[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1120365":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1120365,790,1,"单选题","某不上人吊顶工程，下列做法错误的是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","预埋件、钢筋吊杆进行了防锈处理",false,{"key":16,"text":17,"correct":14},"B","安装面板前完成吊顶内管道和设备的验收",{"key":19,"text":20,"correct":21},"C","检修口处未设置附加吊杆",true,{"key":23,"text":24,"correct":14},"D","吊杆可以采用φ6钢筋等吊杆","吊顶灯具、风口及检修口等应设附加吊杆。",{"id":6,"name":27,"category":28,"favorite":29},"二建建筑工程实务","建筑工程",0]