[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1120094":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1120094,790,1,"单选题","关于施工现场动火审批程序的描述正确的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","三级动火作业申请表由班组填写，经过项目负责人和项目安全管理部门审批",true,{"key":16,"text":17,"correct":18},"B","二级动火作业申请表由项目负责人组织拟订填写",false,{"key":20,"text":21,"correct":18},"C","一级动火作业申请表由项目责任工程师组织拟订填写",{"key":23,"text":24,"correct":18},"D","钢结构的安装焊接属于一级动火","一级动火作业由项目负责人组织编制防火安全技术方案，填写动火申请表，报企业安全管理部门审查批准后，方可动火，如钢结构的安装焊接。二级动火作业由项目责任工程师组织拟订防火安全技术措施，填写动火申请表，报项目安全管理部门和项目负责人审查批准后，方可动火。三级动火作业由所在班组填写动火申请表，经项目责任工程师和项目安全管理部门审查批准后，方可动火。",{"id":6,"name":27,"category":28,"favorite":29},"二建建筑工程实务","建筑工程",0]