[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":568},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,8,50,2973,[13,34,46,58,70,82,93,104,116,128,139,151,163,175,187,199,211,223,235,247,259,267,278,287,299,311,323,332,344,354,366,378,390,398,407,419,431,439,449,459,468,476,484,496,508,519,531,540,552,560],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1117417,1,"单选题","对于一个建设工程项目而言，虽然有代表不同利益方的项目管理，但是，( )的项目管理是管理的核心。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","设计方",false,{"key":24,"text":25,"correct":26},"B","业主方",true,{"key":28,"text":29,"correct":22},"C","建设项目工程总承包方",{"key":31,"text":32,"correct":22},"D","施工方","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1117418,"总承包单位的项目管理是贯穿于项目( )的全面管理。",[38,40,42,44],{"key":20,"text":39,"correct":22},"全寿命周期",{"key":24,"text":41,"correct":26},"实施阶段全过程",{"key":28,"text":43,"correct":22},"施工安装阶段",{"key":31,"text":45,"correct":22},"设计阶段",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1117419,"建设项目工程总承包的核心是为了达到()的目的。",[50,52,54,56],{"key":20,"text":51,"correct":22},"总价包干",{"key":24,"text":53,"correct":22},"交钥匙",{"key":28,"text":55,"correct":26},"项目增值",{"key":31,"text":57,"correct":22},"生产集成化",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1117420,"甲企业为某工程项目的施工总承包方，乙企业为甲企业自行分包的分包单位，丙企业则为该工程项目业主指定的分包单位，这三家企业在施工及管理中的正确关系是（）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"甲企业只负责完成自己承担的施工任务",{"key":24,"text":65,"correct":22},"丙企业只听从业主的指令",{"key":28,"text":67,"correct":22},"丙企业可指挥乙企业的施工",{"key":31,"text":69,"correct":26},"甲企业负责组织和指挥乙企业与丙企业的施工",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1117421,"建设工程项目管理的内涵是自项目开始至项目完成，通过项目策划和项目控制，以使项目的费用目标、进度目标和质量目标得以实现。其中费用目标相对于施工方而言是()。",[74,76,78,80],{"key":20,"text":75,"correct":22},"投资目标",{"key":24,"text":77,"correct":22},"社会目标",{"key":28,"text":79,"correct":26},"成本目标",{"key":31,"text":81,"correct":22},"经济目标",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1117422,"施工方是建设项目的一个重要参与方，下列各项中不属于施工方的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"仅提供施工劳务的参与方",{"key":24,"text":89,"correct":22},"施工总承包管理方",{"key":28,"text":91,"correct":22},"分包施工方",{"key":31,"text":29,"correct":26},{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":31,"analysis":33},1117423,"指定供应商的项目管理工作主要在建设工程项目的（）进行。",[97,99,101,102],{"key":20,"text":98,"correct":22},"决策阶段",{"key":24,"text":100,"correct":22},"实施阶段",{"key":28,"text":45,"correct":22},{"key":31,"text":103,"correct":26},"施工阶段",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":20,"analysis":33},1117424,"供货方作为项目建设的一个参与方，其项目管理工作主要在()阶段进行。",[108,110,112,114],{"key":20,"text":109,"correct":26},"施工",{"key":24,"text":111,"correct":22},"设计准备",{"key":28,"text":113,"correct":22},"设计",{"key":31,"text":115,"correct":22},"动用前准备",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":28,"analysis":33},1117425,"关于建设项目工程总承包的特点，说法错误的是( )。",[120,122,124,126],{"key":20,"text":121,"correct":22},"建设项目工程总承包的基本出发点是借鉴工业生产组织的经验",{"key":24,"text":123,"correct":22},"工程总承包和工程项目管理是国际通行的工程建设项目组织实施方式",{"key":28,"text":125,"correct":26},"建设项目工程总承包的主要意义在于总价包干",{"key":31,"text":127,"correct":22},"建设项目工程总承包的核心是促进设计与施工的紧密结合",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":28,"analysis":33},1117426,"下列各选项中，()对所承包的建设工程承担施工任务的执行和组织的总的责任。",[132,133,135,137],{"key":20,"text":89,"correct":22},{"key":24,"text":134,"correct":22},"业主",{"key":28,"text":136,"correct":26},"施工总承包方",{"key":31,"text":138,"correct":22},"监理",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":24,"analysis":33},1117427,"施工方的项目管理，是指自项目开始至项目完成，通过项目策划和项目控制，实现项目的费用目标、进度目标和质量目标。