[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1120993":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1120993,790,2,"多选题","某公共建筑工程基坑验槽时，( )单位有关人员必须参加验收。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","勘察",true,{"key":16,"text":17,"correct":14},"B","监理",{"key":19,"text":20,"correct":14},"C","施工总包",{"key":22,"text":23,"correct":14},"D","设计",{"key":25,"text":26,"correct":27},"E","支护分包",false,"ABCD","2021\u002F2020版教材P53 三、验槽程序：（2）由由总监工程师或建设单位项目负责人组织建设、监理、勘察、设计、施工单位的项目负责人、技术质量负责人，共同按设计要求有关规定进行。",{"id":6,"name":31,"category":32,"favorite":33},"二建建筑工程实务","建筑工程",0]