[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-790-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":646},{"id":5,"name":6,"category":7,"favorite":8},790,"二建建筑工程实务","建筑工程",0,1,50,2588,[13,33,51,66,81,94,109,121,133,145,160,172,184,199,214,226,238,250,262,274,286,297,309,321,333,341,353,365,377,389,403,416,424,436,448,460,474,486,498,510,522,534,545,557,572,584,596,608,622,634],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":23,"analysis":32},1120025,"单选题","地基验槽通常采用观察法。对于基底以下的土层不可见部位，通常采用（ ）法",[18,22,26,29],{"key":19,"text":20,"correct":21},"A","局部开挖",false,{"key":23,"text":24,"correct":25},"B","钎探",true,{"key":27,"text":28,"correct":21},"C","钻孔",{"key":30,"text":31,"correct":21},"D","超声波检测","",{"id":34,"libraryId":5,"type":35,"typeLabel":36,"stem":37,"options":38,"answer":50,"analysis":32},1120029,2,"多选题","可以组织基坑验槽的人员有（ ）",[39,41,43,45,47],{"key":19,"text":40,"correct":21},"设计单位负责人",{"key":23,"text":42,"correct":25},"总监理工程师",{"key":27,"text":44,"correct":21},"施工单位负责人",{"key":30,"text":46,"correct":25},"建设单位项目负责人",{"key":48,"text":49,"correct":21},"E","勘察单位负责人","BD",{"id":52,"libraryId":5,"type":35,"typeLabel":36,"stem":53,"options":54,"answer":65,"analysis":32},1120032,"验槽时，需进行轻型动力触探的情况有（ ）",[55,57,59,61,63],{"key":19,"text":56,"correct":25},"持力层明显不均匀",{"key":23,"text":58,"correct":25},"局部有软弱下卧层",{"key":27,"text":60,"correct":21},"基槽底面有积水",{"key":30,"text":62,"correct":21},"基槽底面存在高抵差",{"key":48,"text":64,"correct":25},"有直接观察难以发现的浅埋坑穴、古墓、古井等","ABE",{"id":67,"libraryId":5,"type":35,"typeLabel":36,"stem":68,"options":69,"answer":80,"analysis":32},1120034,"下列关于招投标说法错误的有（ ）",[70,72,74,76,78],{"key":19,"text":71,"correct":21},"招投标活动应当遵循公平、公正、公开、诚实信用的原则进行",{"key":23,"text":73,"correct":25},"招标人不得邀请招标特定投标人",{"key":27,"text":75,"correct":21},"公开招标的项目应该发布招标公告",{"key":30,"text":77,"correct":21},"招标文件应该载明投标有效期",{"key":48,"text":79,"correct":25},"招标人分别组织投标人踏勘现场","BE",{"id":82,"libraryId":5,"type":35,"typeLabel":36,"stem":83,"options":84,"answer":80,"analysis":32},1120036,"关于建设工程招标投标的说法，错误的有（ ）。",[85,87,89,90,92],{"key":19,"text":86,"correct":21},"应遵循公开、公平、公正和诚实信用的原则",{"key":23,"text":88,"correct":25},"招标人不得邀请特定的投标人",{"key":27,"text":75,"correct":21},{"key":30,"text":91,"correct":21},"招标文件中应载明投标有效期",{"key":48,"text":93,"correct":25},"分批组织部分投标人踏勘现场",{"id":95,"libraryId":5,"type":35,"typeLabel":36,"stem":96,"options":97,"answer":108,"analysis":32},1120038,"关于混凝土条形基础施工的说法，正确的有（ ）",[98,100,102,104,106],{"key":19,"text":99,"correct":25},"宜分段分层连续浇筑",{"key":23,"text":101,"correct":25},"一般不留施工缝",{"key":27,"text":103,"correct":25},"各段层间应相互衔接",{"key":30,"text":105,"correct":21},"每段浇筑长度应控制在4～5m",{"key":48,"text":107,"correct":21},"不宜逐段逐层呈阶梯型向前推进","ABC",{"id":110,"libraryId":5,"type":9,"typeLabel":15,"stem":111,"options":112,"answer":27,"analysis":32},1120040,"某工程在施工过程中因不可抗力造成如下损失：永久工程损坏修复费用 16万元，承包人受伤人员医药费 4 万元，施工机具损失 6 万元，应发包人要求赶工发生费用 2 万元，停工期间应发包人要求承包人清理现场费用 4 万元。