[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1120990":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1120990,790,1,"单选题","基坑开挖完毕，进行土方回填时，采用人工打夯填土施工的分层厚度应控制在( )mm。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","小于200",true,{"key":16,"text":17,"correct":18},"B","200~250",false,{"key":20,"text":21,"correct":18},"C","250~350",{"key":23,"text":24,"correct":18},"D","250~300","2021\u002F2020版教材P51 表2A312021内容：250~300平碾，250~350振动压实机，200~250柴油打夯机，人工打夯小于200。",{"id":6,"name":27,"category":28,"favorite":29},"二建建筑工程实务","建筑工程",0]