[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-790-21":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":682},{"id":5,"name":6,"category":7,"favorite":8},790,"二建建筑工程实务","建筑工程",0,21,50,2588,[13,38,53,68,82,97,110,124,138,153,168,182,196,210,225,239,251,263,273,285,295,307,319,333,348,360,374,388,402,416,430,442,453,465,477,488,500,512,524,536,548,560,572,584,596,610,624,638,652,667],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1121075,2,"多选题","应当在基坑底普遍进行轻型动力触探的情形有( )。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","持力层明显不均匀",true,{"key":24,"text":25,"correct":22},"B","浅部有软弱下卧层",{"key":27,"text":28,"correct":29},"C","基槽底面坡度较大，高差悬殊",false,{"key":31,"text":32,"correct":29},"D","基槽底面与设计标高相差太大",{"key":34,"text":35,"correct":22},"E","有直接观察难以发现的浅埋坑穴、古墓、古井","ABE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1121076,"基坑验槽时下列单位必须参加的有( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"施工单位",{"key":24,"text":45,"correct":22},"勘察单位",{"key":27,"text":47,"correct":22},"业主（监理）",{"key":31,"text":49,"correct":22},"设计单位",{"key":34,"text":51,"correct":29},"质监站","ABCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1121077,"钎探是根据( )来判断土的软硬情况及有无古井、古墓、洞穴、地下掩埋物等。",[57,59,61,63,65],{"key":20,"text":58,"correct":29},"钎孔大小",{"key":24,"text":60,"correct":29},"用力大小",{"key":27,"text":62,"correct":22},"锤击次数",{"key":31,"text":64,"correct":29},"入土深度",{"key":34,"text":66,"correct":22},"入土难易程度","CE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":36,"analysis":37},1121078,"下列有利于大体积混凝土施工的措施有( )。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"掺入一定量的粉煤灰",{"key":24,"text":75,"correct":22},"采用二次抹面工艺",{"key":27,"text":77,"correct":29},"适当提高水灰比",{"key":31,"text":79,"correct":29},"选用硅酸盐水泥",{"key":34,"text":81,"correct":22},"采用人工降温措施，降低混凝土的浇筑温度",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1121079,"观察验槽的内容主要有( )。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"基槽的开挖平面位置、尺寸、槽底深度",{"key":24,"text":89,"correct":22},"槽壁、槽底土质类型、均匀程度",{"key":27,"text":91,"correct":29},"观察基坑四周支护情况",{"key":31,"text":93,"correct":22},"基槽之中是否有旧建筑物基础、古井、古墓",{"key":34,"text":95,"correct":22},"基槽边坡外缘与附近建筑物的距离","ABDE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":36,"analysis":37},1121080,"关于大体积混凝土施工的措施，正确的有( )",[101,103,105,107,108],{"key":20,"text":102,"correct":22},"掺入一定量的缓凝减水剂",{"key":24,"text":104,"correct":22},"掺入适量微膨胀剂",{"key":27,"text":106,"correct":29},"尽量增加水泥用量",{"key":31,"text":79,"correct":29},{"key":34,"text":109,"correct":22},"采用人工降温措施，降低混凝土的入模温度",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":123,"analysis":37},1121081,"基坑验槽时,先由施工単位进行自检,然后由( )组织相关単位进行验槽。",[114,116,117,119,121],{"key":20,"text":115,"correct":22},"建设単位