[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1121055":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1121055,790,1,"单选题","基坑（槽）验槽应由()负责组织。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","项目经理",false,{"key":16,"text":17,"correct":14},"B","项目总工",{"key":19,"text":20,"correct":21},"C","总监理工程师",true,{"key":23,"text":24,"correct":14},"D","建设单位技术负责人","2021\u002F2020版教材P53 三、验槽程序〔2〉由总监理工程师或建设单位项目负责人组织建设、监理、勘察、设计及施工单位的项目负责人、技术质量负责人，共同按设计要求和有关规定进行。",{"id":6,"name":27,"category":28,"favorite":29},"二建建筑工程实务","建筑工程",0]