[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-790-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":649},{"id":5,"name":6,"category":7,"favorite":8},790,"二建建筑工程实务","建筑工程",0,22,50,2588,[13,38,53,68,83,98,112,124,136,148,160,172,184,196,208,220,232,244,256,268,280,292,304,316,328,340,352,367,382,396,411,423,435,445,457,471,486,498,510,522,534,546,558,567,579,591,603,615,627,637],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1121125,2,"多选题","砌体工程不得在（ ）设置脚手眼。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","120㎜厚墙、料石清水墙和独立柱",true,{"key":24,"text":25,"correct":26},"B","240㎜厚墙",false,{"key":28,"text":29,"correct":26},"C","宽度为2m的窗间墙",{"key":31,"text":32,"correct":22},"D","过梁上与过梁成60度角的三角形范围及过梁净跨度1\u002F2的高度范围内",{"key":34,"text":35,"correct":22},"E","梁或梁垫下及其左右500㎜范围内","ADE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1121126,"下列关于混凝土的养护，符合技术要求的有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"对采用硅酸盐水泥拌制的混凝土，不得少于7天",{"key":24,"text":45,"correct":22},"对抗渗混凝土.强度等级C60及以上的混凝土，不得少于14天",{"key":28,"text":47,"correct":22},"对采用缓凝型外加剂.大掺量矿物掺合料配制的混凝土，不得少于14天",{"key":31,"text":49,"correct":22},"大体积混凝土的养护时间不应少于14天",{"key":34,"text":51,"correct":26},"后浇带混凝土的养护时间不应少于28天","ABCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1121127,"下列关于普通混凝土小型空心砌体工程施工技术的叙述，正确的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"施工采用的小砌块的产品龄期不应小于28天",{"key":24,"text":60,"correct":26},"底层室内地面以下或防潮层以下的砌体，应采用强度等级不低于C25的混凝土灌实小砌块的孔洞",{"key":28,"text":62,"correct":26},"在厨房和卫生间等设置的卡具安装处砌筑的小砌块，应采用强度等级不低于C25的混凝土灌实小砌块的孔洞",{"key":31,"text":64,"correct":22},"小砌块应将生产时的底面朝上反砌于墙上，小砌块墙体宜逐块坐浆砌筑",{"key":34,"text":66,"correct":26},"砌筑应从转角或定位处开始，先砌外墙再砌内墙","AD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1121128,"非抗震设防及抗震设防烈度为6 度、7 度地区的临时间断处，当不能留斜槎时，除转角处外，可留直槎，但直槎必须做成凸槎，且应加设拉结钢筋，拉结钢筋应符合下列规定（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"120mm厚墙放置1Φ6拉结钢筋",{"key":24,"text":75,"correct":22},"每120mm墙厚放置1Φ6 拉结钢筋",{"key":28,"text":77,"correct":22},"间距沿墙高不应超过500mm，且竖向间距偏差不应超过100mm",{"key":31,"text":79,"correct":22},"末端应有90°弯钩",{"key":34,"text":81,"correct":26},"埋入长度从留槎处算起每边均不应小于700mm","BCD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1121129,"模板的拆除顺序一般为（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"先支先拆，后支后拆",{"key":24,"text":90,"correct":22},"后支先拆，先支后拆",{"key":28,"text":92,"correct":22},"先拆非承重部分，后拆承重部分",{"key":31,"text":94,"correct":26},"先拆承重部分，后拆非承重部分",{"key":34,"text":96,"correct":26},"先下后上，先内后外","BC",{"id":99,"libraryId":5,"type":100,"typeLabel":101,"stem":102,"options":103,"answer":24,"analysis":37},1121130,1,"单选题","对现浇混凝土工程模板支撑系统的选材及安装要求的表述中，有误的是（ ）。",[104,106,108,110],{"key":20,"text":105,"correct":26},"为保证立柱的整体稳定，在安装立柱的同时，应加设水平拉结和剪刀撑",{"key":24,"text":107,"correct":22},"为合理传递荷载，立柱底部应设置砖铺垫",{"key":28,"text":109,"correct":26},"立柱底部支承结构必须具有支承上层荷载的能力",{"key":31,"text":111,"correct":26},"支撑系统的选材及安装应按照设计要求进行，基土上的支撑点应牢固平整，支撑在安装过程中应考虑必要的临时固定措施，以保证其稳定性",{"id":113,"libraryId":5,"type":100,"typeLabel":101,"stem":114,"options":115,"answer":28,"analysis":37},1121131,"关于模板工程安装要点的叙述中，不正确的是（ ）。",[116,118,120,122],{"key":20,"text":117,"correct":26},"浇筑混凝土前，模板内的杂物应清理干净",{"key":24,"text":119,"correct":26},"对清水混凝土工程及装饰混凝土工程，应使用能达到设计效果的模板",{"key":28,"text":121,"correct":22},"模板的接缝不应漏浆，浇筑混凝土前，木模板应浇水润湿，并且模板内应有适量积水",{"key":31,"text":123,"correct":26},"模板与接触面内应清理干净并涂刷隔离剂，但不得采用影响结构性能或妨碍装饰工程的隔离剂",{"id":125,"libraryId":5,"type":100,"typeLabel":101,"stem":126,"options":127,"answer":20,"analysis":37},1121132,"关于模板安装要点的说法，错误的是（ ）。",[128,130,132,134],{"key":20,"text":129,"correct":22},"对跨度不小于4米的现浇混凝土梁、板，其模板应按设计要求起拱；当设计无具体要求时，起拱高度应为跨度的1\u002F1000～4\u002F1000",{"key":24,"text":131,"correct":26},"采用扣件式钢管作高大模板支架的立杆时，支架搭设应平整。立杆上应每步设置双向水平杆，水平杆应与立杆扣接；立杆底部应设置垫板。",{"key":28,"text":133,"correct":26},"安装现浇结构的上层模板及其支架时，下层楼板应具有承受上层以荷载的承载能力，或加设支架；上下层支架的立柱应对准，并铺设垫板",{"key":31,"text":135,"correct":26},"后浇带的模板及支架应独立设置",{"id":137,"libraryId":5,"type":100,"typeLabel":101,"stem":138,"options":139,"answer":20,"analysis":37},1121133,"关于高强度螺栓施工的说法，正确的是（ ）。",[140,142,144,146],{"key":20,"text":141,"correct":22},"高强度螺栓不得强行穿人",{"key":24,"text":143,"correct":26},"高强度螺栓可兼做安装螺栓",{"key":28,"text":145,"correct":26},"高强度螺栓应一次性拧紧到位",{"key":31,"text":147,"correct":26},"高强度螺栓梅花头可用火焰切割",{"id":149,"libraryId":5,"type":100,"typeLabel":101,"stem":150,"options":151,"answer":24,"analysis":37},1121134,"关于模板拆除的说法，正确的是（ ）。",[152,154,156,158],{"key":20,"text":153,"correct":26},"底模及其支架拆除应符合设计或规范要求",{"key":24,"text":155,"correct":22},"后张法预应力构件侧模宜在预应力张拉前拆除",{"key":28,"text":157,"correct":26},"后张法预应力构件底模宜在预应力张拉前拆除",{"key":31,"text":159,"correct":26},"拆模通常先拆承重部分后拆非承重部分",{"id":161,"libraryId":5,"type":100,"typeLabel":101,"stem":162,"options":163,"answer":24,"analysis":37},1121135,"下列焊接方式中，现场梁主筋不宜采用的是（ ）。",[164,166,168,170],{"key":20,"text":165,"correct":26},"闪光对焊",{"key":24,"text":167,"correct":22},"电渣压力焊",{"key":28,"text":169,"correct":26},"单面搭接焊",{"key":31,"text":171,"correct":26},"双面帮条焊",{"id":173,"libraryId":5,"type":100,"typeLabel":101,"stem":174,"options":175,"answer":31,"analysis":37},1121136,"关于砌体工程施工质量的说法，正确的是（ ）。",[176,178,180,182],{"key":20,"text":177,"correct":26},"混凝土小砌块砌体水平灰缝的砂浆饱满度，按净面积计算不得低于80%",{"key":24,"text":179,"correct":26},"小砌块应底面朝上反砌于墙上，且应对孔错缝搭砌，搭接长度不应小于60mm",{"key":28,"text":181,"correct":26},"采用轻质材料砌筑填充墙时，墙底部的普通砖或混凝土坎台高度不宜小150mm",{"key":31,"text":183,"correct":22},"砌筑砂浆应随拌随用，施工期间气温不超过30℃时应在3h内使用完毕",{"id":185,"libraryId":5,"type":100,"typeLabel":101,"stem":186,"options":187,"answer":31,"analysis":37},1121137,"柱钢筋绑扎要求中，每层柱第一个钢筋接头位置距楼地面高度不宜小于（ ）mm、柱高的1\u002F6及柱截面长边（或直径）的较大值。",[188,190,192,194],{"key":20,"text":189,"correct":26},"800",{"key":24,"text":191,"correct":26},"600",{"key":28,"text":193,"correct":26},"1000",{"key":31,"text":195,"correct":22},"500",{"id":197,"libraryId":5,"type":100,"typeLabel":101,"stem":198,"options":199,"answer":28,"analysis":37},1121138,"柱、墙模板内混凝土浇筑时，如粗骨料的粒径大于25mm时，混凝土浇筑高度不宜超过（ ）m。",[200,202,204,206],{"key":20,"text":201,"correct":26},"2",{"key":24,"text":203,"correct":26},"4",{"key":28,"text":205,"correct":22},"3",{"key":31,"text":207,"correct":26},"6",{"id":209,"libraryId":5,"type":100,"typeLabel":101,"stem":210,"options":211,"answer":31,"analysis":37},1121139,"某C20钢筋混凝土现浇板跨度为3.8m，其模板拆除时混凝土强度设计无具体要求，当现浇板混凝土强度至少为()MPa时才可以拆除底模及支架。",[212,214,216,218],{"key":20,"text":213,"correct":26},"1.2",{"key":24,"text":215,"correct":26},"10",{"key":28,"text":217,"correct":26},"12.5",{"key":31,"text":219,"correct":22},"15",{"id":221,"libraryId":5,"type":100,"typeLabel":101,"stem":222,"options":223,"answer":20,"analysis":37},1121140,"跨度6m的梁，设计无要求时，模板的起拱高度应为（ ）。",[224,226,228,230],{"key":20,"text":225,"correct":22},"6mm-18mm",{"key":24,"text":227,"correct":26},"4mm-8mm",{"key":28,"text":229,"correct":26},"6mm-12mm",{"key":31,"text":231,"correct":26},"12mm-18mm",{"id":233,"libraryId":5,"type":100,"typeLabel":101,"stem":234,"options":235,"answer":31,"analysis":37},1121141,"连续梁、板的上部钢筋接头位置宜设置在（ ）跨度范围内，下部钢筋接头位置宜设置在（ ）跨度范围内。",[236,238,240,242],{"key":20,"text":237,"correct":26},"梁端1\u002F3,跨中1\u002F3",{"key":24,"text":239,"correct":26},"跨中2\u002F3,梁端1\u002F3",{"key":28,"text":241,"correct":26},"跨中2\u002F3,梁端2\u002F3",{"key":31,"text":243,"correct":22},"跨中1\u002F3,梁端1\u002F3",{"id":245,"libraryId":5,"type":100,"typeLabel":101,"stem":246,"options":247,"answer":24,"analysis":37},1121142,"混凝土的养护时间规定中，对于后浇带混凝土的养护时间不应少于（ ）。",[248,250,252,254],{"key":20,"text":249,"correct":26},"28d",{"key":24,"text":251,"correct":22},"14d",{"key":28,"text":253,"correct":26},"12d",{"key":31,"text":255,"correct":26},"7d",{"id":257,"libraryId":5,"type":100,"typeLabel":101,"stem":258,"options":259,"answer":24,"analysis":37},1121143,"下列关于大体积混凝土施工时温控指标的叙述，错误的是（ ）。",[260,262,264,266],{"key":20,"text":261,"correct":26},"混凝土浇筑体在入模温度基础上的温升值不宜大于50℃",{"key":24,"text":263,"correct":22},"混凝土浇筑体的里表温差（不含混凝土收缩的当量温度）不宜大于30℃",{"key":28,"text":265,"correct":26},"混凝土浇筑体的降温速率不宜大于2℃\u002Fd",{"key":31,"text":267,"correct":26},"混凝土浇筑体表面与大气温差不宜大于20℃",{"id":269,"libraryId":5,"type":100,"typeLabel":101,"stem":270,"options":271,"answer":31,"analysis":37},1121144,"设有钢筋混凝土构造柱的抗震多层砖房，其施工顺序应（ ）。",[272,274,276,278],{"key":20,"text":273,"correct":26},"先绑扎钢筋，然后浇筑混凝土构造柱，最后砌砖墙",{"key":24,"text":275,"correct":26},"先砌砖墙，然后绑扎钢筋，最后浇筑混凝土构造柱",{"key":28,"text":277,"correct":26},"先浇筑混凝土构造柱，然后绑扎钢筋，最后砌砖墙",{"key":31,"text":279,"correct":22},"先绑扎钢筋，然后砌砖墙，最后浇筑混凝土构造柱",{"id":281,"libraryId":5,"type":100,"typeLabel":101,"stem":282,"options":283,"answer":24,"analysis":37},1121145,"关于钢结构采用螺栓连接的做法，错误的是()。",[284,286,288,290],{"key":20,"text":285,"correct":26},"高强度螺栓的连接摩擦面不涂漆",{"key":24,"text":287,"correct":22},"高强度螺栓若不能自由穿入孔，采用气割扩孔",{"key":28,"text":289,"correct":26},"普通螺栓与高强螺栓从中间开始，对称向两边进行紧固",{"key":31,"text":291,"correct":26},"高强度螺栓终拧后，螺栓丝扣普遍外露2～3扣，有10%的外露1扣或4扣",{"id":293,"libraryId":5,"type":100,"typeLabel":101,"stem":294,"options":295,"answer":31,"analysis":37},1121146,"关于砌体结构施工的做法,错误的是（ ）。",[296,298,300,302],{"key":20,"text":297,"correct":26},"施工现场砌块堆放整齐,堆放高度1.9m",{"key":24,"text":299,"correct":26},"常温情况下砌筑砖砌体时,提前2d浇水湿润",{"key":28,"text":301,"correct":26},"砖砌体的水平灰缝厚度为11mm",{"key":31,"text":303,"correct":22},"抗震设防烈度8度时,不能同时砌筑又必须留置的临时间断处砌成直搓",{"id":305,"libraryId":5,"type":100,"typeLabel":101,"stem":306,"options":307,"answer":31,"analysis":37},1121147,"在主体结构施工中,关于混凝土工程施工说法错误的是（ ）。",[308,310,312,314],{"key":20,"text":309,"correct":26},"粗骨料最大粒径应不超过结构截面最小尺寸的1\u002F4,同时不得大于钢筋间最小净距的3\u002F4",{"key":24,"text":311,"correct":26},"采用搅拌运输车运送混凝土时,卸料前宜快速旋转搅拌20s以上后再卸料",{"key":28,"text":313,"correct":26},"有主次梁的楼板垂直施工缝应留设在次梁跨中1\u002F3范围内",{"key":31,"text":315,"correct":22},"在浇筑竖向结构混凝土前,应先在底部填以不大于50mm厚与混凝土中水泥、砂配比成分相同的水泥砂浆",{"id":317,"libraryId":5,"type":100,"typeLabel":101,"stem":318,"options":319,"answer":28,"analysis":37},1121148,"模板工程设计的主要原则不包括（ ）。",[320,322,324,326],{"key":20,"text":321,"correct":26},"安全性",{"key":24,"text":323,"correct":26},"实用性",{"key":28,"text":325,"correct":22},"耐久性",{"key":31,"text":327,"correct":26},"经济性",{"id":329,"libraryId":5,"type":100,"typeLabel":101,"stem":330,"options":331,"answer":28,"analysis":37},1121149,"其跨度为2m的板，设计混凝土强度等级为C30，则拆模时同条件养护的标准立方体试块的抗压强度标准值不低于（ ）。",[332,334,336,338],{"key":20,"text":333,"correct":26},"5N\u002Fm3",{"key":24,"text":335,"correct":26},"10N\u002Fm3",{"key":28,"text":337,"correct":22},"15N\u002Fm3",{"key":31,"text":339,"correct":26},"20N\u002Fm3",{"id":341,"libraryId":5,"type":100,"typeLabel":101,"stem":342,"options":343,"answer":20,"analysis":37},1121150,"常用模板中，具有制作、拼装灵活，较适用于外形复杂或异形混凝土构件及冬期施工的混凝土工程的混凝土等特点的是（ ）。",[344,346,348,350],{"key":20,"text":345,"correct":22},"木模板",{"key":24,"text":347,"correct":26},"组合钢模板",{"key":28,"text":349,"correct":26},"钢框木胶合板模板",{"key":31,"text":351,"correct":26},"钢大模板",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":366,"analysis":37},1121151,"钢筋混凝土结构中,关于模板工程的说法错误的有（ ）。",[356,358,360,362,364],{"key":20,"text":357,"correct":22},"对于跨度不小于8m的现浇钢筋混凝土梁,当设计无具体要求时,起拱高度应为跨度的1\u002F1000~3\u002F1000",{"key":24,"text":359,"correct":22},"跨度不大于8m的梁底模及支架拆除时,其混凝土强度应达到设计的混凝土立方体抗压强度标准值的100%时方可拆模",{"key":28,"text":361,"correct":26},"模板设计无具体要求,先拆非承重的模板,后拆承重的模板",{"key":31,"text":363,"correct":22},"后张预应力混凝土结构底模在预应力张拉前拆除完毕",{"key":34,"text":365,"correct":26},"拆除申请手续经项目技术负责人批准后,开始拆模","ABD",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":381,"analysis":37},1121152,"钢结构用防火涂料按涂层厚度可分（ ）等几类。",[371,373,375,377,379],{"key":20,"text":372,"correct":22},"B类",{"key":24,"text":374,"correct":26},"D类",{"key":28,"text":376,"correct":26},"F类",{"key":31,"text":378,"correct":26},"G类",{"key":34,"text":380,"correct":22},"H类","AE",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":366,"analysis":37},1121153,"模板工程设计的安全性指标包括（ ）。",[386,388,390,392,394],{"key":20,"text":387,"correct":22},"强度",{"key":24,"text":389,"correct":22},"刚度",{"key":28,"text":391,"correct":26},"平整度",{"key":31,"text":393,"correct":22},"稳定性",{"key":34,"text":395,"correct":26},"适用性",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":410,"analysis":37},1121154,"下列选项中，不得在（ ）等墙体或部位没置脚手架。",[400,402,404,406,408],{"key":20,"text":401,"correct":22},"120mm厚墙、料石清水墙和独立柱",{"key":24,"text":403,"correct":22},"过梁上或过梁成60度角的三角形范围及过梁净跨度1\u002F2的高度范围内",{"key":28,"text":405,"correct":22},"宽度小于1m的窗间墙",{"key":31,"text":407,"correct":26},"砌体门窗洞口两侧200mm和转角处石砌体550mm范围内",{"key":34,"text":409,"correct":26},"梁或梁垫下下及其左右600mm范围内","ABC",{"id":412,"libraryId":5,"type":100,"typeLabel":101,"stem":413,"options":414,"answer":28,"analysis":37},1121155,"混凝土施工缝宜留在结构受（ ）较小且便于施工的部位。",[415,417,419,421],{"key":20,"text":416,"correct":26},"荷载",{"key":24,"text":418,"correct":26},"弯矩",{"key":28,"text":420,"correct":22},"剪力",{"key":31,"text":422,"correct":26},"压力",{"id":424,"libraryId":5,"type":100,"typeLabel":101,"stem":425,"options":426,"answer":20,"analysis":37},1121156,"柱、墙水平施工缝也可留设在楼层结构底面，施工缝与结构下表面的距离宜为（ ）。",[427,429,431,433],{"key":20,"text":428,"correct":22},"0～50mm",{"key":24,"text":430,"correct":26},"10～50mm",{"key":28,"text":432,"correct":26},"0～100mm",{"key":31,"text":434,"correct":26},"10～100mm",{"id":436,"libraryId":5,"type":100,"typeLabel":101,"stem":437,"options":438,"answer":24,"analysis":37},1121157,"砖砌体留直槎时应加设拉结筋，拉结筋应沿墙高每（ ）mm留一道。",[439,441,442,444],{"key":20,"text":440,"correct":26},"300",{"key":24,"text":195,"correct":22},{"key":28,"text":443,"correct":26},"750",{"key":31,"text":193,"correct":26},{"id":446,"libraryId":5,"type":100,"typeLabel":101,"stem":447,"options":448,"answer":31,"analysis":37},1121159,"某悬挑长度为1.2m、设计强度等级为C30的现浇混凝土阳台板，拆除底模时，其混凝土强度至少应达到（ ）。",[449,451,453,455],{"key":20,"text":450,"correct":26},"15N\u002Fmm2",{"key":24,"text":452,"correct":26},"21N\u002Fmm2",{"key":28,"text":454,"correct":26},"22.5N\u002Fmm2",{"key":31,"text":456,"correct":22},"30N\u002Fmm2",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":82,"analysis":37},1121160,"关于砌筑砂浆稠度的说法，正确的有（ ）。",[461,463,465,467,469],{"key":20,"text":462,"correct":26},"雨期施工，砂浆的稠度值应适当增加",{"key":24,"text":464,"correct":22},"冬期施工，砂浆稠度宜较常温增大，且不得二次加水调整砂浆的和宜性",{"key":28,"text":466,"correct":22},"当在干热条件下砌筑时，应选用较大稠度值的砂浆",{"key":31,"text":468,"correct":22},"当在湿冷条件下砌筑时，应选用较小稠度值的砂浆",{"key":34,"text":470,"correct":26},"当砌筑材料为粗糙多孔且吸水较大的块料时，应选用较小稠度值的砂浆",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":485,"analysis":37},1121161,"关于混凝土自然养护的说法，符合相关规定的有（ ）。",[475,477,479,481,483],{"key":20,"text":476,"correct":26},"掺有缓凝型外加剂的混凝土，不得少于21d",{"key":24,"text":478,"correct":22},"在混凝土浇筑完毕后，应在8~12h以内加以覆盖和浇水",{"key":28,"text":480,"correct":22},"硅酸盐水泥拌制的混凝土，不得少于7d",{"key":31,"text":482,"correct":22},"矿渣硅酸盐水泥拌制的混凝土，不得少于7d",{"key":34,"text":484,"correct":22},"有抗渗性要求的混凝土，不得少于14d","BCDE",{"id":487,"libraryId":5,"type":100,"typeLabel":101,"stem":488,"options":489,"answer":28,"analysis":37},1121162,"下列砌筑加气混凝土砌块时错缝搭接的做法中，正确的是（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":26},"搭砌长度不应小于1\u002F4砌块长",{"key":24,"text":493,"correct":26},"搭砌长度不应小于100mm",{"key":28,"text":495,"correct":22},"搭砌长度不应小于砌块长度的1\u002F3",{"key":31,"text":497,"correct":26},"搭砌的同时应在水平灰缝内设2φ4的钢筋网片",{"id":499