承包人及时向项目监理机构提出索赔申请，并附有相关证明材料。根据《建设工程施工合同（示范文本）》，项目监理机构应批准的索赔金额为（ ）万元。",[113,115,117,119],{"key":19,"text":114,"correct":21},"20",{"key":23,"text":116,"correct":21},"24",{"key":27,"text":118,"correct":25},"22",{"key":30,"text":120,"correct":21},"32",{"id":122,"libraryId":5,"type":9,"typeLabel":15,"stem":123,"options":124,"answer":27,"analysis":32},1120042,"不属于专业承包资质类别的是（ ）",[125,127,129,131],{"key":19,"text":126,"correct":21},"建筑幕墙",{"key":23,"text":128,"correct":21},"电梯安装",{"key":27,"text":130,"correct":25},"混凝土作业",{"key":30,"text":132,"correct":21},"钢结构",{"id":134,"libraryId":5,"type":9,"typeLabel":15,"stem":135,"options":136,"answer":23,"analysis":32},1120044,"下列施工合同文件的排序符合优先解释顺序的是（ ）。",[137,139,141,143],{"key":19,"text":138,"correct":21},"施工合同协议书、施工合同专用条款、中标通知书、投标书及其附件",{"key":23,"text":140,"correct":25},"施工合同协议书、中标通知书、投标书及其附件、施工合同专用条款",{"key":27,"text":142,"correct":21},"施工合同专用条款、施工合同协议书、中标通知书、投标书及其附件",{"key":30,"text":144,"correct":21},"施工合同专用条款、中标通知书、投标书及其附件、施工合同协议书",{"id":146,"libraryId":5,"type":35,"typeLabel":36,"stem":147,"options":148,"answer":159,"analysis":32},1120046,"依据《标准施工招标文件》，承包人可同时索赔工期和费用的情形有（ ）。",[149,151,153,155,157],{"key":19,"text":150,"correct":25},"承包人遇到不利物质条件",{"key":23,"text":152,"correct":25},"施工过程中发现文物",{"key":27,"text":154,"correct":21},"法律变化引起价格调整",{"key":30,"text":156,"correct":21},"发包人要求向承包人提前交付工程设备",{"key":48,"text":158,"correct":21},"承包人遇到异常恶劣的气候条件","AB",{"id":161,"libraryId":5,"type":9,"typeLabel":15,"stem":162,"options":163,"answer":19,"analysis":32},1120048,"下列动火作业中，属于三级动火的是（ ）。",[164,166,168,170],{"key":19,"text":165,"correct":25},"焊接工地围挡",{"key":23,"text":167,"correct":21},"地下室内焊接管道",{"key":27,"text":169,"correct":21},"作业层钢筋焊接",{"key":30,"text":171,"correct":21},"木工棚附近切割作业",{"id":173,"libraryId":5,"type":9,"typeLabel":15,"stem":174,"options":175,"answer":19,"analysis":32},1120050,"关于建筑施工现场安全文明施工的说法，正确的是（）。",[176,178,180,182],{"key":19,"text":177,"correct":25},"场地四周围挡应连续设置",{"key":23,"text":179,"correct":21},"现场组出入口可以不设置保安值班室",{"key":27,"text":181,"correct":21},"高层建筑消防水源可与生产水源共用管线",{"key":30,"text":183,"correct":21},"在建工程审批后可以住人",{"id":185,"libraryId":5,"type":35,"typeLabel":36,"stem":186,"options":187,"answer":198,"analysis":32},1120052,"关于施工现场宿舍管理的说法，正确的有（ ）。",[188,190,192,194,196],{"key":19,"text":189,"correct":25},"必须设置可开启式窗户",{"key":23,"text":191,"correct":21},"床铺不得超过3层",{"key":27,"text":193,"correct":25},"严禁使用通铺",{"key":30,"text":195,"correct":25},"每间居住人员不得超过16人",{"key":48,"text":197,"correct":25},"宿舍内通道宽度不得小于0.9m","ACDE",{"id":200,"libraryId":5,"type":35,"typeLabel":36,"stem":201,"options":202,"answer":213,"analysis":32},1120054,"关于施工现场电工作业的说法，正确的有（ ）",[203,205,207,209,211],{"key":19,"text":204,"correct":25},"持证上岗",{"key":23,"text":206,"correct":25},"用绝缘工具",{"key":27,"text":208,"correct":25},"穿绝缘胶鞋",{"key":30,"text":210,"correct":25},"戴绝缘手套",{"key":48,"text":212,"correct":21},"带负荷插拔插头","ABCD",{"id":215,"libraryId":5,"type":9,"typeLabel":15,"stem":216,"options":217,"answer":30,"analysis":32},1120056,"下列施工作业中，动火等级最低的是（ ）。",[218,220,222,224],{"key":19,"text":219,"correct":21},"钢构焊接",{"key":23,"text":221,"correct":21},"登高焊接",{"key":27,"text":223,"correct":21},"设备管道焊接",{"key":30,"text":225,"correct":25},"办公区大门焊接",{"id":227,"libraryId":5,"type":9,"typeLabel":15,"stem":228,"options":229,"answer":27,"analysis":32},1120058,"下列施工场所中，施工照明电源电压不得大于12V的是（）。",[230,232,234,236],{"key":19,"text":231,"correct":21},"隧道",{"key":23,"text":233,"correct":21},"人防工程",{"key":27,"text":235,"correct":25},"锅炉内",{"key":30,"text":237,"correct":21},"高温场所",{"id":239,"libraryId":5,"type":9,"typeLabel":15,"stem":240,"options":241,"answer":30,"analysis":32},1120060,"一般情况下，夜间施工的时段是（ ）。",[242,244,246,248],{"key":19,"text":243,"correct":21},"当日18时至午夜24时",{"key":23,"text":245,"correct":21},"当日18时至次日8时",{"key":27,"text":247,"correct":21},"当日20时至次日6时",{"key":30,"text":249,"correct":25},"当日22时至次日6时",{"id":251,"libraryId":5,"type":9,"typeLabel":15,"stem":252,"options":253,"answer":19,"analysis":32},1120062,"一级动火作业的防火安全技术方案应由（）组织编制。",[254,256,258,260],{"key":19,"text":255,"correct":25},"项目负责人",{"key":23,"text":257,"correct":21},"项目技术负责人",{"key":27,"text":259,"correct":21},"项目安全负责人",{"key":30,"text":261,"correct":21},"企业技术负责人",{"id":263,"libraryId":5,"type":9,"typeLabel":15,"stem":264,"options":265,"answer":27,"analysis":32},1120064,"无需办理动火证的作业是（ ）。",[266,268,270,272],{"key":19,"text":267,"correct":21},"登高焊、割作业",{"key":23,"text":269,"correct":21},"密闭容器内动火作业",{"key":27,"text":271,"correct":25},"现场食堂用火作业",{"key":30,"text":273,"correct":21},"比较密封的地下室动火作业",{"id":275,"libraryId":5,"type":9,"typeLabel":15,"stem":276,"options":277,"answer":30,"analysis":32},1120066,"市区施工现场主要路段围挡高度不得低于（）。",[278,280,282,284],{"key":19,"text":279,"correct":21},"1.5m",{"key":23,"text":281,"correct":21},"1.8m",{"key":27,"text":283,"correct":21},"2.0m",{"key":30,"text":285,"correct":25},"2.5m",{"id":287,"libraryId":5,"type":9,"typeLabel":15,"stem":288,"options":289,"answer":23,"analysis":32},1120068,"施工现场进行一级动火作业前，应由（ ）审核批准。",[290,292,294,295],{"key":19,"text":291,"correct":21},"安全监理工程师",{"key":23,"text":293,"correct":25},"企业安全管理部门",{"key":27,"text":255,"correct":21},{"key":30,"text":296,"correct":21},"项目安全管理部门",{"id":298,"libraryId":5,"type":9,"typeLabel":15,"stem":299,"options":300,"answer":27,"analysis":32},1120070,"关于某建筑工程（高度 