项目负责人",{"key":24,"text":45,"correct":29},{"key":27,"text":118,"correct":29},"设计単位项目负责人",{"key":31,"text":120,"correct":29},"施工单位项目负责人",{"key":34,"text":122,"correct":22},"总监理工程师","AE",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":137,"analysis":37},1121082,"下列施工措施中,有利于大体积混凝土裂缝控制的是( )。",[128,130,132,134,136],{"key":20,"text":129,"correct":22},"选用低水化热的水泥",{"key":24,"text":131,"correct":29},"提高水灰比",{"key":27,"text":133,"correct":29},"提高混凝土的入模温度",{"key":31,"text":135,"correct":22},"及时对混凝土进行保温、保湿养护",{"key":34,"text":75,"correct":22},"ADE",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":152,"analysis":37},1121083,"在初凝前对大体积混凝土进行二次振捣,可以( )。",[142,144,146,148,150],{"key":20,"text":143,"correct":22},"提高混凝土与钢筋的握裏力",{"key":24,"text":145,"correct":29},"降低混凝土的水化热",{"key":27,"text":147,"correct":22},"增加混凝土的密实度",{"key":31,"text":149,"correct":22},"提高混凝土抗压强度",{"key":34,"text":151,"correct":22},"减少内部微裂","ACDE",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":167,"analysis":37},1121084,"按成孔方法的不同，混凝土灌注桩分为( )。",[157,159,161,163,165],{"key":20,"text":158,"correct":22},"人工挖孔灌注桩",{"key":24,"text":160,"correct":22},"沉管灌注桩",{"key":27,"text":162,"correct":22},"钻孔灌注桩",{"key":31,"text":164,"correct":29},"静压灌注桩",{"key":34,"text":166,"correct":29},"锤击沉降灌注桩","ABC",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":167,"analysis":37},1121085,"关于混凝土条形基础施工的说法，正确的有( )。",[172,174,176,178,180],{"key":20,"text":173,"correct":22},"宜分段分层连续浇筑",{"key":24,"text":175,"correct":22},"一般不留施工缝",{"key":27,"text":177,"correct":22},"各段层间应相互衔接",{"key":31,"text":179,"correct":29},"每段浇筑长度应控制在4-5m",{"key":34,"text":181,"correct":29},"不宜逐段逐层呈阶梯形向前推进",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":52,"analysis":37},1121086,"验槽应重点观察( )部位。",[186,188,190,192,194],{"key":20,"text":187,"correct":22},"柱基",{"key":24,"text":189,"correct":22},"墙角",{"key":27,"text":191,"correct":22},"承重墙",{"key":31,"text":193,"correct":22},"受力较大部位",{"key":34,"text":195,"correct":29},"受力较小部位",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":167,"analysis":37},1121087,"大体积混凝土的浇筑方案主要有( )等方式。",[200,202,204,206,208],{"key":20,"text":201,"correct":22},"全面分层",{"key":24,"text":203,"correct":22},"分段分层",{"key":27,"text":205,"correct":22},"斜面分层",{"key":31,"text":207,"correct":29},"竖直分层",{"key":34,"text":209,"correct":29},"交错分层",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":224,"analysis":37},1121088,"地基验槽中采用钎探法时，同一单位工程中各钎探点打钎应( )。",[214,216,218,220,222],{"key":20,"text":215,"correct":22},"钎径一致",{"key":24,"text":217,"correct":29},"钎探耗时一致",{"key":27,"text":219,"correct":22},"锤重一致",{"key":31,"text":221,"correct":22},"用力（落距）一致",{"key":34,"text":223,"correct":29},"锤击数一致","ACD",{"id":226