对此，下列说法中正确的是（）",[143,145,147,149],{"key":20,"text":144,"correct":22},"自项目开始至项目完成指的是项目的生命周期",{"key":24,"text":146,"correct":26},"项目策划指的是项目目标控制前的一系列筹划和准备工作",{"key":28,"text":148,"correct":22},"费用目标对业主而言就是成本目标",{"key":31,"text":150,"correct":22},"项目实施期管理的主要任务就是通过项目控制实现项目投资目标",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":31,"analysis":33},1117428,"关于施工总承包方管理任务的说法,正确的是()。",[155,157,159,161],{"key":20,"text":156,"correct":22},"施工总承包方一般不承担施工任务,只承担施工的总体管理和协调工作",{"key":24,"text":158,"correct":22},"施工总承包方只负责所施工部分的施工安全,对业主指定分包商的施工安全全部承担责任",{"key":28,"text":160,"correct":22},"施工总承包方不与分包商直接签订施工合同,均由业主方签订",{"key":31,"text":162,"correct":26},"施工总承包方应负责施工资源的供应组织",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":24,"analysis":33},1117429,"我国多数企业和建设项目的指挥或管理机构，习惯用()来描述每一个工作部门的工作任务。",[167,169,171,173],{"key":20,"text":168,"correct":22},"管理职能分工描述书",{"key":24,"text":170,"correct":26},"岗位责任描述书",{"key":28,"text":172,"correct":22},"工作任务分工描述书",{"key":31,"text":174,"correct":22},"工作任务分工表",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":31,"analysis":33},1117430,"中兴建设公司通过竞标承揽了一小型住宅小区工程，实施任务之前确定采用线性组织结构模式，反映工作部门之间的组织关系，则该组织结构模式的特点是()",[179,181,183,185],{"key":20,"text":180,"correct":22},"这是一种较新型的组织结构模式，指令源两个。",{"key":24,"text":182,"correct":22},"会有多个矛盾的指令源",{"key":28,"text":184,"correct":22},"一个上级部门只能有唯一的一个下级",{"key":31,"text":186,"correct":26},"指令路径过长，有可能造成组织系统在一定程度上运行的困难",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":28,"analysis":33},1117431,"关于项目结构图、组织结构图、合同结构图和工作流程图的区别，下列说法不正确的是（ ）。",[191,193,195,197],{"key":20,"text":192,"correct":22},"项目结构图反映组成该项目的所有工作任务",{"key":24,"text":194,"correct":22},"组织结构图反映一个组织系统中各工作单位、各组成部门之间组织关系",{"key":28,"text":196,"correct":26},"合同结构图反映一个建设项目各参与部门之间的合同关系",{"key":31,"text":198,"correct":22},"工作流程图反映一个组织系统中各项工作任务之间的逻辑关系",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":31,"analysis":33},1117432,"采用项目结构图对建设工程项目进行分解时，同一个建设工程项目可有不同的项目结构的分解方法，应与将采用的( )结合。",[203,205,207,209],{"key":20,"text":204,"correct":22},"组织结构",{"key":24,"text":206,"correct":22},"工程流程",{"key":28,"text":208,"correct":22},"职能结构",{"key":31,"text":210,"correct":26},"合同结构",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":24,"analysis":33},1117433,"在（）之前，应结合项目的特点，对项目实施各阶段的费用控制、进度控制、质量控制、合同管理、信息管理和组织与协调等管理任务进行详细分解。",[215,217,219,221],{"key":20,"text":216,"correct":22},"编制管理职能分工表",{"key":24,"text":218,"correct":26},"编制项目管理任务分工表",{"key":28,"text":220,"correct":22},"绘制组织结构图",{"key":31,"text":222,"correct":22},"绘制工作流程图",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":28,"analysis":33},1117434,"工作流程组织包括管理工作流程组织、信息处理工作流程组织和物质流程组织。设计工作流程、物资采购工作流程和施工作业流程的组织属于()。",[227,229,231,233],{"key":20,"text":228,"correct":22},"管理工作流程组织",{"key":24,"text":230,"correct":22},"信息处理工作流程组织",{"key":28,"text":232,"correct":26},"物质流程组织",{"key":31,"text":234,"correct":22},"工作任务结构",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":31,"analysis":33},1117435,"下图所示的职能组织结构中，m、f1、f2、f3、g1、g2等分别代表不同的工作部门或主管人员。