28 m）施工现场临时用水的说法，正确的是（ ）。",[301,303,305,307],{"key":19,"text":302,"correct":21},"现场临时用水仅包括生产用水、机械用水和消防用水三部分",{"key":23,"text":304,"correct":21},"自行设计的消防用水系统，其消防干管直径应不小于 75mm",{"key":27,"text":306,"correct":25},"临时消防竖管管径不得小于 75mm",{"key":30,"text":308,"correct":21},"临时消防竖管可兼做施工用水管线",{"id":310,"libraryId":5,"type":9,"typeLabel":15,"stem":311,"options":312,"answer":19,"analysis":32},1120072,"关于施工现场临时用水管理的说法，正确的是（）。",[313,315,317,319],{"key":19,"text":314,"correct":25},"高度超过24米的建筑工程严禁把消防管兼作施工用水管线",{"key":23,"text":316,"correct":21},"施工降水不可用于临时用水",{"key":27,"text":318,"correct":21},"自行设计消防用水时消防干管直径最小应为150mm",{"key":30,"text":320,"correct":21},"消防供水中的消防泵可不使用专用配电线路",{"id":322,"libraryId":5,"type":9,"typeLabel":15,"stem":323,"options":324,"answer":23,"analysis":32},1120074,"在现场施工中，属于一级动火作业的是（）。",[325,327,329,331],{"key":19,"text":326,"correct":21},"小型油箱",{"key":23,"text":328,"correct":25},"比较密封的地下室",{"key":27,"text":330,"correct":21},"登高电焊",{"key":30,"text":332,"correct":21},"无明显危险因素的露天场所",{"id":334,"libraryId":5,"type":9,"typeLabel":15,"stem":335,"options":336,"answer":30,"analysis":32},1120076,"针对市区主要路段的施工现场，其围挡高度至少应为（ ）。",[337,338,339,340],{"key":19,"text":279,"correct":21},{"key":23,"text":281,"correct":21},{"key":27,"text":283,"correct":21},{"key":30,"text":285,"correct":25},{"id":342,"libraryId":5,"type":9,"typeLabel":15,"stem":343,"options":344,"answer":30,"analysis":32},1120078,"关于施工现场文明施工的说法，错误的是（ ）。",[345,347,349,351],{"key":19,"text":346,"correct":21},"现场宿舍必须设置可开启式窗户",{"key":23,"text":348,"correct":21},"现场食堂必须办理卫生许可证",{"key":27,"text":350,"correct":21},"施工现场必须实施封闭管理",{"key":30,"text":352,"correct":25},"施工现场办公区与生活区必须分开设置",{"id":354,"libraryId":5,"type":9,"typeLabel":15,"stem":355,"options":356,"answer":23,"analysis":32},1120080,"施工现场污水排放前，应与所在地县级以上人民政府（ ）部门签署排放许可协议，申领许可证。",[357,359,361,363],{"key":19,"text":358,"correct":21},"城管",{"key":23,"text":360,"correct":25},"市政管理",{"key":27,"text":362,"correct":21},"环卫",{"key":30,"text":364,"correct":21},"卫生管理",{"id":366,"libraryId":5,"type":9,"typeLabel":15,"stem":367,"options":368,"answer":30,"analysis":32},1120082,"关于施工现场泥浆处置的说法，正确的是（ ）。",[369,371,373,375],{"key":19,"text":370,"correct":21},"可直接排入市政污水管网",{"key":23,"text":372,"correct":21},"可直接排入市政雨水管网",{"key":27,"text":374,"correct":21},"可直接排入工地附近的城市景观河",{"key":30,"text":376,"correct":25},"可直接外运至指定地点",{"id":378,"libraryId":5,"type":9,"typeLabel":15,"stem":379,"options":380,"answer":19,"analysis":32},1120084,"关于施工现场临时用电的做法，正确的是（ ）。",[381,383,385,387],{"key":19,"text":382,"correct":25},"总配电箱设置在靠近外电源处",{"key":23,"text":384,"correct":21},"开关箱中作为末级保护的漏电保护器，其额定漏电动作时间为0.2s",{"key":27,"text":386,"correct":21},"室外220V灯具距地面高度为2.8m",{"key":30,"text":388,"correct":21},"现场施工电梯未设置避雷装置",{"id":390,"libraryId":5,"type":35,"typeLabel":36,"stem":391,"options":392,"answer":402,"analysis":32},1120086,"可以使用36V照明用电的施工现场有（ ）。",[393,395,397,398,400],{"key":19,"text":394,"correct":21},"特别潮湿场所",{"key":23,"text":396,"correct":25},"灯具离地面高度2.2m场所",{"key":27,"text":237,"correct":25},{"key":30,"text":399,"correct":25},"有导电灰尘场所",{"key":48,"text":401,"correct":21},"锅炉或金属容器内","BCD",{"id":404,"libraryId":5,"type":35,"typeLabel":36,"stem":405,"options":406,"answer":415,"analysis":32},1120088,"在施工现场的下列场所中，可以使用36V电压照明的有（ ）。",[407,408,410,411,413],{"key":19,"text":233,"correct":25},{"key":23,"text":409,"correct":21},"特别潮湿环境",{"key":27,"text":235,"correct":21},{"key":30,"text":412,"correct":25},"有导电灰尘环境",{"key":48,"text":414,"correct":25},"照明灯具离地高度2.0m的房间","ADE",{"id":417,"libraryId":5,"type":9,"typeLabel":15,"stem":418,"options":419,"answer":27,"analysis":32},1120090,"下列施工场所中，施工照明电源电压不得大于12V的是（ ）。",[420,421,422,423],{"key":19,"text":231,"correct":21},{"key":23,"text":233,"correct":21},{"key":27,"text":235,"correct":25},{"key":30,"text":237,"correct":21},{"id":425,"libraryId":5,"type":9,"typeLabel":15,"stem":426,"options":427,"answer":27,"analysis":32},1120092,"下列标志类型中，不属于施工现场安全标志的是（ ）",[428,430,432,434],{"key":19,"text":429,"correct":21},"禁止标志",{"key":23,"text":431,"correct":21},"警告标志",{"key":27,"text":433,"correct":25},"宣传标志",{"key":30,"text":435,"correct":21},"提示标志",{"id":437,"libraryId":5,"type":9,"typeLabel":15,"stem":438,"options":439,"answer":19,"analysis":32},1120094,"关于施工现场动火审批程序的描述正确的是（）。",[440,442,444,446],{"key":19,"text":441,"correct":25},"三级动火作业申请表由班组填写，经过项目负责人和项目安全管理部门审批",{"key":23,"text":443,"correct":21},"二级动火作业申请表由项目负责人组织拟订填写",{"key":27,"text":445,"correct":21},"一级动火作业申请表由项目责任工程师组织拟订填写",{"key":30,"text":447,"correct":21},"钢结构的安装焊接属于一级动火",{"id":449,"libraryId":5,"type":35,"typeLabel":36,"stem":450,"options":451,"answer":415,"analysis":32},1120095,"可以使用 36V 电压照明器的场所有（）。",[452,454,455,457,459],{"key":19,"text":453,"correct":25},"灯具离地面高度为 2.0m 的地下室",{"key":23,"text":235,"correct":21},{"key":27,"text":456,"correct":21},"易触及带电体的场所",{"key":30,"text":458,"correct":25},"有导电灰尘",{"key":48,"text":231,"correct":25},{"id":461,"libraryId":5,"type":35,"typeLabel":36,"stem":462,"options":463,"answer":50,"analysis":32},1120096,"建筑工程质量验收划分时，分部工程的划分依据有（ ）。",[464,466,468,470,472],{"key":19,"text":465,"correct":21},"工程量",{"key":23,"text":467,"correct":25},"专业性质",{"key":27,"text":469,"correct":21},"变形缝",{"key":30,"text":471,"correct":25},"工程部位",{"key":48,"text":473,"correct":21},"楼层",{"id":475,"libraryId":5,"type":9,"typeLabel":15,"stem":476,"options":477,"answer":27,"analysis":32},1120097,"关于建筑工程施工质量验收单元划分的说法，错误的是（ ）。",[478,480,482,484],{"key":19,"text":479,"correct":21},"单位工程可以是一个构筑物",{"key":23,"text":481,"correct":21},"分部工程可划分为若干个子分部工程",{"key":27,"text":483,"correct":25},"分项工程可划分为若干个子分项工程",{"key":30,"text":485,"correct":21},"检验批可按变形缝划分",{"id":487,"libraryId":5,"type":9,"typeLabel":15,"stem":488,"options":489,"answer":30,"analysis":32},1120098,"某大楼主体结构分部工程质量验收合格，则下列说法错误的是（ ）。",[490,492,494,496],{"key":19,"text":491,"correct":21},"该分部工程所含分项工程质量必定合格",{"key":23,"text":493,"correct":21},"该分部工程质量控制资料必定完整",{"key":27,"text":495,"correct":21},"该分部工程观感质量验收必定符合要求",{"key":30,"text":497,"correct":25},"该单位工程质量验收必定合格",{"id":499,"libraryId":5,"type":9,"typeLabel":15,"stem":500,"options":501,"answer":19,"analysis":32},1120099,"建筑工程施工项目质量控制内容包括：①工序质量、②检验批质量、③分项工程质量、④分部工程质量、⑤单位工程质量，下列控制顺序中，正确的是（ ）。",[502,504,506,508],{"key":19,"text":503,"correct":25},"①→②→③→④→⑤",{"key":23,"text":505,"correct":21},"②→①→③→⑤→④",{"key":27,"text":507,"correct":21},"②→①→④→③→⑤",{"key":30,"text":509,"correct":21},"⑤→④→③→②→①",{"id":511,"libraryId":5,"type":9,"typeLabel":15,"stem":512,"options":513,"answer":19,"analysis":32},1120100,"根据《建筑工程施工质量验收统一标准》（GB50300），单位工程竣工验收应由（ ）组织。",[514,516,518,520],{"key":19,"text":515,"correct":25},"建设单位（项目）负责人",{"key":23,"text":517,"correct":21},"监理单位（项目）负责人",{"key":27,"text":519,"correct":21},"施工单位（项目）负责人",{"key":30,"text":521,"correct":21},"质量监督机构",{"id":523,"libraryId":5,"type":9,"typeLabel":15,"stem":524,"options":525,"answer":30,"analysis":32},1120101,"根据《建筑工程施工质量验收统一标准》（GB50300），建筑工程质量验收的最小单元是（ ）。",[526,528,530,532],{"key":19,"text":527,"correct":21},"单位工程",{"key":23,"text":529,"correct":21},"分部工程",{"key":27,"text":531,"correct":21},"分项工程",{"key":30,"text":533,"correct":25},"检验批",{"id":535,"libraryId":5,"type":9,"typeLabel":15,"stem":536,"options":537,"answer":30,"analysis":32},1120102,"基坑验槽应由（ ）组织。",[538,540,542,544],{"key":19,"text":539,"correct":21},"勘察单位项目负责人",{"key":23,"text":541,"correct":21},"设计单位项目负责人",{"key":27,"text":543,"correct":21},"施工单位项目负责人",{"key":30,"text":42,"correct":25},{"id":546,"libraryId":5,"type":35,"typeLabel":36,"stem":547,"options":548,"answer":50,"analysis":32},1120103,"分部工程验收可以由（ ）组织。",[549,551,552,554,555],{"key":19,"text":550,"correct":21},"施工单位项目经理",{"key":23,"text":42,"correct":25},{"key":27,"text":553,"correct":21},"专业监理工程师",{"key":30,"text":46,"correct":25},{"key":48,"text":556,"correct":21},"建设单位项目专业技术负责人",{"id":558,"libraryId":5,"type":35,"typeLabel":36,"stem":559,"options":560,"answer":571,"analysis":32},1120105,"必须参加单位工程竣工验收的单位有（ ）。",[561,563,565,567,569],{"key":19,"text":562,"correct":25},"建设单位",{"key":23,"text":564,"correct":25},"施工单位",{"key":27,"text":566,"correct":21},"勘察单位",{"key":30,"text":568,"correct":25},"监理单位",{"key":48,"text":570,"correct":25},"设计单位","ABDE",{"id":573,"libraryId":5,"type":35,"typeLabel":36,"stem":574,"options":575,"answer":583,"analysis":32},1120106,"基坑开挖完毕后，必须参加现场验槽并签署意见的单位有（ ）。",[576,578,580,581,582],{"key":19,"text":577,"correct":21},"质监站",{"key":23,"text":579,"correct":25},"监理（建设）单位",{"key":27,"text":570,"correct":25},{"key":30,"text":566,"correct":25},{"key":48,"text":564,"correct":25},"BCDE",{"id":585,"libraryId":5,"type":9,"typeLabel":15,"stem":586,"options":587,"answer":23,"analysis":32},1120107,"下列污染物中，不属于民用建筑工程室内环境污染物浓度检测时必需检测的项目是（ ）。",[588,590,592,594],{"key":19,"text":589,"correct":21},"氡",{"key":23,"text":591,"correct":25},"氯",{"key":27,"text":593,"correct":21},"氨",{"key":30,"text":595,"correct":21},"甲醛",{"id":597,"libraryId":5,"type":9,"typeLabel":15,"stem":598,"options":599,"answer":19,"analysis":32},1120108,"对采用自然通风的民用建筑工程，进行室内环境污染物浓度检测时，应在外门窗关闭至少（ ）后进行。",[600,602,604,606],{"key":19,"text":601,"correct":25},"1h",{"key":23,"text":603,"correct":21},"5h",{"key":27,"text":605,"correct":21},"12h",{"key":30,"text":607,"correct":21},"24h",{"id":609,"libraryId":5,"type":35,"typeLabel":36,"stem":610,"options":611,"answer":50,"analysis":32},1120109,"根据室内环境污染控制的不同要求，下列民用建筑中，属于Ⅰ类建筑的有（ ）。",[612,614,616,618,620],{"key":19,"text":613,"correct":21},"图书馆",{"key":23,"text":615,"correct":25},"医院",{"key":27,"text":617,"correct":21},"体育馆",{"key":30,"text":619,"correct":25},"住宅",{"key":48,"text":621,"correct":21},"展览馆",{"id":623,"libraryId":5,"type":9,"typeLabel":15,"stem":624,"options":625,"answer":19,"analysis":32},1120110,"关于建筑节能工程施工质量验收的说法，正确的是（ ）。",[626,628,630,632],{"key":19,"text":627,"correct":25},"建筑节能工程是单位工程的一个分部工程",{"key":23,"text":629,"correct":21},"建筑节能工程是单位工程的一个分项工程",{"key":27,"text":631,"correct":21},"一般工程可不进行围护结构节能构造实体检验",{"key":30,"text":633,"correct":21},"节能验收资料不需单独组卷",{"id":635,"libraryId":5,"type":35,"typeLabel":36,"stem":636,"options":637,"answer":645,"analysis":32},1120111,"经审批的施工组织设计应报送和发放的单位有（ ）。",[638,639,640,641,643],{"key":19,"text":568,"correct":25},{"key":23,"text":566,"correct":21},{"key":27,"text":570,"correct":21},{"key":30,"text":642,"correct":25},"施工企业技术部门",{"key":48,"text":644,"correct":21},"劳务分包单位","AD",[647,650,653,656,659,662],{"id":9,"name":648,"category":7,"favorite":649},"领导干部任职前廉政法规知识测试题",92,{"id":651,"name":652,"category":7,"favorite":9},595,"建筑结构与设备",{"id":654,"name":655,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":657,"name":658,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":660,"name":661,"category":7,"favorite":8},534,"BIM工程师",{"id":663,"name":661,"category":7,"favorite":8},535]