,"libraryId":5,"type":100,"typeLabel":101,"stem":500,"options":501,"answer":24,"analysis":37},1121163,"砖砌体墙体施工时，其分段位置宜设在（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":26},"墙长的中间部位",{"key":24,"text":505,"correct":22},"墙体门窗洞口处",{"key":28,"text":507,"correct":26},"墙断面尺寸较大部位",{"key":31,"text":509,"correct":26},"墙断面尺寸较小部位",{"id":511,"libraryId":5,"type":100,"typeLabel":101,"stem":512,"options":513,"answer":24,"analysis":37},1121164,"砖砌体工程中可设置脚手眼的墙体或部位是（ ）。",[514,516,518,520],{"key":20,"text":515,"correct":26},"120mm厚墙",{"key":24,"text":517,"correct":22},"砌体门窗洞口两侧450mm处",{"key":28,"text":519,"correct":26},"独立柱",{"key":31,"text":521,"correct":26},"宽度为800mm的窗间墙",{"id":523,"libraryId":5,"type":100,"typeLabel":101,"stem":524,"options":525,"answer":28,"analysis":37},1121165,"对于有主次梁的楼板，如混凝土不能连续浇筑完毕，施工缝应留置在（ ）1\u002F3的范围内。",[526,528,530,532],{"key":20,"text":527,"correct":26},"主梁跨中",{"key":24,"text":529,"correct":26},"主梁支座",{"key":28,"text":531,"correct":22},"次梁跨中",{"key":31,"text":533,"correct":26},"次梁支座",{"id":535,"libraryId":5,"type":100,"typeLabel":101,"stem":536,"options":537,"answer":24,"analysis":37},1121166,"砌筑施工时，下列部位可留脚手眼的是（ ）。",[538,540,542,544],{"key":20,"text":539,"correct":26},"120mm厚的墙",{"key":24,"text":541,"correct":22},"宽度1.1m的窗间墙",{"key":28,"text":543,"correct":26},"梁下及其左右500mm范围内",{"key":31,"text":545,"correct":26},"过梁上与过梁成60度角三角形范围内及过梁跨度1\u002F2高度范围内",{"id":547,"libraryId":5,"type":100,"typeLabel":101,"stem":548,"options":549,"answer":24,"analysis":37},1121167,"后浇带通常根据设计要求留设，至少保留（ ）d后再浇筑，将结构连成整体。",[550,552,554,556],{"key":20,"text":551,"correct":26},"7",{"key":24,"text":553,"correct":22},"14",{"key":28,"text":555,"correct":26},"21",{"key":31,"text":557,"correct":26},"28",{"id":559,"libraryId":5,"type":100,"typeLabel":101,"stem":560,"options":561,"answer":28,"analysis":37},1121168,"砌体工程施工时，所用的普通混凝土小型空心砌块龄期不足（ ）d的不得施工。",[562,563,564,565],{"key":20,"text":553,"correct":26},{"key":24,"text":555,"correct":26},{"key":28,"text":557,"correct":22},{"key":31,"text":566,"correct":26},"45",{"id":568,"libraryId":5,"type":100,"typeLabel":101,"stem":569,"options":570,"answer":20,"analysis":37},1121169,"梁、板钢筋绑扎时，板、次梁与主梁交叉处，下列叙述正确的是（ ）。",[571,573,575,577],{"key":20,"text":572,"correct":22},"板的钢筋在上，次梁的钢筋居中，主梁的钢筋在下；当有圈梁或垫梁时，主梁的钢筋在上",{"key":24,"text":574,"correct":26},"次梁的钢筋在上，板的钢筋居中，主梁的钢筋在下；当有圈梁或垫梁时，主梁的钢筋在上",{"key":28,"text":576,"correct":26},"板的钢筋在上，主梁的钢筋居中，次梁的钢筋在下；当有圈梁或垫梁时，主梁的钢筋在下",{"key":31,"text":578,"correct":26},"主梁的钢筋在上，次梁的钢筋居中，板的钢筋在下；当有圈梁或垫梁时，主梁的钢筋在下",{"id":580,"libraryId":5,"type":100,"typeLabel":101,"stem":581,"options":582,"answer":24,"analysis":37},1121170,"砌筑墙体中，可以不设置过梁的洞口最大宽度为（ ）。",[583,585,587,589],{"key":20,"text":584,"correct":26},"250mm",{"key":24,"text":586,"correct":22},"300mm",{"key":28,"text":588,"correct":26},"400mm",{"key":31,"text":590,"correct":26},"500mm",{"id":592,"libraryId":5,"type":100,"typeLabel":101,"stem":593,"options":594,"answer":31,"analysis":37},1121171,"跨度大于8m的混凝土现浇梁，当混凝土强度达到设计的混凝土立方体抗压强度标准值的（ ）时，方可拆除底模及其支架。",[595,597,599,601],{"key":20,"text":596,"correct":26},"50%",{"key":24,"text":598,"correct":26},"70%",{"key":28,"text":600,"correct":26},"80%",{"key":31,"text":602,"correct":22},"100%",{"id":604,"libraryId":5,"type":100,"typeLabel":101,"stem":605,"options":606,"answer":28,"analysis":37},1121172,"某现浇钢筋混凝土梁的跨度为9m，其跨中起拱高度可为（ ）。",[607,609,611,613],{"key":20,"text":608,"correct":26},"2mm",{"key":24,"text":610,"correct":26},"5mm",{"key":28,"text":612,"correct":22},"15mm",{"key":31,"text":614,"correct":26},"30mm",{"id":616,"libraryId":5,"type":100,"typeLabel":101,"stem":617,"options":618,"answer":24,"analysis":37},1121173,"某工厂吊车梁纵向受力钢筋采用直径为28mm的HRB335级钢筋，其受力钢筋连接应采用（ ）。",[619,621,623,625],{"key":20,"text":620,"correct":26},"焊接",{"key":24,"text":622,"correct":22},"机械连接",{"key":28,"text":624,"correct":26},"绑扎连接",{"key":31,"text":626,"correct":26},"铆接",{"id":628,"libraryId":5,"type":100,"typeLabel":101,"stem":629,"options":630,"answer":24,"analysis":37},1121174,"现浇钢筋混凝土楼盖施工中，梁的跨度为6m，板的跨度为4m，当设计无特别要求时，楼盖拆模时现场混凝土强度应达到设计强度的（ ）。",[631,632,634,636],{"key":20,"text":596,"correct":26},{"key":24,"text":633,"correct":22},"75%",{"key":28,"text":635,"correct":26},"90%",{"key":31,"text":602,"correct":26},{"id":638,"libraryId":5,"type":100,"typeLabel":101,"stem":639,"options":640,"answer":28,"analysis":37},1121175,"墙模板内混凝土浇筑（粗骨料最大粒径36.5mm）时出料口距离工作面达到（ ）及以上时，应采用溜槽或串筒的措施。",[641,643,645,647],{"key":20,"text":642,"correct":26},"1m",{"key":24,"text":644,"correct":26},"2m",{"key":28,"text":646,"correct":22},"3m",{"key":31,"text":648,"correct":26},"5m",[650,653,656,659,662,665],{"id":100,"name":651,"category":7,"favorite":652},"领导干部任职前廉政法规知识测试题",92,{"id":654,"name":655,"category":7,"favorite":100},595,"建筑结构与设备",{"id":657,"name":658,"category":7,"favorite":100},715,"招标采购专业知识与法律法规",{"id":660,"name":661,"category":7,"favorite":100},848,"市政方向-通用基础",{"id":663,"name":664,"category":7,"favorite":8},534,"BIM工程师",{"id":666,"name":664,"category":7,"favorite":8},535]