648,651,654,657,660,663],{"id":40,"name":649,"category":7,"favorite":650},"领导干部任职前廉政法规知识测试题",92,{"id":652,"name":653,"category":7,"favorite":40},595,"建筑结构与设备",{"id":655,"name":656,"category":7,"favorite":40},715,"招标采购专业知识与法律法规",{"id":658,"name":659,"category":7,"favorite":40},848,"市政方向-通用基础",{"id":661,"name":662,"category":7,"favorite":8},534,"BIM工程师",{"id":664,"name":662,"category":7,"favorite":8},535]