[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-790-19":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":652},{"id":5,"name":6,"category":7,"favorite":8},790,"二建建筑工程实务","建筑工程",0,19,50,2588,[13,38,53,68,83,97,112,127,142,157,171,183,195,207,219,231,243,255,270,284,299,314,328,343,355,367,379,391,403,415,427,438,450,462,474,488,500,508,520,532,544,555,564,576,588,600,609,621,632,644],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1120975,2,"多选题","验槽时应重点观察( )。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","开挖坡度是否与方案相符",false,{"key":24,"text":25,"correct":26},"B","桩基、墙角部位",true,{"key":28,"text":29,"correct":26},"C","基槽边坡稳定性",{"key":31,"text":32,"correct":26},"D","承重墙下部位",{"key":34,"text":35,"correct":26},"E","其他受力较大部位","BCDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1120976,"大体积混凝土浇筑方案根据整体性要求、结构大小、钢筋疏密及混凝土供应等情况可以选择( )等方式之一。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"全面分层",{"key":24,"text":45,"correct":22},"水平分层",{"key":28,"text":47,"correct":22},"竖向分层",{"key":31,"text":49,"correct":26},"分段分层",{"key":34,"text":51,"correct":26},"斜面分层","ADE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1120977,"符合深基坑开挖要求的表述是( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"土方开挖顺序必须与支护结构的设计工况严格一致",{"key":24,"text":60,"correct":26},"盆式挖土是先开挖基坑中间部分的土，周围四边留土坡，土坡最后挖除",{"key":28,"text":62,"correct":22},"深基坑工程的挖土方案主要有放坡挖土、中心岛式（也称墩式）挖土、盆式挖土和逆作法挖土，四种方案皆有支护结构",{"key":31,"text":64,"correct":26},"开挖时应对平面控制桩、水准点、基坑平面位置、水平标高、边坡坡度等经常进行检查",{"key":34,"text":66,"correct":26},"当基坑较深，地下水位较高，开挖水位较高，开挖土体大多位于地下水位以下时，应采取合理的人工降水措施","ABDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1120978,"土方工程的施工主要包括( )。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"土方开挖",{"key":24,"text":75,"correct":22},"土方运输",{"key":28,"text":77,"correct":26},"土方回填",{"key":31,"text":79,"correct":26},"填土的压实",{"key":34,"text":81,"correct":22},"土方计划","ACD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":67,"analysis":37},1120979,"在深基坑工程的挖土方案中，主要的挖土方案包括( )。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"放坡挖土",{"key":24,"text":90,"correct":26},"中心岛(墩)式挖土",{"key":28,"text":92,"correct":22},"斜坡挖土",{"key":31,"text":94,"correct":26},"逆作法挖土",{"key":34,"text":96,"correct":26},"盆式挖土",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1120980,"遇有下列情况之一时( )，应在基坑底普遍进行轻型动力触探。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"持力层较均匀",{"key":24,"text":104,"correct":26},"浅部有软弱下卧层",{"key":28,"text":106,"correct":26},"有浅埋的古墓",{"key":31,"text":108,"correct":26},"有浅埋的古井",{"key":34,"text":110,"correct":22},"深部有软弱下卧层","BCD",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1120981,"为了控制土方开挖质量，除应对平面控制桩、水准点进行检查外，还应经常检查( )。",[116,118,120,122,124],{"key":20,"text":117,"correct":26},"基坑平面位置",{"key":24,"text":119,"correct":26},"水平标高",{"key":28,"text":121,"correct":26},"边坡坡度",{"key":31,"text":123,"correct":22},"挖土机械",{"key":34,"text":125,"correct":22},"土的含水量","ABC",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1120982,"基坑开挖前，应根据( )、施工方法、施工工期和地面荷载等资料，制定基坑施工方案。",[131,133,135,137,139],{"key":20,"text":132,"correct":