[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1120275":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1120275,790,2,"多选题","地基验槽中采用钎探法时，同一单位工程中各钎探点打钎应（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","钎径一致",true,{"key":16,"text":17,"correct":18},"B","钎探耗时一致",false,{"key":20,"text":21,"correct":14},"C","锤重一致",{"key":23,"text":24,"correct":14},"D","用力（落距）一致",{"key":26,"text":27,"correct":18},"E","锤击数一致","ACD","本题考查的是验槽方法。打钎时，同一工程应钎径一致（选项A）、锤重一致（选项C）、用力（落距）一致（选项D）。因此正确选项是ACD。钎探法中，土层软硬不同，锤击数肯定不相同，钎探的目的也就是通过锤击数反映土层的软硬程度，因此，选项E错误。钎探对时间无要求，只是要求开挖后及时验槽，选项B不应选择。",{"id":6,"name":31,"category":32,"favorite":33},"二建建筑工程实务","建筑工程",0]