这个组织结构表明（）。",[239,241,243,245],{"key":20,"text":240,"correct":22},"m只可以指挥g1和g2",{"key":24,"text":242,"correct":22},"g3只接受f3下达的指令",{"key":28,"text":244,"correct":22},"g1只可直接接受m的指令",{"key":31,"text":246,"correct":26},"g可接受f1、f2和f3的直接指挥",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":28,"analysis":33},1117436,"某建设工程项目的管理按照职能组织结构模式运行，这个组织系统的特点是()",[251,253,255,257],{"key":20,"text":252,"correct":22},"没有相互矛盾的指令源",{"key":24,"text":254,"correct":22},"有纵向和横向的指令源",{"key":28,"text":256,"correct":26},"可能有多个矛盾的指令源",{"key":31,"text":258,"correct":22},"指令源唯一",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":31,"analysis":33},1117437,"线性组织结构模式的特点是（）。",[263,264,265,266],{"key":20,"text":252,"correct":22},{"key":24,"text":254,"correct":22},{"key":28,"text":256,"correct":22},{"key":31,"text":258,"correct":26},{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":24,"analysis":33},1117438,"项目管理班子中各单位、各工作部门和各工作人员之间的组织关系，可以通过组织工具( )反映。",[271,273,275,276],{"key":20,"text":272,"correct":22},"管理职能分工表",{"key":24,"text":274,"correct":26},"组织结构图",{"key":28,"text":174,"correct":22},{"key":31,"text":277,"correct":22},"工作流程图",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":31,"analysis":33},1117439,"王工程师凭借其多年的项目管理经验，被鸿业建筑公司聘请为欧亚会馆项目经理。在项目管理任务分工过程中，项目经理可以采用的组织工具是()。",[282,283,285,286],{"key":20,"text":274,"correct":22},{"key":24,"text":284,"correct":22},"项目结构图",{"key":28,"text":277,"correct":22},{"key":31,"text":174,"correct":26},{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":24,"analysis":33},1117440,"所谓管理是由提出问题、筹划、决策、执行和检查等多个环节组成的过程。下列选项中属于决策环节是（）。",[291,293,295,297],{"key":20,"text":292,"correct":22},"执行补救方案",{"key":24,"text":294,"correct":26},"从多个方案中确定一个拟执行方案",{"key":28,"text":296,"correct":22},"制定几个可能的补救方案",{"key":31,"text":298,"correct":22},"检查补救方案的执行情况",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":28,"analysis":33},1117441,"在某地铁建设项目中，总承包商选择了矩阵式组织结构模式，使得一些项目成员不得不接受来自纵向和横向两个部门的指令。其中发出横向“指令的”工作部门可以是()。",[303,305,307,309],{"key":20,"text":304,"correct":22},"项目经理办公室",{"key":24,"text":306,"correct":22},"采购管理部",{"key":28,"text":308,"correct":26},"各子项目管理部",{"key":31,"text":310,"correct":22},"预算管理部",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":31,"analysis":33},1117442,"项目管理任务分工表的编制程序包括：①编制任务分工表；②进行项目管理任务分解；③明确各工作部门或个人的工作任务。其正确的顺序是()。",[315,317,319,321],{"key":20,"text":316,"correct":22},"①—②—③",{"key":24,"text":318,"correct":22},"②—①—③",{"key":28,"text":320,"correct":22},"③—②—①",{"key":31,"text":322,"correct":26},"②—③—①",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":24,"analysis":33},1117443,"下列组织工具图，表示的是()。",[327,328,329,331],{"key":20,"text":284,"correct":22},{"key":24,"text":274,"correct":26},{"key":28,"text":330,"correct":22},"合同结构图",{"key":31,"text":277,"correct":22},{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":20,"analysis":33},1117444,"为了加快施工进度，施工协调部门根据项目经理的要求，落实有关夜间施工条件、组织夜间施工的工作，属于管理职能中的()环节。",[336,338,340,342],{"key":20,"text":337,"correct":26},"执行",{"key":24,"text":339,"correct":22},"检查",{"key":28,"text":341,"correct":22},"决策",{"key":31,"text":343,"correct":22},"筹划",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":24,"analysis":33},1117445,"用表的形式反映各工作部门和各工作岗位对各项工作任务的项目管理职能分工的组织工具是()。",[348,350,351,353],{"key":20,"text":349,"correct":22},"管理工作分工表",{"key":24,"text":272,"correct":26},{"key":28,"text":352,"correct":22},"项目结构表",{"key":31,"text":174,"correct":22},{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":24,"analysis":33},1117446,"项目管理组织结构编码依据()，对每一个工作部门进行编码。",[358,360,362,364],{"key":20,"text":359,"correct":22},"项目管理施工图",{"key":24,"text":361,"correct":26},"项目管理的项目结构图",{"key":28,"text":363,"correct":22},"项目管理的组织结构图",{"key":31,"text":365,"correct":22},"项目管理的结构控制图",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":24,"analysis":33},1117447,"振兴工程公司承揽了幸福住宅小区建设项目，开工前，该项目的项目经理编制工 