26},"支护结构形式",{"key":24,"text":134,"correct":26},"基坑深度",{"key":28,"text":136,"correct":26},"地质条件",{"key":31,"text":138,"correct":26},"周围环境",{"key":34,"text":140,"correct":22},"地基承载力","ABCD",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},1120983,"下列措施中，( )属于大体积混凝土裂缝的控制措施。",[146,148,150,152,154],{"key":20,"text":147,"correct":26},"优先选用低水化热的水泥",{"key":24,"text":149,"correct":22},"尽量增加水泥用量",{"key":28,"text":151,"correct":26},"及时为混凝土覆盖保温、保湿材料",{"key":31,"text":153,"correct":26},"设置后浇缝",{"key":34,"text":155,"correct":26},"进行二次抹面工作","ACDE",{"id":158,"libraryId":5,"type":159,"typeLabel":160,"stem":161,"options":162,"answer":24,"analysis":37},1120984,1,"单选题","土方回填土工程施工技术要求中，当回填土场地陡于( )时，应先将斜坡挖成阶梯形，然后分层填土，以利结合和防止滑动。",[163,165,167,169],{"key":20,"text":164,"correct":22},"1\u002F3",{"key":24,"text":166,"correct":26},"1\u002F5",{"key":28,"text":168,"correct":22},"1\u002F6",{"key":31,"text":170,"correct":22},"1\u002F4",{"id":172,"libraryId":5,"type":159,"typeLabel":160,"stem":173,"options":174,"answer":31,"analysis":37},1120985,"在施工单位自检合格后，对基坑验槽应由( )组织。",[175,177,179,181],{"key":20,"text":176,"correct":22},"勘察单位项目负责人",{"key":24,"text":178,"correct":22},"设计单位项目负责人",{"key":28,"text":180,"correct":22},"施工单位项目负责人",{"key":31,"text":182,"correct":26},"总监理工程师",{"id":184,"libraryId":5,"type":159,"typeLabel":160,"stem":185,"options":186,"answer":31,"analysis":37},1120986,"砖基础施工时，砖基础的转角处和交接处应同时砌筑，当不能同时砌筑时，应留置( )。",[187,189,191,193],{"key":20,"text":188,"correct":22},"直槎",{"key":24,"text":190,"correct":22},"凸槎",{"key":28,"text":192,"correct":22},"凹槎",{"key":31,"text":194,"correct":26},"斜槎",{"id":196,"libraryId":5,"type":159,"typeLabel":160,"stem":197,"options":198,"answer":28,"analysis":37},1120987,"钢筋混凝土预制桩打（沉）桩施工方法不包括( )。",[199,201,203,205],{"key":20,"text":200,"correct":22},"锤击沉桩法",{"key":24,"text":202,"correct":22},"静力压桩法",{"key":28,"text":204,"correct":26},"钻孔灌注桩法",{"key":31,"text":206,"correct":22},"振动法",{"id":208,"libraryId":5,"type":159,"typeLabel":160,"stem":209,"options":210,"answer":24,"analysis":37},1120988,"基坑工程施工前，应由( )委托具有相应资质笫三方对基坑工程实施现场检测。监测单位应编制监测方案，经建设方、设计方、监理方等认可后方可实施.",[211,213,215,217],{"key":20,"text":212,"correct":22},"设计方",{"key":24,"text":214,"correct":26},"建设方",{"key":28,"text":216,"correct":22},"监理方",{"key":31,"text":218,"correct":22},"施工方",{"id":220,"libraryId":5,"type":159,"typeLabel":160,"stem":221,"options":222,"answer":31,"analysis":37},1120989,"大体积混凝土浇筑完毕后，应在( )小时内覆盖和浇水，采用昔通硅酸盐水泥拌制的混凝土，养护时间不得少于( )天。",[223,225,227,229],{"key":20,"text":224,"correct":22},"8，14",{"key":24,"text":226,"correct":22},"12，21",{"key":28,"text":228,"correct":22},"18，21",{"key":31,"text":230,"correct":26},"12，14",{"id":232,"libraryId":5,"type":159,"typeLabel":160,"stem":233,"options":234,"answer":20,"analysis":37},1120990,"基坑开挖完毕，进行土方回填时，采用人工打夯填土施工的分层厚度应控制在( )mm。",[235,237,239,241],{"key":20,"text":236,"correct":26},"小于200",{"key":24,"text":238,"correct":22},"200~250",{"key":28,"text":240,"correct":22},"250~350",{"key":31,"text":242,"correct":22},"250~300",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