[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1120305":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1120305,790,1,"单选题","设计无明确要求时，模板的拆除顺序正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","从上而下",true,{"key":16,"text":17,"correct":18},"B","先支的先拆",false,{"key":20,"text":21,"correct":18},"C","先拆承重模板",{"key":23,"text":24,"correct":18},"D","后拆非承重模板","本题考查的是模板的拆除。选项B、选项C、选项D说反了。",{"id":6,"name":27,"category":28,"favorite":29},"二建建筑工程实务","建筑工程",0]