作任务分工表，首先要对各项管理工作进行()。",[370,372,374,376],{"key":20,"text":371,"correct":22},"系统整合",{"key":24,"text":373,"correct":26},"详细分解",{"key":28,"text":375,"correct":22},"整体归纳",{"key":31,"text":377,"correct":22},"综合评价",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":24,"analysis":33},1117448,"在（）中，指令来自于纵向和横向工作部门，其指令源为两个，适宜用于大的组织系统。",[382,384,386,388],{"key":20,"text":383,"correct":22},"立体组织结构",{"key":24,"text":385,"correct":26},"矩阵组织结构",{"key":28,"text":387,"correct":22},"线性组织结构",{"key":31,"text":389,"correct":22},"职能组织结构",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":24,"analysis":33},1117449,"项目结构图、组织结构图、工作任务分工表、管理职能分工表和工作流程图等都是常用的组织工具，其中能反映组织系统中动态关系的组织工具是（）。",[394,395,396,397],{"key":20,"text":174,"correct":22},{"key":24,"text":277,"correct":26},{"key":28,"text":274,"correct":22},{"key":31,"text":284,"correct":22},{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":24,"analysis":33},1117450,"在某纺织职业技术学校新区建设中，总承包商的项目经理在开工前组织有关人员对项目结构进行了逐层分解。这项工作所采用的组织工具应是()。",[402,404,405,406],{"key":20,"text":403,"correct":22},"项目组织结构图",{"key":24,"text":284,"correct":26},{"key":28,"text":277,"correct":22},{"key":31,"text":330,"correct":22},{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":31,"analysis":33},1117451,"线性组织结构模式的特点之一是()。",[411,413,415,417],{"key":20,"text":412,"correct":22},"组织内每个工作部门可能有多个矛盾的指令源",{"key":24,"text":414,"correct":22},"组织内每个工作部门有横向和纵向两个指令源",{"key":28,"text":416,"correct":22},"能促进组织内管理专业化分工",{"key":31,"text":418,"correct":26},"组织内每个工作部门只接受一个上级的直接领导",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":24,"analysis":33},1117452,"建设工程项目信息编码由一系列()组成，是信息处理的一项重要的基础工作。",[423,425,427,429],{"key":20,"text":424,"correct":22},"文字",{"key":24,"text":426,"correct":26},"符号和数字",{"key":28,"text":428,"correct":22},"数字",{"key":31,"text":430,"correct":22},"文字和数字",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":20,"analysis":33},1117453,"能够反映项目管理班子内部项目经理、各工作部门和各工作岗位在各项管理工作中所应承担的策划、执行、控制等职责的组织工具是( )。",[435,436,437,438],{"key":20,"text":272,"correct":26},{"key":24,"text":274,"correct":22},{"key":28,"text":174,"correct":22},{"key":31,"text":277,"correct":22},{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":31,"analysis":33},1117454,"新源职业技术学院拟建设1栋6000㎡的学生宿舍楼，中兴建设公司参加了投标。在编制投标文件过程中确立了项目组织机构，采用线性组织结构模式。这种组织系统的特点是( )。",[443,445,446,447],{"key":20,"text":444,"correct":22},"每一个工作部门可以有二个以上的直接上级部门",{"key":24,"text":254,"correct":22},{"key":28,"text":256,"correct":22},{"key":31,"text":448,"correct":26},"指令源惟一",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":20,"analysis":33},1117455,"反映一个组织系统中各子系统之间指令关系的是( )",[453,454,456,458],{"key":20,"text":274,"correct":26},{"key":24,"text":455,"correct":22},"职能分工表",{"key":28,"text":457,"correct":22},"项目合同图",{"key":31,"text":277,"correct":22},{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":20,"analysis":33},1117456,"反映一个组织系统中各组成部门（组成元素）之间的组织关系的组织工具是()。",[463,464,465,467],{"key":20,"text":274,"correct":26},{"key":24,"text":284,"correct":22},{"key":28,"text":466,"correct":22},"职能关系图",{"key":31,"text":330,"correct":22},{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":20,"analysis":33},1117457,"项目结构的编码依据()，对项目结构的每一层的每一个组成部分进行编码。",[472,473,474,475],{"key":20,"text":284,"