[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1121291":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1121291,790,2,"多选题","关于地下防水层防水混凝土施工技术要求的说法，正确的有（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","防水混凝土拌合物应采用机械搅拌，搅拌时间不小于2min",true,{"key":16,"text":17,"correct":14},"B","防水混凝土拌合物在运输后如出现离析，必须进行二次搅拌",{"key":19,"text":20,"correct":14},"C","防水混凝土应连续浇筑，宜少留施工缝",{"key":22,"text":23,"correct":14},"D","防水混凝土终凝后应立即进行养护",{"key":25,"text":26,"correct":27},"E","防水混凝土结构内部的各种钢筋和绑扎钢丝，可接触模板",false,"ABCD","2021\u002F2020版教材P88 该题主要考察的是：地下防水层防水混凝土施工技术要求，A选项，防水混凝土拌合物应采用机械搅拌，搅拌时间不宜小于2min。B选项，防水混凝土拌合物在运输后如出现离析，必须进行二次搅拌。C选项见，防水混凝土应连续浇筑，少留施工缝。D选项，在终凝后应立即进行养护，养护时间不得少于14d。E选项，防水混凝土结构内部设置的各种钢筋或绑扎铁丝，不得接触模版。",{"id":6,"name":31,"category":32,"favorite":33},"二建建筑工程实务","建筑工程",0]