":141,"analysis":37},1120991,"基坑开挖时，应对( )等经常复测检查。",[247,249,251,252,253],{"key":20,"text":248,"correct":26},"平面控制桩",{"key":24,"text":250,"correct":26},"水准点",{"key":28,"text":117,"correct":26},{"key":31,"text":119,"correct":26},{"key":34,"text":254,"correct":22},"支撑形式",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":269,"analysis":37},1120992,"地基验槽重点观察的内容有( )。",[259,261,263,265,267],{"key":20,"text":260,"correct":22},"基坑周边是否设置排水沟",{"key":24,"text":262,"correct":26},"地质情况是否与勘察报告相符",{"key":28,"text":264,"correct":26},"是否有旧建筑基础",{"key":31,"text":266,"correct":22},"基槽开挖方法是否先进合理",{"key":34,"text":268,"correct":26},"是否有浅埋坑穴、古井","BCE",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":141,"analysis":37},1120993,"某公共建筑工程基坑验槽时，( )单位有关人员必须参加验收。",[274,276,278,280,282],{"key":20,"text":275,"correct":26},"勘察",{"key":24,"text":277,"correct":26},"监理",{"key":28,"text":279,"correct":26},"施工总包",{"key":31,"text":281,"correct":26},"设计",{"key":34,"text":283,"correct":22},"支护分包",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":298,"analysis":37},1120994,"下列属于大体积混凝土裂缝控制技术的有( )。",[288,290,292,294,296],{"key":20,"text":289,"correct":22},"增大水胶比，加大水泥用量",{"key":24,"text":291,"correct":26},"控制混凝土入模温度",{"key":28,"text":293,"correct":22},"提高混凝土的入模温度",{"key":31,"text":295,"correct":26},"掺入适量微膨胀剂",{"key":34,"text":297,"correct":22},"混凝土浇筑完毕，无需覆盖","BD",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":313,"analysis":37},1120995,"关于条形混凝土浇筑的说法，正确的有( )。",[303,305,307,309,311],{"key":20,"text":304,"correct":26},"宜分段分层连续浇筑",{"key":24,"text":306,"correct":26},"一般不留施工缝",{"key":28,"text":308,"correct":22},"不宜逐段逐层呈阶梯形向前推进",{"key":31,"text":310,"correct":22},"每段浇筑长度应控制在4～5m",{"key":34,"text":312,"correct":26},"各段层间应相互衔接","ABE",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":126,"analysis":37},1120996,"钻孔灌注桩泥浆护壁成孔的工艺中，“清孔”前的工序包括( )。",[318,320,322,324,326],{"key":20,"text":319,"correct":26},"埋没护筒",{"key":24,"text":321,"correct":26},"成孔",{"key":28,"text":323,"correct":26},"预备泥浆",{"key":31,"text":325,"correct":22},"下钢筋笼",{"key":34,"text":327,"correct":22},"浇筑混凝土",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":342,"analysis":37},1120997,"下列属于验槽前的准备工作的有( )。",[332,334,336,338,340],{"key":20,"text":333,"correct":26},"察看结构说明和地质勘查报告，对比结构设计所用的地基承载力、持力层与报告所提供的是否相同。",{"key":24,"text":335,"correct":26},"询问、察看建筑位置是否与勘察范围相符",{"key":28,"text":337,"correct":22},"察看开挖方法是否与专项方案相同",{"key":31,"text":339,"correct":26},"察看场地内是否有软弱下卧层",{"key":34,"text":341,"correct":22},"要求建设方提供场地外是否有地下管线和相应地下设施","ABD",{"id":344,"libraryId":5,"type":159,"typeLabel":160,"stem":345,"options":346,"answer":24,"analysis":37},1120998,"当基坑较深，地下水位较高，开挖土体大多位于地下水位以下时，应采取合理的( )措施。",[347,349,351,353],{"key":20,"text":348,"correct":22},"放坡",{"key":24,"text":350,"correct":26},"降水",{"key":28,"text":352,"correct":22},"加固",{"key":31,"text":354,"correct":22},"分段开挖",{"id":356,"libraryId":5,"type":159,"typeLabel":160,"stem":357,"options":358,"answer":31,"analysis":37},1120999,"采用平碾压实土方时，每层虚铺厚度为( )，每层压实遍数为( )。",[359,361,363,365],{"key":20,"text":360,"correct":22},"200