,"libraryId":5,"type":227,"typeLabel":228,"stem":229,"options":230,"answer":31,"analysis":37},1121089,1,"单选题","浅基坑土方开挖中，基坑边缘堆置土方和建筑材料，一般应据基坑上部边缘不少于( )m。",[231,233,235,237],{"key":20,"text":232,"correct":29},"1",{"key":24,"text":234,"correct":29},"1.2",{"key":27,"text":236,"correct":29},"1.8",{"key":31,"text":238,"correct":22},"2",{"id":240,"libraryId":5,"type":227,"typeLabel":228,"stem":241,"options":242,"answer":31,"analysis":37},1121090,"砖基础的转角处和交接处应同时砌筑；当不能同时砌筑时，应留置( )。",[243,245,247,249],{"key":20,"text":244,"correct":29},"凸槎",{"key":24,"text":246,"correct":29},"凹槎",{"key":27,"text":248,"correct":29},"直槎",{"key":31,"text":250,"correct":22},"斜槎",{"id":252,"libraryId":5,"type":227,"typeLabel":228,"stem":253,"options":254,"answer":24,"analysis":37},1121091,"当设计对砖基础墙防潮层无具体要求时，防潮层宜采用加适量防水剂的1：2水泥砂浆铺设，其厚度宜为( )。",[255,257,259,261],{"key":20,"text":256,"correct":29},"10mm",{"key":24,"text":258,"correct":22},"20mm",{"key":27,"text":260,"correct":29},"30mm",{"key":31,"text":262,"correct":29},"40mm",{"id":264,"libraryId":5,"type":227,"typeLabel":228,"stem":265,"options":266,"answer":27,"analysis":37},1121092,"毛石基础接槎应做成( )。",[267,268,269,271],{"key":20,"text":248,"correct":29},{"key":24,"text":250,"correct":29},{"key":27,"text":270,"correct":22},"阶梯式",{"key":31,"text":272,"correct":29},"马牙槎",{"id":274,"libraryId":5,"type":227,"typeLabel":228,"stem":275,"options":276,"answer":20,"analysis":37},1121093,"基坑排水明沟边缘与边坡坡脚的距离应不小于( )。",[277,279,281,283],{"key":20,"text":278,"correct":22},"0.5m",{"key":24,"text":280,"correct":29},"0.4m",{"key":27,"text":282,"correct":29},"0.3m",{"key":31,"text":284,"correct":29},"0.2m",{"id":286,"libraryId":5,"type":227,"typeLabel":228,"stem":287,"options":288,"answer":24,"analysis":37},1121094,"基坑侧壁安全等级为二级时，其采用的相对应的重要系数是( )。",[289,291,292,294],{"key":20,"text":290,"correct":29},"0.9",{"key":24,"text":232,"correct":22},{"key":27,"text":293,"correct":29},"1.1",{"key":31,"text":234,"correct":29},{"id":296,"libraryId":5,"type":227,"typeLabel":228,"stem":297,"options":298,"answer":20,"analysis":37},1121095,"安全等级为( )的基坑工程以及其他需要检测的基坑工程应实施基坑工程监测。",[299,301,303,305],{"key":20,"text":300,"correct":22},"1~2",{"key":24,"text":302,"correct":29},"2~3",{"key":27,"text":304,"correct":29},"1~3",{"key":31,"text":306,"correct":29},"3",{"id":308,"libraryId":5,"type":227,"typeLabel":228,"stem":309,"options":310,"answer":27,"analysis":37},1121096,"基坑监测点水平间距不宜大于( )。",[311,313,315,317],{"key":20,"text":312,"correct":29},"25-30m",{"key":24,"text":314,"correct":29},"20-25m",{"key":27,"text":316,"correct":22},"15-20m",{"key":31,"text":318,"correct":29},"14-24m",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":52,"analysis":37},1121097,"基坑