[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1120366":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1120366,790,1,"单选题","关于幕墙预埋件安装工艺的说法，正确的是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","在主体结构浇捣混凝土时按照设计要求的数量埋设",false,{"key":16,"text":17,"correct":14},"B","连接部位的主体结构混凝土强度等级不应低于C15",{"key":19,"text":20,"correct":21},"C","轻质填充墙不应作幕墙的支承结构",true,{"key":23,"text":24,"correct":14},"D","预埋件采用热镀锌防腐处理时，锌膜厚度应小于40μm","预埋件在主体结构浇捣混凝土前按照设计要求的位置、规格埋设，A正确；连接部位的主体结构混凝土强度等级不应低于C20，B错误；轻质填充墙不应作幕墙的支承结构，C正确。预埋件采用热镀锌防腐处理时，锌膜厚度应大于40μm，D错误。",{"id":6,"name":27,"category":28,"favorite":29},"二建建筑工程实务","建筑工程",0]