[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1120972":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1120972,790,2,"多选题","设备基础混凝土一般应分层浇筑，下面正确的做法是( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","允许上下层之间留设施工缝",false,{"key":16,"text":17,"correct":18},"B","保证上下层之间不留施工缝",true,{"key":20,"text":21,"correct":18},"C","保证下层初凝前浇筑上层",{"key":23,"text":24,"correct":14},"D","保证下层初凝后浇筑上层",{"key":26,"text":27,"correct":18},"E","每层混凝土的厚度为300～500mm","BCE","2021\u002F2020版教材P57 设备基础浇筑，一般应分层浇筑，并保证上下层之间不留施工缝，每层混凝土的厚度为300-500mm。每层浇筑顺序应从低处开始，沿长边方向自一端向另一端浇筑，也可采取中间向两端或两端向中间浇筑的顺序。",{"id":6,"name":31,"category":32,"favorite":33},"二建建筑工程实务","建筑工程",0]