[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1121437":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1121437,790,2,"多选题","有防水要求的建筑地面工程，铺设前必须对（ ）进行密封处理。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","立管",true,{"key":16,"text":17,"correct":14},"B","套管",{"key":19,"text":20,"correct":14},"C","地漏",{"key":22,"text":23,"correct":24},"D","砖缝",false,{"key":26,"text":27,"correct":14},"E","楼板节点之间","ABCE","2021\u002F2020版教材P108 有防水要求的建筑地面工程，铺设前必须对立管、套管和地漏与楼板节点之间进行密封处理；并进行隐蔽验收；排水坡度应符合设计要求“。",{"id":6,"name":31,"category":32,"favorite":33},"二建建筑工程实务","建筑工程",0]