开挖时，应对平面控制桩、( )等经常进行检查。",[323,325,327,329,331],{"key":20,"text":324,"correct":22},"水准点",{"key":24,"text":326,"correct":22},"基坑平面位置",{"key":27,"text":328,"correct":22},"水平标高",{"key":31,"text":330,"correct":22},"边坡坡度",{"key":34,"text":332,"correct":29},"地基承载力",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":347,"analysis":37},1121098,"关于土方的填筑与压实，下列说法正确的是( )。",[337,339,341,343,345],{"key":20,"text":338,"correct":22},"填土应从最低处开始分层进行",{"key":24,"text":340,"correct":22},"填方应尽量采用同类土填筑",{"key":27,"text":342,"correct":29},"基础墙两侧应分别回填夯实",{"key":31,"text":344,"correct":22},"当天填土，应在当天压实",{"key":34,"text":346,"correct":29},"当填方高度大于10m时，填方边坡坡度可采用1：1.5","ABD",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":359,"analysis":37},1121099,"验槽的主要内容有( )。",[352,354,355,356,358],{"key":20,"text":353,"correct":29},"基槽支护情况",{"key":24,"text":87,"correct":22},{"key":27,"text":89,"correct":22},{"key":31,"text":357,"correct":22},"基槽之中是否有旧建筑物基础、古井、古墓、洞穴和地下掩埋物等",{"key":34,"text":95,"correct":22},"BCDE",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":96,"analysis":37},1121100,"砖、石基础属刚性基础，其特点包括( )。",[364,366,368,370,372],{"key":20,"text":365,"correct":22},"抗压性能好",{"key":24,"text":367,"correct":22},"整体性差",{"key":27,"text":369,"correct":29},"抗剪性能好",{"key":31,"text":371,"correct":22},"施工操作简便",{"key":34,"text":373,"correct":22},"造价较低",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":52,"analysis":37},1121101,"阶梯形毛石基础应符合下列规定( )。",[378,380,382,384,386],{"key":20,"text":379,"correct":22},"每一台阶应不少于2～3皮毛石",{"key":24,"text":381,"correct":22},"每阶高度不小于40cm",{"key":27,"text":383,"correct":22},"相邻阶梯的毛石应相互错缝搭",{"key":31,"text":385,"correct":22},"每阶宽度应不小于20cm",{"key":34,"text":387,"correct":29},"上级阶梯的石块至少压砌下阶梯石块的1\u002F3",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":401,"analysis":37},1121102,"采用泥浆护壁法成桩的灌注桩有( )。",[392,394,396,398,399],{"key":20,"text":393,"correct":29},"长螺旋钻孔灌注桩",{"key":24,"text":395,"correct":22},"反循环钻孔灌注桩",{"key":27,"text":397,"correct":22},"旋挖成孔灌注桩",{"key":31,"text":160,"correct":29},{"key":34,"text":400,"correct":22},"正循环钻孔灌注桩","BCE",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":36,"analysis":37},1121103,"降水井井点管安装完毕后应进行试运转，全面检查( )。",[406,408,410,412,414],{"key":20,"text":407,"correct":22},"管路接头",{"key":24,"text":409,"correct":22},"出水状况",{"key":27,"text":411,"correct":29},"观测孔中的水位",{"key":31,"text":413,"correct":29},"排水沟",{"key":34,"text":415,"correct":22},"机械设备运转情况",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":359,"analysis":37},1121104,"基坑监测项目的监测频率应综合考虑( )来确定。",[420,422,424,426,428],{"key":20,"text":421,"correct":29},"基坑支护结构",{"key":24,"text":423,"correct":22},"基坑类别",{"key":27,"text":425,"correct":22},"基坑施工阶段