[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1120138":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1120138,790,2,"多选题","下列时间段中，全过程均属于夜间施工时段的有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","20:00—次日4:00",false,{"key":16,"text":17,"correct":14},"B","21:00—次日6:00",{"key":19,"text":20,"correct":21},"C","22:00—次日4:00",true,{"key":23,"text":24,"correct":21},"D","23:00—次日6:00",{"key":26,"text":27,"correct":14},"E","22:00—次日7:00","CD","本题考查的是现场环境保护管理。。夜间（一般指当日22时至次日6时，特殊地区可由当地政府部门另行规定）施工的，需办理夜间施工许可证明，并公告附近社区居民。选项C、选项D在当日22时至次日6时这个时间段内，全过程均属于夜间施工时段。",{"id":6,"name":31,"category":32,"favorite":33},"二建建筑工程实务","建筑工程",0]