～250mm,3～4遍",{"key":24,"text":362,"correct":22},"200～250mm,6～8遍",{"key":28,"text":364,"correct":22},"250～300mm,3～4遍",{"key":31,"text":366,"correct":26},"250～300mm,6～8遍",{"id":368,"libraryId":5,"type":159,"typeLabel":160,"stem":369,"options":370,"answer":20,"analysis":37},1121000,"基坑验槽时应仔细检查基槽（坑）的开挖平面位置、尺寸和深度，核对是否与( )相符。",[371,373,375,377],{"key":20,"text":372,"correct":26},"设计图纸",{"key":24,"text":374,"correct":22},"勘察报告",{"key":28,"text":376,"correct":22},"施工方案",{"key":31,"text":378,"correct":22},"钎探记录",{"id":380,"libraryId":5,"type":159,"typeLabel":160,"stem":381,"options":382,"answer":24,"analysis":37},1121001,"砖基础最下面一层砖的水平灰缝大于( )时，应用细石混凝土找平。",[383,385,387,389],{"key":20,"text":384,"correct":22},"15mm",{"key":24,"text":386,"correct":26},"20mm",{"key":28,"text":388,"correct":22},"25mm",{"key":31,"text":390,"correct":22},"30mm",{"id":392,"libraryId":5,"type":159,"typeLabel":160,"stem":393,"options":394,"answer":28,"analysis":37},1121002,"大体积混凝土浇筑时，为保证结构的整体性和施工的连续性，采取分层浇筑时，应保证在下层混凝土( )将上层混凝土浇筑完毕。",[395,397,399,401],{"key":20,"text":396,"correct":22},"终凝前",{"key":24,"text":398,"correct":22},"终凝后",{"key":28,"text":400,"correct":26},"初凝前",{"key":31,"text":402,"correct":22},"初凝后",{"id":404,"libraryId":5,"type":159,"typeLabel":160,"stem":405,"options":406,"answer":24,"analysis":37},1121003,"地基基础底板大体积混凝工程中，大体积混凝土浇筑完毕后，应在12小时内覆盖和浇水。采用普通硅酸盐水泥拌制的混凝土的养护时间不得少于( )。",[407,409,411,413],{"key":20,"text":408,"correct":22},"7d",{"key":24,"text":410,"correct":26},"14d",{"key":28,"text":412,"correct":22},"21d",{"key":31,"text":414,"correct":22},"28d",{"id":416,"libraryId":5,"type":159,"typeLabel":160,"stem":417,"options":418,"answer":20,"analysis":37},1121004,"大体积混凝土振捣应采取下面哪种振捣设备( )。",[419,421,423,425],{"key":20,"text":420,"correct":26},"振捣棒",{"key":24,"text":422,"correct":22},"振动台",{"key":28,"text":424,"correct":22},"平板振动器",{"key":31,"text":426,"correct":22},"外部振动器",{"id":428,"libraryId":5,"type":159,"typeLabel":160,"stem":429,"options":430,"answer":31,"analysis":37},1121005,"泥浆护壁钻孔灌注桩施工工艺流程中，“第二次清孔”的下一道工序是( )。",[431,432,434,436],{"key":20,"text":325,"correct":22},{"key":24,"text":433,"correct":22},"下钢导管",{"key":28,"text":435,"correct":22},"质量验收",{"key":31,"text":437,"correct":26},"浇筑水下混凝土",{"id":439,"libraryId":5,"type":159,"typeLabel":160,"stem":440,"options":441,"answer":28,"analysis":37},1121006,"关于砖基础底标高不同时的做法，错误的是( )。",[442,444,446,448],{"key":20,"text":443,"correct":22},"应从低处砌起",{"key":24,"text":445,"correct":22},"由高处向低处搭砌",{"key":28,"text":447,"correct":26},"搭接长度不应小于大放脚高度",{"key":31,"text":449,"correct":22},"搭接长度不应小于砖基础底的高差",{"id":451,"libraryId":5,"type":159,"typeLabel":160,"stem":452,"options":453,"answer":24,"analysis":37},1121007,"钢筋混凝土预制桩采用静力压桩法施工时，其施工工序包括：①打桩机就位；②测量定位；③吊桩插桩；④桩身对中调直；⑤静压沉桩。