",{"key":31,"text":427,"correct":22},"自然条件的变化",{"key":34,"text":429,"correct":22},"当地经验",{"id":431,"libraryId":5,"type":227,"typeLabel":228,"stem":432,"options":433,"answer":24,"analysis":37},1121105,"有关对混凝土构件施工缝的留置位置的说法正确的是（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":29},"单向板应垂直于板的短边方向留置",{"key":24,"text":437,"correct":22},"柱宜留置在基础、楼板、梁的顶面",{"key":27,"text":439,"correct":29},"有主次梁的楼板宜顺着主梁方向留置",{"key":31,"text":441,"correct":29},"梁、板应斜向留置",{"id":443,"libraryId":5,"type":227,"typeLabel":228,"stem":444,"options":445,"answer":20,"analysis":37},1121106,"跨度大于（ ）m的板，现浇混凝土达到立方抗压强度标准值的100%时方可拆除底模板。",[446,448,450,451],{"key":20,"text":447,"correct":22},"8",{"key":24,"text":449,"correct":29},"6",{"key":27,"text":238,"correct":29},{"key":31,"text":452,"correct":29},"7.5",{"id":454,"libraryId":5,"type":227,"typeLabel":228,"stem":455,"options":456,"answer":31,"analysis":37},1121107,"钢结构工程，使用普通螺栓连接时，其紧固次序为（ ）。",[457,459,461,463],{"key":20,"text":458,"correct":29},"从单侧开始，向另一侧进行",{"key":24,"text":460,"correct":29},"从两边开始，对称向中间进行",{"key":27,"text":462,"correct":29},"从中间开始，单侧进行",{"key":31,"text":464,"correct":22},"从中间开始，对称向两边进行",{"id":466,"libraryId":5,"type":227,"typeLabel":228,"stem":467,"options":468,"answer":31,"analysis":37},1121108,"大体积混凝土养护期间必须控制混凝土内外温差，当设计无要求时，应控制在（ ）以内。",[469,471,473,475],{"key":20,"text":470,"correct":29},"10℃",{"key":24,"text":472,"correct":29},"15℃",{"key":27,"text":474,"correct":29},"20℃",{"key":31,"text":476,"correct":22},"25℃",{"id":478,"libraryId":5,"type":227,"typeLabel":228,"stem":479,"options":480,"answer":24,"analysis":37},1121109,"首层跨度4.5m梁模板起拱高度是（ ）mm。",[481,482,484,486],{"key":20,"text":306,"correct":29},{"key":24,"text":483,"correct":22},"10",{"key":27,"text":485,"correct":29},"15",{"key":31,"text":487,"correct":29},"20",{"id":489,"libraryId":5,"type":227,"typeLabel":228,"stem":490,"options":491,"answer":27,"analysis":37},1121110,"钢筋备料、加工的依据是（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":29},"构件配筋图",{"key":24,"text":495,"correct":29},"钢筋施工图",{"key":27,"text":497,"correct":22},"钢筋配料单",{"key":31,"text":499,"correct":29},"钢筋下料单",{"id":501,"libraryId":5,"type":227,"typeLabel":228,"stem":502,"options":503,"answer":20,"analysis":37},1121111,"防腐涂料涂装施工流程正确的是（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":22},"基面处理→底漆涂装→中间漆涂装→面漆涂装→检查验收",{"key":24,"text":507,"correct":29},"基面处理→面漆涂装→中间漆涂装→底漆涂装→检查验收",{"key":27,"text":509,"correct":29},"面漆涂装→中间漆涂装→底漆涂装→基面处理→检查验收",{"key":31,"text":511,"correct":29},"底漆涂装→中间漆涂装→面漆涂装→基面处理→检查验收",{"id":513,"libraryId":5,"type":227,"typeLabel":228,"stem":514,"options":515,"answer":27,"analysis":37},1121112,"钢筋加工不包括（ ）。",[516,518,520,522],{"key":20,"text":517,"correct":29},"调直",{"key":24,"text":519,"correct":29},"接长",{"key":27,"text":521,"correct":22},"涂料",{"key":31,"text":523,"correct":29},"除锈",{"id":525,"libraryId":5,"type":227,"typeLabel":228,"stem":526,"options":527,"answer":27,"analysis":37},1121113,"梁下部纵向受力钢筋接头位置宜设置在（ ）。",[528,530,532,534],{"key":20,"text":529,"correct":29},"梁跨中1／3处",{"key":24,"text":531,"correct":29},"梁支座处",{"key":27,"text":533,"correct":22},"距梁支座1／3处",{"key":31,"text":535,"correct":29},"可随意设置",{"id":537,"libraryId":5,"type":227,"typeLabel":228,"stem":538,"options":539,"answer":31,"analysis":37},1121114,"当无圈梁和梁垫时，板、次梁与主梁交叉处钢筋的正确排位是（ ）。",[540,542,544,546],{"key":20,"text":541,"correct":29},"主梁筋在上，次梁筋居中，板筋在下",{"key":24,"text":543,"correct":29},"主梁筋居中，次梁筋在下，板筋在上",{"key":27,"text":545,"correct":29},"主梁筋在下，次梁筋在上，板筋居中",{"key":31,"text":547,"correct":22},"主梁筋在下，次梁筋居中，板筋在上",{"id":549,"libraryId":5,"type":227,"typeLabel":228,"stem":550,"options":551,"answer":27,"analysis":37},1121115,"《砌体工程施工质量验收规范》规定，施工时所用的小砌块的产品龄期不应小于（ ）。",[552,554,556,558],{"key":20,"text":553,"correct":29},"12d",{"key":24,"text":555,"correct":29},"24d",{"key":27,"text":557,"correct":22},"28d",{"key":31,"text":559,"correct":29},"36d",{"id":561,"libraryId":5,"type":227,"typeLabel":228,"stem":562,"options":563,"answer":27,"analysis":37},1121116,"已知某钢筋混凝土单向板中受力钢筋的直径d=8mm，外包尺寸为3300mm，钢筋两端弯钩的增长值各为6.25d，钢筋因弯折引起的量度差总值为36mm，则此钢筋的下料长度为（ ）。",[564,566,568,570],{"key":20,"text":565,"correct":29},"3236mm",{"key":24,"text":567,"correct":29},"3314mm",{"key":27,"text":569,"correct":22},"3364mm",{"key":31,"text":571,"correct":29},"3386mm",{"id":573,"libraryId":5,"type":227,"typeLabel":228,"stem":574,"options":575,"answer":20,"analysis":37},1121117,"高强度螺栓的连接形式中，（ ）是目前广泛采用的基本连接形式。",[576,578,580,582],{"key":20,"text":577,"correct":22},"摩擦连接",{"key":24,"text":579,"correct":29},"张拉连接",{"key":27,"text":581,"correct":29},"承压连接",{"key":31,"text":583,"correct":29},"抗剪连接",{"id":585,"libraryId":5,"type":227,"typeLabel":228,"stem":586,"options":587,"answer":24,"analysis":37},1121118,"下列模板中，适宜用于混凝土冬期施工的是（ ）。",[588,590,592,594],{"key":20,"text":589,"correct":29},"组合钢模板",{"key":24,"text":591,"correct":22},"木模板",{"key":27,"text":593,"correct":29},"滑升模板",{"key":31,"text":595,"correct":29},"爬升模板",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":96,"analysis":37},1121119,"混凝土结构工程模板及其支架应根据工程（ ）等条件进行设计。",[600,602,604,606,608],{"key":20,"text":601,"correct":22},"结构形式",{"key":24,"text":603,"correct":22},"荷载大小",{"key":27,"text":605,"correct":29},"混凝土种类",{"key":31,"text":607,"correct":22},"地基土类别",{"key":34,"text":609,"correct":22},"施工设备和材料供应",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":137,"analysis":37},1121120,"关于混凝土施工缝的留置位置，正确的做法有（ ）。",[614,616,618,620,622],{"key":20,"text":615,"correct":22},"柱的施工缝留置在基础的顶面",{"key":24,"text":617,"correct":29},"单向板的施工缝留置在平行于板的长边的任何位置",{"key":27,"text":619,"correct":29},"有主次梁的楼板，施工缝留置在主梁跨中1／3范围内",{"key":31,"text":621,"correct":22},"墙的施工缝留置在门洞口过梁跨中1／3范围内",{"key":34,"text":623,"correct":22},"墙的施工缝留在纵横墙的交接处",{"id":625,"libraryId":5,"type":15,"typeLabel":16,"stem":626,"options":627,"answer":96,"analysis":37},1121121,"关于模板工程的说法中正确的有（ ）。",[628,630,632,634,636],{"key":20,"text":629,"correct":22},"模板安装位置、尺寸，必须满足图纸要求，且应拼缝严密、表面平整并刷隔离剂",{"key":24,"text":631,"correct":22},"模板及其支撑拆除的顺序原则为：后支先拆、先支后拆",{"key":27,"text":633,"correct":29},"施工顺序为：安位放线→模板制作→模板安装、加固→模板的清理、保养→模板验收→模板拆除",{"key":31,"text":635,"correct":22},"模板及其支撑应具有足够的承载能力、刚度和稳定性，能可靠地承受浇筑混凝土的重量、侧压力以及施工荷载",{"key":34,"text":637,"correct":22},"在浇筑混凝土之前，应对模板工程进行验收。模板安装和浇筑混凝土时，应对模板及其支撑进行观察和维护",{"id":639,"libraryId":5,"type":15,"typeLabel":16,"stem":640,"options":641,"answer":347,"analysis":37},1121122,"关于砌体结构施工质量的说法，正确的有（ ）。",[642,644,646,648,650],{"key":20,"text":643,"correct":22},"砂浆强度评定采用边长7.07cm的正方体试件，经过28d标准养护，测得一组三块的抗压强度值来评定",{"key":24,"text":645,"correct":22},"当采用铺浆法砌筑时，铺浆长度不得超过750mm，施工期间气温超过30℃时，铺浆长度不得超过500mm",{"key":27,"text":647,"correct":29},"设有钢筋混凝土构造柱的抗震多层砖房，砖墙应砌成马牙槎，每一马牙槎沿高度方向的尺寸不超过300mm，马牙槎从柱脚开始，先进后退",{"key":31,"text":649,"correct":22},"正常施工条件下砖砌体每日砌筑高度宜控制在1.5m或一步脚手架高度内，石砌体不宜超过1.2m",{"key":34,"text":651,"correct":29},"加气混凝土砌块水平灰缝砂浆饱满度不应小于90%，宽度宜为15mm；竖向灰缝砂浆饱满度不应小于80%，宽度宜为25mm",{"id":653,"libraryId":5,"type":15,"typeLabel":16,"stem":654,"options":655,"answer":666,"analysis":37},1121123,"混凝土应按国家现场标准《普通混凝土配合比设计规程》JGJ55-2011的有关规定，根据混凝土（ ）等要求进行配合比设计。",[656,658,660,662,664],{"key":20,"text":657,"correct":29},"吸水率",{"key":24,"text":659,"correct":22},"强度等级",{"key":27,"text":661,"correct":22},"耐久性",{"key":31,"text":663,"correct":22},"工作性",{"key":34,"text":665,"correct":29},"分层度","BCD",{"id":668,"libraryId":5,"type":15,"typeLabel":16,"stem":669,"options":670,"answer":681,"analysis":37},1121124,"关于通常情况下模板拆除顺序的说法，正确的有（ ）。",[671,673,675,677,679],{"key":20,"text":672,"correct":29},"先支先拆，后支后拆",{"key":24,"text":674,"correct":22},"后支先拆，先支后拆",{"key":27,"text":676,"correct":22},"先拆非承重部分，后拆承重部分",{"key":31,"text":678,"correct":29},"先拆承重部分，后拆非承重部分",{"key":34,"text":680,"correct":29},"先下后上，先内后外","BC",[683,686,689,692,695,698],{"id":227,"name":684,"category":7,"favorite":685},"领导干部任职前廉政法规知识测试题",92,{"id":687,"name":688,"category":7,"favorite":227},595,"建筑结构与设备",{"id":690,"name":691,"category":7,"favorite":227},715,"招标采购专业知识与法律法规",{"id":693,"name":694,"category":7,"favorite":227},848,"市政方向-通用基础",{"id":696,"name":697,"category":7,"favorite":8},534,"BIM工程师",{"id":699,"name":697,"category":7,"favorite":8},535]