[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1121476":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1121476,790,1,"单选题","施工期间最高气温超过30℃时，现场拌制砂浆使用完毕时间是( )h内。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","2",true,{"key":16,"text":17,"correct":18},"B","2.5",false,{"key":20,"text":21,"correct":18},"C","3",{"key":23,"text":24,"correct":18},"D","4","2021\u002F2020版教材P129页 “(1)现场拌制的砂浆应随拌随用，当施工期间最高气温超过30℃时，应在2h内使用完毕。预拌砂浆及蒸压加气混凝土砌块专用砂浆的使用时间应按照厂方提供的说明书确定。”",{"id":6,"name":27,"category":28,"favorite":29},"二建建筑工程实务","建筑工程",0]