一般的施工程序为：( )。",[454,456,458,460],{"key":20,"text":455,"correct":22},"①②③④⑤",{"key":24,"text":457,"correct":26},"②①③④⑤",{"key":28,"text":459,"correct":22},"①②③⑤④",{"key":31,"text":461,"correct":22},"②①③⑤④",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":473,"analysis":37},1121008,"有支护的深基坑工程的挖土方案主要有( )。",[466,468,469,471,472],{"key":20,"text":467,"correct":22},"分层分段挖土",{"key":24,"text":88,"correct":22},{"key":28,"text":470,"correct":26},"中心岛式挖土",{"key":31,"text":96,"correct":26},{"key":34,"text":94,"correct":26},"CDE",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":111,"analysis":37},1121009,"填方土料应符合设计要求，一般不能选用( )。",[478,480,482,484,486],{"key":20,"text":479,"correct":22},"砂土",{"key":24,"text":481,"correct":26},"淤泥质土",{"key":28,"text":483,"correct":26},"膨胀土",{"key":31,"text":485,"correct":26},"有机质含量大于5%的土",{"key":34,"text":487,"correct":22},"碎石土",{"id":489,"libraryId":5,"type":159,"typeLabel":160,"stem":490,"options":491,"answer":24,"analysis":37},1121010,"设备基础一般应分层浇筑，每层混凝土的厚度为300～500mm，并( )。",[492,494,496,498],{"key":20,"text":493,"correct":22},"允许上下层之间留设施工缝",{"key":24,"text":495,"correct":26},"保证上下层之间不留施工缝",{"key":28,"text":497,"correct":22},"保证下层初凝后再浇筑上层",{"key":31,"text":499,"correct":22},"保证下层终凝后再浇筑上层",{"id":501,"libraryId":5,"type":159,"typeLabel":160,"stem":502,"options":503,"answer":24,"analysis":37},1121011,"基坑验槽时应仔细观察槽壁、槽底土质类型、均匀程度和有关异常土质是否存在，核对基坑土质及地下水情况是否与( )相符。",[504,505,506,507],{"key":20,"text":372,"correct":22},{"key":24,"text":374,"correct":26},{"key":28,"text":376,"correct":22},{"key":31,"text":378,"correct":22},{"id":509,"libraryId":5,"type":159,"typeLabel":160,"stem":510,"options":511,"answer":24,"analysis":37},1121012,"当大体积混凝土平面尺寸过大时，可以适当设置( )，以减小外应力和温度应力。",[512,514,516,518],{"key":20,"text":513,"correct":22},"沉降缝",{"key":24,"text":515,"correct":26},"后浇缝",{"key":28,"text":517,"correct":22},"变形缝",{"key":31,"text":519,"correct":22},"温度缝",{"id":521,"libraryId":5,"type":159,"typeLabel":160,"stem":522,"options":523,"answer":31,"analysis":37},1121013,"大体积混凝土施工时，可掺入适量( )，使混凝土得到补偿收缩，减小混凝土的收缩变形。",[524,526,528,530],{"key":20,"text":525,"correct":22},"减水剂",{"key":24,"text":527,"correct":22},"泵送剂",{"key":28,"text":529,"correct":22},"粉煤灰",{"key":31,"text":531,"correct":26},"膨胀剂",{"id":533,"libraryId":5,"type":159,"typeLabel":160,"stem":534,"options":535,"answer":28,"analysis":37},1121014,"大体积混凝土应优先考虑水泥性质中的( )。",[536,538,540,542],{"key":20,"text":537,"correct":22},"强度",{"key":24,"text":539,"correct":22},"变形",{"key":28,"text":541,"correct":26},"水化热",{"key":31,"text":543,"correct":22},"体积安定性",{"id":545,"libraryId":5,"type":159,"typeLabel":160,"stem":546,"options":547,"answer":28,"analysis":37},1121015,"下列选项中不需要在基底进行轻型动力触探的是( )。",[548,550,551,553],{"key":20,"text":549,"correct":22},"持力层明显不均匀",{"key":24,"text":104,"correct":22},{"key":28,"text":552,"correct":26},"有浅埋的坑穴、古墓、古井等，进行直接观察就可以发现的",{"key":31,"text":554,"correct":22},"勘察报告或设计文件规定应进行轻型动力触探时",{"id":556,"libraryId":5,"type":159,"typeLabel":160,"stem":557,"options":558,"answer":28,"analysis":37},1121016,"下列深基坑工程的挖土方案中，为无支护结构的是( )。",[559,560,561,562],{"key":20,"text":94,"correct":22},{"key":24,"text":96,"correct":22},{"key":28,"text":88,"correct":26},{"key":31,"text":563,"correct":22},"中心岛式（也称墩式）挖土",{"id":565,"libraryId":5,"type":159,"typeLabel":160,"stem":566,"options":567,"answer":28,"analysis":37},1121017,"对于条形基础浇筑，以下说法不正确的是( )。",[568,570,572