correct":26},{"key":24,"text":274,"correct":22},{"key":28,"text":277,"correct":22},{"key":31,"text":174,"correct":22},{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":20,"analysis":33},1117458,"用图的形式反映一个组织系统中各项工作之间的逻辑关系的组织工具是()。",[480,481,482,483],{"key":20,"text":277,"correct":26},{"key":24,"text":330,"correct":22},{"key":28,"text":274,"correct":22},{"key":31,"text":284,"correct":22},{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":20,"analysis":33},1117459,"下列关于项目结构分解的说法正确的是（）。",[488,490,492,494],{"key":20,"text":489,"correct":26},"项目结构分解没有既定的模式",{"key":24,"text":491,"correct":22},"对同一个项目其项目结构分解的方法是唯一的",{"key":28,"text":493,"correct":22},"单体工程不必进行项目结构分解",{"key":31,"text":495,"correct":22},"工业建设项目通常按照建设时间对项目结构进行分解",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":31,"analysis":33},1117460,"在矩阵组织结构模式中，为避免纵向和横向工作部门的指令矛盾时对工作产生影响，宜选择的做法是（）。",[500,502,504,506],{"key":20,"text":501,"correct":22},"让两类部门自己解决矛盾",{"key":24,"text":503,"correct":22},"由最高管理者亲自指挥",{"key":28,"text":505,"correct":22},"由员工判断接受谁的指令",{"key":31,"text":507,"correct":26},"明确以纵向或横向指令为主的管理模式",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":31,"analysis":33},1117461,"西南学院图书馆工程项目经理，在建立项目组织机构时采用了线性组织结构模式。该项目组织结构的特点是（）。",[512,513,515,517],{"key":20,"text":256,"correct":22},{"key":24,"text":514,"correct":22},"有横向和纵向两个指令源",{"key":28,"text":516,"correct":22},"能促进管理专业化分工",{"key":31,"text":518,"correct":26},"每个工作部门只接受一个上级的直接领导",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":28,"analysis":33},1117462,"如果把一个建设项目的项目管理视作为一个系统，则（）是项目管理目标能否实现的决定性因素。",[523,525,527,529],{"key":20,"text":524,"correct":22},"项目管理的策划",{"key":24,"text":526,"correct":22},"项目管理的检查",{"key":28,"text":528,"correct":26},"项目管理的组织",{"key":31,"text":530,"correct":22},"项目管理的控制",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":24,"analysis":33},1117463,"某建筑工程公司承揽了某新建项目的施工任务，开工前，该项目的项目经理编制任务分工表，首先要对各项管理任务进行()。",[535,536,537,539],{"key":20,"text":371,"correct":22},{"key":24,"text":373,"correct":26},{"key":28,"text":538,"correct":22},"责任分解",{"key":31,"text":377,"correct":22},{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":31,"analysis":33},1117464,"下列关于项目管理工作任务分工表的说法，正确的是()。",[544,546,548,550],{"key":20,"text":545,"correct":22},"工作任务分工表反映组织系统的动态关系",{"key":24,"text":547,"correct":22},"一个工程项目只能编制一张工作任务分工表",{"key":28,"text":549,"correct":22},"工作任务分工表中的具体任务不能改变",{"key":31,"text":551,"correct":26},"工作任务分工表是项目的组织设计文件之一",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":24,"analysis":33},1117465,"下列选项中，能反映项目组织系统中各项工作之间逻辑关系的组织工作是()。",[556,557,558,559],{"key":20,"text":284,"correct":22},{"key":24,"text":277,"correct":26},{"key":28,"text":174,"correct":22},{"key":31,"text":274,"correct":22},{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":31,"analysis":33},1117466,"反映企业中各工作部门之间的指令关系的组织工具应当是()。",[564,565,566,567],{"key":20,"text":277,"correct":22},{"key":24,"text":174,"correct":22},{"key":28,"text":284,"correct":22},{"key":31,"text":274,"correct":26},[569,572,575,578,581,584],{"id":15,"name":570,"category":7,"favorite":571},"领导干部任职前廉政法规知识测试题",92,{"id":573,"name":574,"category":7,"favorite":15},595,"建筑结构与设备",{"id":576,"name":577,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":579,"name":580,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":582,"name":583,"category":7,"favorite":8},534,"BIM工程师",{"id":585,"name":583,"category":7,"favorite":8},535]