[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1120135":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1120135,790,1,"单选题","通常情况下，向施工单位提供施工场地内地下管线资料的单位是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","勘察单位",false,{"key":16,"text":17,"correct":14},"B","设计单位",{"key":19,"text":20,"correct":21},"C","建设单位",true,{"key":23,"text":24,"correct":14},"D","监理单位","本题考查的是验槽前的准备工作。施工单位验槽前的准备工作包括，要求建设方（选项C）提供场地内是否有地下管线和相应的地下设施，这也是建设单位的义务之一。",{"id":6,"name":27,"category":28,"favorite":29},"二建建筑工程实务","建筑工程",0]