,574],{"key":20,"text":569,"correct":22},"混凝土宜分段分层连续浇筑，不留施工缝",{"key":24,"text":571,"correct":22},"混凝土分段浇筑时，每段浇筑长度控制在2000～3000mm",{"key":28,"text":573,"correct":26},"采用原槽土模时，应在基槽两侧的土壁上交错打入长100mm左右的标杆，并露出10—20mm",{"key":31,"text":575,"correct":22},"逐段逐层呈阶梯形向前推进",{"id":577,"libraryId":5,"type":159,"typeLabel":160,"stem":578,"options":579,"answer":20,"analysis":37},1121018,"验槽时，对于基底以下的土层不可见部位，要辅以( )法配合共同完成。",[580,582,584,586],{"key":20,"text":581,"correct":26},"钎探",{"key":24,"text":583,"correct":22},"重锤",{"key":28,"text":585,"correct":22},"铁锹",{"key":31,"text":587,"correct":22},"钻土",{"id":589,"libraryId":5,"type":159,"typeLabel":160,"stem":590,"options":591,"answer":28,"analysis":37},1121019,"对有抗渗要求的混凝土，采用普通硅酸盐水泥拌制的混凝土养护时间不得少于( )d。",[592,594,596,598],{"key":20,"text":593,"correct":22},"10",{"key":24,"text":595,"correct":22},"12",{"key":28,"text":597,"correct":26},"14",{"key":31,"text":599,"correct":22},"15",{"id":601,"libraryId":5,"type":159,"typeLabel":160,"stem":602,"options":603,"answer":20,"analysis":37},1121020,"当地质条件和场地条件许可时，开挖深度不大的基坑最可取的开挖方案是( )。",[604,605,607,608],{"key":20,"text":88,"correct":26},{"key":24,"text":606,"correct":22},"中心岛式(墩式)挖土",{"key":28,"text":96,"correct":22},{"key":31,"text":94,"correct":22},{"id":610,"libraryId":5,"type":159,"typeLabel":160,"stem":611,"options":612,"answer":28,"analysis":37},1121021,"混凝土基础施工时，设备基础浇筑时，一般应分层浇筑，并保证上下层之间不留施工缝，每层混凝土的厚度为( )mm。",[613,615,617,619],{"key":20,"text":614,"correct":22},"100～300",{"key":24,"text":616,"correct":22},"300～400",{"key":28,"text":618,"correct":26},"300～500",{"key":31,"text":620,"correct":22},"400～500",{"id":622,"libraryId":5,"type":159,"typeLabel":160,"stem":623,"options":624,"answer":28,"analysis":37},1121022,"砖基础的水平灰缝厚度和垂直灰缝宽度宜为( )mm。",[625,627,629,630],{"key":20,"text":626,"correct":22},"8",{"key":24,"text":628,"correct":22},"9",{"key":28,"text":593,"correct":26},{"key":31,"text":631,"correct":22},"11",{"id":633,"libraryId":5,"type":159,"typeLabel":160,"stem":634,"options":635,"answer":31,"analysis":37},1121023,"下列关于石基础施工技术要求的说法中，错误的是( )。",[636,638,640,642],{"key":20,"text":637,"correct":22},"毛石基础截面形状有矩形、阶梯形、梯形等",{"key":24,"text":639,"correct":22},"根据石材加工后的外形规则程度，石基础分为毛石基础和料石基础",{"key":28,"text":641,"correct":22},"砌筑时应双挂线，分层砌筑，每层高度为30～40 cm，大体砌平",{"key":31,"text":643,"correct":26},"墙基需留槎时，不得留在外墙转角或纵墙与横墙的交接处，至少应离开2.0 m的距离",{"id":645,"libraryId":5,"type":159,"typeLabel":160,"stem":646,"options":647,"answer":24,"analysis":37},1121024,"普通硅酸盐水泥拌制的大体积混凝土的养护时间不得少于( )。",[648,649,650,651],{"key":20,"text":408,"correct":22},{"key":24,"text":410,"correct":26},{"key":28,"text":412,"correct":22},{"key":31,"text":414,"correct":22},[653,656,659,662,665,668],{"id":159,"name":654,"category":7,"favorite":655},"领导干部任职前廉政法规知识测试题",92,{"id":657,"name":658,"category":7,"favorite":159},595,"建筑结构与设备",{"id":660,"name":661,"category":7,"favorite":159},715,"招标采购专业知识与法律法规",{"id":663,"name":664,"category":7,"favorite":159},848,"市政方向-通用基础",{"id":666,"name":667,"category":7,"favorite":8},534,"BIM工程师",{"id":669,"name":667,"category":7,"favorite":8},535]