[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1120347":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1120347,790,1,"单选题","预制混凝土板水平运输时，叠放不宜超过（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","3层",false,{"key":16,"text":17,"correct":14},"B","4层",{"key":19,"text":20,"correct":14},"C","5层",{"key":22,"text":23,"correct":24},"D","6层",true,"本题考查的是钢筋混凝土装配式工程施工技术。选项A、B、C错误。装配式混凝土建筑预制构件运输要求：水平运输时，预制梁、柱构件叠放不易超过3层，板类构件叠放不易超过6层。",{"id":6,"name":27,"category":28,"favorite":29},"二建建筑工程实务","建筑工程",0]