[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-790-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":678},{"id":5,"name":6,"category":7,"favorite":8},790,"二建建筑工程实务","建筑工程",0,2,50,2588,[13,37,52,66,78,90,105,117,132,147,162,177,189,201,213,225,237,252,267,282,294,306,321,333,345,357,371,385,400,414,429,441,453,465,477,489,500,510,522,533,547,559,571,583,595,609,620,634,649,664],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":35,"analysis":36},1120112,"多选题","项目施工过程中，应及时对“施工组织设计”进行修改或补充的情况有（ ）。",[18,22,25,28,31],{"key":19,"text":20,"correct":21},"A","桩基的设计持力层变更",true,{"key":23,"text":24,"correct":21},"B","工期目标重大调整",{"key":26,"text":27,"correct":21},"C","现场增设三台塔吊",{"key":29,"text":30,"correct":21},"D","预制管桩改为钻孔灌注桩",{"key":32,"text":33,"correct":34},"E","更换劳务分包单位",false,"ABCD","",{"id":38,"libraryId":5,"type":9,"typeLabel":15,"stem":39,"options":40,"answer":51,"analysis":36},1120113,"绿色施工“四节一环保”中的“四节”指（ ）。",[41,43,45,47,49],{"key":19,"text":42,"correct":21},"节地",{"key":23,"text":44,"correct":21},"节材",{"key":26,"text":46,"correct":34},"节电",{"key":29,"text":48,"correct":21},"节水",{"key":32,"text":50,"correct":21},"节能","ABDE",{"id":53,"libraryId":5,"type":54,"typeLabel":55,"stem":56,"options":57,"answer":29,"analysis":36},1120114,1,"单选题","下列内容中，不属于绿色施工“四节”范畴的是（ ）。",[58,60,62,64],{"key":19,"text":59,"correct":34},"节约能源",{"key":23,"text":61,"correct":34},"节约用地",{"key":26,"text":63,"correct":34},"节的用水",{"key":29,"text":65,"correct":21},"节约用工",{"id":67,"libraryId":5,"type":54,"typeLabel":55,"stem":68,"options":69,"answer":23,"analysis":36},1120115,"利用绿化代替场地硬化，属于绿色施工中的（ ）。",[70,72,74,76],{"key":19,"text":71,"correct":34},"节材与材料资源利用",{"key":23,"text":73,"correct":21},"节地与施工用地保护",{"key":26,"text":75,"correct":34},"节能与能源利用",{"key":29,"text":77,"correct":34},"节水与水资源利用",{"id":79,"libraryId":5,"type":54,"typeLabel":55,"stem":80,"options":81,"answer":19,"analysis":36},1120116,"根据相关规范，门窗工程中不需要进行性能复验的项目是（ ）。",[82,84,86,88],{"key":19,"text":83,"correct":21},"人造木板门复验氨的含量",{"key":23,"text":85,"correct":34},"外墙塑料窗复验抗风压性能",{"key":26,"text":87,"correct":34},"外墙金属窗复验雨水渗漏性能",{"key":29,"text":89,"correct":34},"外墙金属窗复验空气渗透性能",{"id":91,"libraryId":5,"type":9,"typeLabel":15,"stem":92,"options":93,"answer":104,"analysis":36},1120117,"根据《建筑装饰装修工程质量验收规范》（GB 50210），外墙金属窗工程必须进行的安全与功能检测项目有（ ）。",[94,96,98,100,102],{"key":19,"text":95,"correct":34},"硅酮结构胶相容性试验",{"key":23,"text":97,"correct":21},"抗风压性能",{"key":26,"text":99,"correct":21},"空气渗透性能",{"key":29,"text":101,"correct":21},"雨水渗漏性能",{"key":32,"text":103,"correct":34},"后置埋件现场拉拔试验","BCD",{"id":106,"libraryId":5,"type":54,"typeLabel":55,"stem":107,"options":108,"answer":19,"analysis":36},1120118,"高大模板扣件式钢管支撑脚手架中，必须采用对接扣件连接的是（ ）。",[109,111,113,115],{"key":19,"text":110,"correct":21},"立杆",{"key":23,"text":112,"correct":34},"水平杆",{"key":26,"text":114,"correct":34},"竖向剪刀撑",{"key":29,"text":116,"correct":34},"水平剪刀撑",{"id":118,"libraryId":5,"type":9,"typeLabel":15,"stem":119,"options":120,"answer":131,"analysis":36},1120119,"某搭设高度45m的落地式钢管脚手架工程，下列做法正确的有（ ）。",[121,123,125,127,129],{"key":19,"text":122,"correct":34},"采用拉筋和顶撑配合使用的附墙连接方式",{"key":23,"text":124,"correct":34},"每搭设完15m进行一次检查和验收",{"key":26,"text":126,"correct":21},"停工两个月后，重新开工时，对脚手架进行检查、验收",{"key":29,"text":128,"correct":21},"每层连墙件均在其上部可拆杆件全部拆除完成后才进行拆除",{"key":32,"text":130,"correct":21},"遇六级大风，停止脚手架拆除作业","CDE",{"id":133,"libraryId":5,"type":9,"typeLabel":15,"stem":134,"options":135,"answer":146,"analysis":36},1120120,"关于移动式操作平台安全控制的说法，正确的有（ ）",[136,138,140,142,144],{"key":19,"text":137,"correct":21},"台面面积不得超过10m2",{"key":23,"text":139,"correct":34},"允许带不多于2人移动",{"key":26,"text":141,"correct":21},"台面高度不得超过5m",{"key":29,"text":143,"correct":21},"台面脚手板要铺满钉牢固",{"key":32,"text":145,"correct":21},"台面四周设防护栏杆","ACDE",{"id":148,"libraryId":5,"type":9,"typeLabel":15,"stem":149,"options":150,"answer":161,"analysis":36},1120121,"关于塔吊安装、拆除的说法，正确的有（ ）。",[151,153,155,157,159],{"key":19,"text":152,"correct":21},"塔吊安装、拆除之前，应制定专项施工方案",{"key":23,"text":154,"correct":34},"安装和拆除塔吊的专业队伍可不具备相应资质，但需有类似施工经验",{"key":26,"text":156,"correct":21},"塔吊安装完毕，经验收合格，取得政府相关部门核发的《准用证》后方可使用",{"key":29,"text":158,"correct":21},"施工现场多塔作业，塔机间应保持安全距离",{"key":32,"text":160,"correct":34},"塔吊在六级大风中作业时，应减缓起吊速度","ACD",{"id":163,"libraryId":5,"type":9,"typeLabel":15,"stem":164,"options":165,"answer":176,"analysis":36},1120122,"下列垂直运输机械的安全控制做法中，正确的有（ ）。",[166,168,170,172,174],{"key":19,"text":167,"correct":34},"高度23m的物料提升机采用1组缆风绳",{"key":23,"text":169,"correct":34},"在外用电梯底笼周围2.0m范围内设置牢固的防护栏杆",{"key":26,"text":171,"correct":21},"塔吊基础的设计计算作为固定式塔吊专项施工方案内容之一",{"key":29,"text":173,"correct":21},"现场多塔作业时，塔机间保持安全距离",{"key":32,"text":175,"correct":34},"遇六级大风以上恶劣天气时，塔吊停止作业，并将吊钩放下","CD",{"id":178,"libraryId":5,"type":54,"typeLabel":55,"stem":179,"options":180,"answer":29,"analysis":36},1120123,"双排扣件式钢管脚手架的主节点是指（ ）。",[181,183,185,187],{"key":19,"text":182,"correct":34},"连墙件与架体连接处",{"key":23,"text":184,"correct":34},"剪刀撑与水平杆连接处",{"key":26,"text":186,"correct":34},"剪刀撑与立杆连接处",{"key":29,"text":188,"correct":21},"纵横向水平杆与立杆连接处",{"id":190,"libraryId":5,"type":54,"typeLabel":55,"stem":191,"options":192,"answer":29,"analysis":36},1120124,"脚手架定期检查的主要项目不包括（ ）。",[193,195,197,199],{"key":19,"text":194,"correct":34},"杆件的设置和连接是否符合要求",{"key":23,"text":196,"correct":34},"立杆的沉降和垂直度",{"key":26,"text":198,"correct":34},"地基是否有积水、底座是否松动",{"key":29,"text":200,"correct":21},"安装的红色警示灯",{"id":202,"libraryId":5,"type":54,"typeLabel":55,"stem":203,"options":204,"answer":26,"analysis":36},1120125,"关于施工现场照明用电的做法，正确的是（ ）。",[205,207,209,211],{"key":19,"text":206,"correct":34},"照明变压器采用自耦变压器",{"key":23,"text":208,"correct":34},"易触及带电体的场所电源采用36V电压",{"key":26,"text":210,"correct":21},"人防工程施工照明电源采用24V电压",{"key":29,"text":212,"correct":34},"金属容器内的照明电源采用24V电压",{"id":214,"libraryId":5,"type":54,"typeLabel":55,"stem":215,"options":216,"answer":19,"analysis":36},1120126,"关于模板安装施工的做法，错误的是（ ）。",[217,219,221,223],{"key":19,"text":218,"correct":21},"操作架子上长期堆放大量模板",{"key":23,"text":220,"correct":34},"高耸结构的模板作业设有避雷措施",{"key":26,"text":222,"correct":34},"遇到六级大风，停止模板安装作业",{"key":29,"text":224,"correct":34},"高压电线旁进行模板施工时，按规定采取隔离防护措施",{"id":226,"libraryId":5,"type":54,"typeLabel":55,"stem":227,"options":228,"answer":19,"analysis":36},1120128,"关于外用施工电梯与楼层间通道防护门的做法，正确的是（ ）。",[229,231,233,235],{"key":19,"text":230,"correct":21},"门为常闭型，开闭装置设在电梯一侧",{"key":23,"text":232,"correct":34},"门为常闭型，开闭装置设在楼层室内一侧",{"key":26,"text":234,"correct":34},"门为常开型，电梯运行期间上锁",{"key":29,"text":236,"correct":34},"门为常开型，电梯停运期间上锁",{"id":238,"libraryId":5,"type":9,"typeLabel":15,"stem":239,"options":240,"answer":251,"analysis":36},1120129,"关于洞口、临边防护的做法，正确的有（ ）。",[241,243,245,247,249],{"key":19,"text":242,"correct":34},"基坑周边设置了防护栏杆，但未封挂安全立网进行封闭",{"key":23,"text":244,"correct":21},"横杆长度大于2m时，加设栏杆柱",{"key":26,"text":246,"correct":21},"楼板上20cm×20cm的洞口，采用坚实的盖板盖严、钉牢",{"key":29,"text":248,"correct":34},"电梯井口未设置栅门",{"key":32,"text":250,"correct":21},"外用施工电梯出入口处，设置专用安全门","BCE",{"id":253,"libraryId":5,"type":9,"typeLabel":15,"stem":254,"options":255,"answer":266,"analysis":36},1120130,"施工现场的塔吊必须停止作业的天气状况有（ ）。",[256,258,260,262,264],{"key":19,"text":257,"correct":34},"浮尘",{"key":23,"text":259,"correct":21},"大雨",{"key":26,"text":261,"correct":34},"大雪",{"key":29,"text":263,"correct":21},"大雾",{"key":32,"text":265,"correct":34},"五级大风","BD",{"id":268,"libraryId":5,"type":9,"typeLabel":15,"stem":269,"options":270,"answer":281,"analysis":36},1120131,"根据《建筑施工安全检查标准》（JGJ59），建筑施工安全检查评定的等级有（ ）。",[271,273,275,277,279],{"key":19,"text":272,"correct":21},"优良",{"key":23,"text":274,"correct":34},"良好",{"key":26,"text":276,"correct":34},"一般",{"key":29,"text":278,"correct":21},"合格",{"key":32,"text":280,"correct":21},"不合格","ADE",{"id":283,"libraryId":5,"type":54,"typeLabel":55,"stem":284,"options":285,"answer":29,"analysis":36},1120132,"按照建筑安装工程造价的构成，其他项目费不包括（ ）。",[286,288,290,292],{"key":19,"text":287,"correct":34},"暂列金额",{"key":23,"text":289,"correct":34},"计日工",{"key":26,"text":291,"correct":34},"总包服务费",{"key":29,"text":293,"correct":21},"安全施工费",{"id":295,"libraryId":5,"type":54,"typeLabel":55,"stem":296,"options":297,"answer":26,"analysis":36},1120133,"2013年3月完成的某工程，按基准日期的价格计算工程进度款为200万元，合同支付中不能调值的部分占合同总价的20%；相关成本要素除水泥价格上涨15%外，其余均未发生变化，水泥费用在合同总价中所占的比重系数为0.3。