[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":588},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,7,50,2973,[13,34,46,58,70,82,94,106,116,126,138,149,161,169,181,193,205,217,229,241,253,261,273,285,297,309,321,333,344,356,368,380,391,403,415,424,436,447,456,465,473,485,496,505,517,529,541,552,564,576],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1117367,1,"单选题","编制可行性研究报告属于建设工程全寿命周期的( )的工作。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","使用阶段",false,{"key":24,"text":25,"correct":26},"B","决策阶段",true,{"key":28,"text":29,"correct":22},"C","设计阶段",{"key":31,"text":32,"correct":22},"D","实施阶段","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1117368,"某一年产量为50万吨乙烯的石油冶炼项目通过公开招标的方式最终确定某工程总承包公司负责完成该项目的设计、采购和施工等任务，则本项目所采用的工程项目承包模式在国际上通常被称作()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"D+B承包模式",{"key":24,"text":41,"correct":22},"D-B-B承包模式",{"key":28,"text":43,"correct":26},"EPC承包模式",{"key":31,"text":45,"correct":22},"BOT承包模式",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1117369,"某建设工程项目采取施工总承包管理模式，其中的二次装饰装修工程由建设单位发包给乙单位，则在施工中，乙单位应该直接接受()的工作指令。",[50,52,54,56],{"key":20,"text":51,"correct":22},"建设单位",{"key":24,"text":53,"correct":22},"设计单位",{"key":28,"text":55,"correct":26},"施工总承包管理企业",{"key":31,"text":57,"correct":22},"施工承包企业",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1117370,"关于建设工程项目管理说法，下列选项中正确的是()",[62,64,66,68],{"key":20,"text":63,"correct":22},"施工方的项目管理涉及项目全寿命周期",{"key":24,"text":65,"correct":22},"施工方的项目管理主要服务于施工方本身的利益",{"key":28,"text":67,"correct":26},"业主方项目管理是整个项目管理的核心",{"key":31,"text":69,"correct":22},"施工方项目管理的目标包括项目的投资目标以及施工的成本、进度和质量目标",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1117371,"下列选项中，属于项目设计准备阶段主要工作的是（）",[74,76,78,80],{"key":20,"text":75,"correct":22},"编制项目建议书",{"key":24,"text":77,"correct":22},"编制项目总进度计划",{"key":28,"text":79,"correct":26},"编制设计任务书",{"key":31,"text":81,"correct":22},"编制项目成本计划",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1117372,"建设项目实施阶段管理工作的主要任务是（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"项目策划",{"key":24,"text":89,"correct":22},"项目控制",{"key":28,"text":91,"correct":26},"通过管理使项目目标实现",{"key":31,"text":93,"correct":22},"项目定义",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1117373,"建筑工程项目总承包的基本出发点是借鉴工业生产组织的经验，实现建设生产过程的()。",[98,100,102,104],{"key":20,"text":99,"correct":22},"组织柔性化",{"key":24,"text":101,"correct":26},"组织集成化",{"key":28,"text":103,"correct":22},"组织扁平化",{"key":31,"text":105,"correct":22},"组织高效化",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},1117374,"根据建设工程项目的阶段划分,属于设计准备阶段工作的是()。",[110,112,114,115],{"key":20,"text":111,"correct":22},"编制项目可行性研究报告",{"key":24,"text":113,"correct":22},"编制初步设计",{"key":28,"text":79,"correct":26},{"key":31,"text":75,"correct":22},{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":28,"analysis":33},1117375,"对专业分包企业的工作和负责的工程负有协调和管理责任,并承担由此造成损失的単位是()。",[120,121,122,124],{"key":20,"text":53,"correct":22},{"key":24,"text":51,"correct":22},{"key":28,"text":123,"correct":26},"施工总承包企业",{"key":31,"text":125,"correct":22},"监理单位",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":31,"analysis":33},1117376,"工程项目建设有众多的参与方,各方为实现特定目标而进行不同类型的项目管理,但核心是()方的项目管理。",[130,132,134,136],{"key":20,"text":131,"correct":22},"设计",{"key":24,"text":133,"correct":22},"总承包",{"key":28,"text":135,"correct":22},"监理",{"key":31,"text":137,"correct":26},"业主",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":24,"analysis":33},1117377,"建设项目工程总承包方的项目管理工作主要在项目的()进行。",[142,144,145,147],{"key":20,"text":143,"correct":22},"施工阶段",{"key":24,"text":32,"correct":26},{"key":28,"text":146,"correct":22},"设计阶段和实施阶段",{"key":31,"text":148,"correct":22},"施工阶段和保修阶段",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":28,"analysis":33},1117378,"建设工程项目管理就是自项目开始到项目完成，通过()，使项目目标得以实现。",[153,155,157,159],{"key":20,"text":154,"correct":22},"项目组织和项目控制",{"key":24,"text":156,"correct":22},"项目策划和项目组织",{"key":28,"text":158,"correct":26},"项目策划和项目控制",{"key":31,"text":160,"correct":22},"项目控制和项目协调",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":24,"analysis":33},1117379,"编制项目建议书属于建设工程全寿命周期的( )的工作。",[165,166,167,168],