按调值公式计算2013年3月实际工程结算款应为（ ）万元。",[298,300,302,304],{"key":19,"text":299,"correct":34},"200.00",{"key":23,"text":301,"correct":34},"207.20",{"key":26,"text":303,"correct":21},"209.00",{"key":29,"text":305,"correct":34},"230.00",{"id":307,"libraryId":5,"type":9,"typeLabel":15,"stem":308,"options":309,"answer":320,"analysis":36},1120134,"根据《建设工程施工专业分包合同（示范文本）》（GF-2017-0213），关于承包人职责的说法正确的有（ ）。",[310,312,314,316,318],{"key":19,"text":311,"correct":21},"组织分包人参加发包人组织的图纸会审",{"key":23,"text":313,"correct":34},"提供本合同专用条款中约定的设备和设施，由劳务分包人承担因此发生的费用",{"key":26,"text":315,"correct":34},"有条件地分时段为分包人提供分包工程所需的场地和通道",{"key":29,"text":317,"correct":21},"确保分包人按照批准的施工组织设计进行施工",{"key":32,"text":319,"correct":34},"分包人之间的交叉配合与承包人无关","AD",{"id":322,"libraryId":5,"type":54,"typeLabel":55,"stem":323,"options":324,"answer":26,"analysis":36},1120135,"通常情况下，向施工单位提供施工场地内地下管线资料的单位是（ ）。",[325,327,329,331],{"key":19,"text":326,"correct":34},"勘察单位",{"key":23,"text":328,"correct":34},"设计单位",{"key":26,"text":330,"correct":21},"建设单位",{"key":29,"text":332,"correct":34},"监理单位",{"id":334,"libraryId":5,"type":54,"typeLabel":55,"stem":335,"options":336,"answer":26,"analysis":36},1120136,"下列工程中，超出二级注册建造师（建筑工程）执业资格范围的是（ ）。",[337,339,341,343],{"key":19,"text":338,"correct":34},"高度90m的公共建筑工程",{"key":23,"text":340,"correct":34},"高度75m的附着脚手架安装工程",{"key":26,"text":342,"correct":21},"跨度36m的钢结构建筑物工程",{"key":29,"text":344,"correct":34},"造价900万元的装饰装修工程",{"id":346,"libraryId":5,"type":54,"typeLabel":55,"stem":347,"options":348,"answer":29,"analysis":36},1120137,"下列工作中，超出项目经理权限的是（ ）。",[349,351,353,355],{"key":19,"text":350,"correct":34},"主持项目经理部工作",{"key":23,"text":352,"correct":34},"制定项目内部计酬办法",{"key":26,"text":354,"correct":34},"决定授权范围内项目资金使用",{"key":29,"text":356,"correct":21},"审批施工组织设计",{"id":358,"libraryId":5,"type":9,"typeLabel":15,"stem":359,"options":360,"answer":176,"analysis":36},1120138,"下列时间段中，全过程均属于夜间施工时段的有（ ）。",[361,363,365,367,369],{"key":19,"text":362,"correct":34},"20:00—次日4:00",{"key":23,"text":364,"correct":34},"21:00—次日6:00",{"key":26,"text":366,"correct":21},"22:00—次日4:00",{"key":29,"text":368,"correct":21},"23:00—次日6:00",{"key":32,"text":370,"correct":34},"22:00—次日7:00",{"id":372,"libraryId":5,"type":9,"typeLabel":15,"stem":373,"options":374,"answer":51,"analysis":36},1120139,"下列分部分项工程的专项方案中，必须进行专家论证的有（ ）。",[375,377,379,381,383],{"key":19,"text":376,"correct":21},"爬模工程",{"key":23,"text":378,"correct":21},"搭设高度8m的混凝土模板支撑工程",{"key":26,"text":380,"correct":34},"搭设高度25m的落地式钢管脚手架工程",{"key":29,"text":382,"correct":21},"搭设高度25m的悬挑式钢管脚手架工程",{"key":32,"text":384,"correct":21},"施工高度50m的建筑幕墙安装工程",{"id":386,"libraryId":5,"type":9,"typeLabel":15,"stem":387,"options":388,"answer":399,"analysis":36},1120140,"针对危险性较大的建设工程，建设单位在（ ）时，应当提供危险性较大的分部分项工程清单和安全管理措施。",[389,391,393,395,397],{"key":19,"text":390,"correct":21},"申领施工许可证",{"key":23,"text":392,"correct":34},"申领安全生产许可证",{"key":26,"text":394,"correct":21},"办理安全监督手续",{"key":29,"text":396,"correct":34},"办理竣工备案手续",{"key":32,"text":398,"correct":34},"申领建设工程规划许可证","AC",{"id":401,"libraryId":5,"type":9,"typeLabel":15,"stem":402,"options":403,"answer":35,"analysis":36},1120141,"根据《危险性较大的分部分项工程安全管理办法》，不得作为专家论证会专家组成员的有（ ）。",[404,406,408,410,412],{"key":19,"text":405,"correct":21},"建设单位项目负责人",{"key":23,"text":407,"correct":21},"总监理工程师",{"key":26,"text":409,"correct":21},"项目设计技术负责人",{"key":29,"text":411,"correct":21},"项目专职安全生产管理人员",{"key":32,"text":413,"correct":34},"与项目无关的某大学相关专业教授",{"id":415,"libraryId":5,"type":9,"typeLabel":15,"stem":416,"options":417,"answer":428,"analysis":36},1120143,"下列工程的施工方案中，必须组织专家论证的有（ ）。",[418,420,422,424,426],{"key":19,"text":419,"correct":21},"开挖深度8m的基坑土方开挖工程",{"key":23,"text":421,"correct":34},"搭设高度3m的满堂支撑脚手架工程",{"key":26,"text":423,"correct":21},"采用滑模的模板工程",{"key":29,"text":425,"correct":34},"高度40m的落地式钢管脚手架工程",{"key":32,"text":427,"correct":21},"采用爆破拆除的工程","ACE",{"id":430,"libraryId":5,"type":54,"typeLabel":55,"stem":431,"options":432,"answer":23,"analysis":36},1120144,"施工项目安全生产的第一责任人是（ ）。",[433,435,437,439],{"key":19,"text":434,"correct":34},"企业安全部门经理",{"key":23,"text":436,"correct":21},"项目经理",{"key":26,"text":438,"correct":34},"项目技术负责人",{"key":29,"text":440,"correct":34},"项目安全总监",{"id":442,"libraryId":5,"type":54,"typeLabel":55,"stem":443,"options":444,"answer":26,"analysis":36},1120145,"根据《民用建筑节能条例》，在正常使用条件下，保温工程最低保修期限为（ ）年。",[445,447,449,451],{"key":19,"text":446,"correct":34},"3",{"key":23,"text":448,"correct":34},"4",{"key":26,"text":450,"correct":21},"5",{"key":29,"text":452,"correct":34},"6",{"id":454,"libraryId":5,"type":54,"typeLabel":55,"stem":455,"options":456,"answer":19,"analysis":36},1120146,"关于房屋建筑工程在正常使用条件下最低保修期限的说法，正确的是（ ）。",[457,459,461,463],{"key":19,"text":458,"correct":21},"供热系统为2个采暖期",{"key":23,"text":460,"correct":34},"装修工程为5年",{"key":26,"text":462,"correct":34},"给排水管道为5年",{"key":29,"text":464,"correct":34},"外墙面防渗漏为该工程合理使用年限",{"id":466,"libraryId":5,"type":54,"typeLabel":55,"stem":467,"options":468,"answer":26,"analysis":36},1120147,"建筑市场各方主体的不良行为记录信息，在当地建筑市场诚信信息平台上统一公布的期限一般为（ ）。",[469,471,473,475],{"key":19,"text":470,"correct":34},"3个月至1年",{"key":23,"text":472,"correct":34},"3个月至3年",{"key":26,"text":474,"correct":21},"6个月至3年",{"key":29,"text":476,"correct":34},"6个月至5年",{"id":478,"libraryId":5,"type":54,"typeLabel":55,"stem":479,"options":480,"answer":29,"analysis":36},1120148,"某型钢-混凝土组合结构工程，征得建设单位同意的下列分包情形中，属于违法分包的是（ ）。",[481,483,485,487],{"key":19,"text":482,"correct":34},"总承包单位将其承包的部分钢结构工程进行分包",{"key":23,"text":484,"correct":34},"总承包单位将其承包的部分结构工程的劳务作业进行分包",{"key":26,"text":486,"correct":34},"专业分包单位将其承包的部分工程的劳务作业进行分包",{"key":29,"text":488,"correct":21},"劳务分包单位将其承包的部分工程的劳务作业进行分包",{"id":490,"libraryId":5,"type":54,"typeLabel":55,"stem":491,"options":492,"answer":26,"analysis":36},1120149,"下列针对保修期限的合同条款中，不符合法律规定的是（ ）。",[493,495,497,499],{"key":19,"text":494,"correct":34},"装修工程为2年",{"key":23,"text":496,"correct":34},"屋面防水工程为8年",{"key":26,"text":498,"correct":21},"墙体保温工程为2年",{"key":29,"text":458,"correct":34},{"id":501,"libraryId":5,"type":54,"typeLabel":55,"stem":502,"options":503,"answer":19,"analysis":36},1120150,"向当地城建档案管理部门移交工程竣工档案的责任单位是（ ）。",[504,505,506,508],{"key":19,"text":330,"correct":21},{"key":23,"text":332,"correct":34},{"key":26,"text":507,"correct":34},"施工单位",{"key":29,"text":509,"correct":34},"分包单位",{"id":511,"libraryId":5,"type":54,"typeLabel":55,"stem":512,"options":513,"answer":19,"analysis":36},1120151,"建设单位应当自工程竣工验收合格之日起（ ）日内，向工程所在地的县级以上地方人民政府建设行政主管部门备案。",[514,516,518,520],{"key":19,"text":515,"correct":21},"15",{"key":23,"text":517,"correct":34},"30",{"key":26,"text":519,"correct":34},"45",{"key":29,"text":521,"correct":34},"60",{"id":523,"libraryId":5,"type":54,"typeLabel":55,"stem":524,"options":525,"answer":19,"analysis":36},1120152,"单位工程施工组织设计应由（ ）主持编制。",[526,528,529,531],{"key":19,"text":527,"correct":21},"项目负责人",{"key":23,"text":438,"correct":34},{"key":26,"text":530,"correct":34},"项目技术员",{"key":29,"text":532,"correct":34},"项目施工员",{"id":534,"libraryId":5,"type":9,"typeLabel":15,"stem":535,"options":536,"answer":51,"analysis":36},1120153,"关于项目管理规划的说法，正确的有（ ）。",[537,539,541,543,545],{"key":19,"text":538,"correct":21},"项目管理规划是指导项目管理工作的纲领性文件",{"key":23,"text":540,"correct":21},"项目管理规划包括项目管理规划大纲和项目管理实施规划",{"key":26,"text":542,"correct":34},"项目管理规划大纲应由项目经理组织编制",{"key":29,"text":544,"correct":21},"项目管理实施规划应由项目经理组织编制",{"key":32,"text":546,"correct":21},"项目管理实施规划应进行跟踪检查和必要的调整",{"id":548,"libraryId":5,"type":54,"typeLabel":55,"stem":549,"options":550,"answer":26,"analysis":36},1120154,"砌体施工质量控制等级分为（ ）个等级。",[551,553,555,557],{"key":19,"text":552,"correct":34},"一",{"key":23,"text":554,"correct":34},"二",{"key":26,"text":556,"correct":21},"三",{"key":29,"text":558,"correct":34},"四",{"id":560,"libraryId":5,"type":54,"typeLabel":55,"stem":561,"options":562,"answer":19,"analysis":36},1120156,"厕浴间蒸压加气混凝土砌块墙底部200mm高度范围内应做（ ）坎台。",[563,565,567,569],{"key":19,"text":564,"correct":21},"混凝土",{"key":23,"text":566,"correct":34},"普通透水砖",{"key":26,"text":568,"correct":34},"多孔砖",{"key":29,"text":570,"correct":34},"混凝土小型空心砌块",{"id":572,"libraryId":5,"type":54,"typeLabel":55,"stem":573,"options":574,"answer":26,"analysis":36},1120157,"关于普通混凝土小型空心砌块的说法，正确的是（ ）。",[575,577,579,581],{"key":19,"text":576,"correct":34},"施工时先灌水湿透",{"key":23,"text":578,"correct":34},"生产时的底面朝下正砌",{"key":26,"text":580,"correct":21},"生产时的底面朝上反砌",{"key":29,"text":582,"correct":34},"出厂龄期14天即可砌筑",{"id":584,"libraryId":5,"type":54,"typeLabel":55,"stem":585,"options":586,"answer":23,"analysis":36},1120158,"建筑工程内部装修材料按燃烧性能进行等级划分，正确的是（ ）。",[587,589,591,593],{"key":19,"text":588,"correct":34},"A级：不燃；B级：难燃；C级：可燃；D级：易燃",{"key":23,"text":590,"correct":21},"A级：不燃；B1级：难燃；B2级：可燃；B3级：易燃",{"key":26,"text":592,"correct":34},"Ⅰ级：不燃；Ⅱ级：难燃；Ⅲ级：可燃；Ⅳ级：易燃",{"key":29,"text":594,"correct":34},"甲级：不燃；乙级：难燃；丙级：可燃；丁级：易燃",{"id":596,"libraryId":5,"type":9,"typeLabel":15,"stem":597,"options":598,"answer":131,"analysis":36},1120160,"钢材的主要力学性能有（）。",[599,601,603,605,607],{"key":19,"text":600,"correct":34},"弯曲性能",{"key":23,"text":602,"correct":34},"焊接性能",{"key":26,"text":604,"correct":21},"拉伸性能",{"key":29,"text":606,"correct":21},"冲击性能",{"key":32,"text":608,"correct":21},"疲劳性能",{"id":610,"libraryId":5,"type":54,"typeLabel":55,"stem":611,"options":612,"answer":19,"analysis":36},1120161,"在工程应用中，通常用于表示钢材塑性指标的是（ ）。",[613,615,617,619],{"key":19,"text":614,"correct":21},"伸长率",{"key":23,"text":616,"correct":34},"抗拉强度",{"key":26,"text":618,"correct":34},"屈服强度",{"key":29,"text":608,"correct":34},{"id":621,"libraryId":5,"type":9,"typeLabel":15,"stem":622,"options":623,"answer":161,"analysis":36},1120163,"混凝土拌合物的和易性包括（ ）。",[624,626,628,630,632],{"key":19,"text":625,"correct":21},"保水性",{"key":23,"text":627,"correct":34},"耐久性",{"key":26,"text":629,"correct":21},"黏聚性",{"key":29,"text":631,"correct":21},"流动性",{"key":32,"text":633,"correct":34},"抗冻性",{"id":635,"libraryId":5,"type":9,"typeLabel":15,"stem":636,"options":637,"answer":648,"analysis":36},1120164,"木材干缩所导致的现象有（ ）。",[638,640,642,644,646],{"key":19,"text":639,"correct":34},"表面鼓凸",{"key":23,"text":641,"correct":21},"开裂",{"key":26,"text":643,"correct":21},"接榫松动",{"key":29,"text":645,"correct":21},"翘曲",{"key":32,"text":647,"correct":21},"拼缝不严","BCDE",{"id":650,"libraryId":5,"type":9,"typeLabel":15,"stem":651,"options":652,"answer":663,"analysis":36},1120165,"关于钢化玻璃特性的说法，正确的有（ ）。",[653,655,657,659,661],{"key":19,"text":654,"correct":34},"使用时可以切割",{"key":23,"text":656,"correct":21},"可能发生自爆",{"key":26,"text":658,"correct":34},"碎后易伤人",{"key":29,"text":660,"correct":34},"热稳定性差",{"key":32,"text":662,"correct":21},"机械强度高","BE",{"id":665,"libraryId":5,"type":9,"typeLabel":15,"stem":666,"options":667,"answer":146,"analysis":36},1120166,"关于中空玻璃特性的说法，正确的有（ ）。",[668,670,672,674,676],{"key":19,"text":669,"correct":21},"光学性能良好",{"key":23,"text":671,"correct":34},"防盗抢性好",{"key":26,"text":673,"correct":21},"降低能耗",{"key":29,"text":675,"correct":21},"防结露",{"key":32,"text":677,"correct":21},"隔声性能良好",[679,682,685,688,691,694],{"id":54,"name":680,"category":7,"favorite":681},"领导干部任职前廉政法规知识测试题",92,{"id":683,"name":684,"category":7,"favorite":54},595,"建筑结构与设备",{"id":686,"name":687,"category":7,"favorite":54},715,"招标采购专业知识与法律法规",{"id":689,"name":690,"category":7,"favorite":54},848,"市政方向-通用基础",{"id":692,"name":693,"category":7,"favorite":8},534,"BIM工程师",{"id":695,"name":693,"category":7,"favorite":8},535]