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":22},{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":31,"analysis":33},1117380,"施工方的项目管理主要服务于施工方本身的利益和()。",[173,175,177,179],{"key":20,"text":174,"correct":22},"业主方的利益",{"key":24,"text":176,"correct":22},"总承包方的利益",{"key":28,"text":178,"correct":22},"社会的利益",{"key":31,"text":180,"correct":26},"项目整体利益",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":31,"analysis":33},1117381,"以下不属于业主方在设计阶段的工作是()。",[185,187,189,191],{"key":20,"text":186,"correct":22},"初步设计",{"key":24,"text":188,"correct":22},"技术设计",{"key":28,"text":190,"correct":22},"施工图设计",{"key":31,"text":192,"correct":26},"工期设计",{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":31,"analysis":33},1117382,"关于建设工程项目管理的表述，不正确的是()。",[197,199,201,203],{"key":20,"text":198,"correct":22},"建设工程项目管理的内涵是自项目开始至项目完成，通过项目策划和项目控制，以使项目的费用目标、进度目标和质量目标得以实现",{"key":24,"text":200,"correct":22},"自项目开始至项目完成指的是项目的实施期",{"key":28,"text":202,"correct":22},"项目实施期管理的主要任务是通过管理使项目的目标得以实现",{"key":31,"text":204,"correct":26},"项目决策期管理工作的主要任务是确定项目的工期",{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":20,"analysis":33},1117383,"施工单位项目管理目标是()",[209,211,213,215],{"key":20,"text":210,"correct":26},"进度、质量、成本目标",{"key":24,"text":212,"correct":22},"设计目标",{"key":28,"text":214,"correct":22},"投资目标",{"key":31,"text":216,"correct":22},"利润最大化",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":31,"analysis":33},1117384,"下面关于施工总承包方管理任务方法错误的是（）",[221,223,225,227],{"key":20,"text":222,"correct":22},"负责整个工程的施工安全、总进度控制、施工质量控制和施工的组织与协调等。",{"key":24,"text":224,"correct":22},"负责组织和指挥分包施工单位的施工。",{"key":28,"text":226,"correct":22},"负责施工资源的供应组织。",{"key":31,"text":228,"correct":26},"代表建设方与设计、工程监理等外部单位进行必要的联系与协调",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":24,"analysis":33},1117385,"某业主欲投资建造一座五星级宾馆，业主方项目管理的进度目标指的是()。",[233,235,237,239],{"key":20,"text":234,"correct":22},"项目通过竣工验收",{"key":24,"text":236,"correct":26},"宾馆可以开业",{"key":28,"text":238,"correct":22},"项目竣工结算完成",{"key":31,"text":240,"correct":22},"宾馆开始盈利",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":20,"analysis":33},1117386,"下列关于施工方项目管理目标和任务的表述中，正确的是（）。",[245,247,249,251],{"key":20,"text":246,"correct":26},"施工方项目管理的目标包括建设项目施工的成本、进度、质量目标",{"key":24,"text":248,"correct":22},"施工总承包项目管理的目标包括项目的投资目标",{"key":28,"text":250,"correct":22},"施工总承包管理方不经投标可直接参与施工",{"key":31,"text":252,"correct":22},"施工总承包方一般不承担具体的施工任务",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":31,"analysis":33},1117387,"施工方作为项目建设的一个参与方，其项目管理主要服务于施工方本身的利益和()。",[257,258,259,260],{"key":20,"text":174,"correct":22},{"key":24,"text":176,"correct":22},{"key":28,"text":178,"correct":22},{"key":31,"text":180,"correct":26},{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},1117388,"建设项目工程总承包的基本出发点是（）。",[265,267,269,271],{"key":20,"text":266,"correct":22},"借鉴流水线的经验",{"key":24,"text":268,"correct":26},"实现建设生产过程的组织集成化",{"key":28,"text":270,"correct":22},"克服由于设计与施工的集成致使投资增加",{"key":31,"text":272,"correct":22},"加快施工进度",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":24,"analysis":33},1117389,"某企业承包了某石化工程项目的设计和施工任务，则该企业的项目管理属于建设项目（）。",[277,279,281,283],{"key":20,"text":278,"correct":22},"设计方的项目管理",{"key":24,"text":280,"correct":26},"工程总承包方的项目管理",{"key":28,"text":282,"correct":22},"施工方的项目管理",{"key":31,"text":284,"correct":22},"采购方的项目管理",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":31,"analysis":33},1117390,"工程项目实施期管理的主要任务是()。",[289,291,293,295],{"key":20,"text":290,"correct":22},"确定项目的工期",{"key":24,"text":292,"correct":22},"确定项目的负责人",{"key":28,"text":294,"correct":22},"确定项目的定义",{"key":31,"text":296,"correct":26},"通过管理使项目的目标得以实现",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":28,"analysis":33},1117391,"某建设项目采用施工总承包模式，甲施工总承包单位征得发包人同意，将部分专业工程分包给乙分包商，业主将幕墙工程分包给丙分包商，业主及甲、乙、丙三家单位在施工管理中的正确关系是()",[301,303,305,307],{"key":20,"text":302,"correct":22},"甲施工总承包单位不承担施工任务，只负责对乙分包商的组织管理和协调",{"key":24,"text":304,"correct":22},"丙分包商在施工中只听从业主的指令",{"key":28,"text":306,"correct":26},"甲施工总承包单位负责对乙分包商和丙分包商的组织管理和协调",{"key":31,"text":308,"correct":22},"乙分包商和丙分包商与甲施工总承包单位之间既是合同关系，又是指令关系",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":24,"analysis":33},1117392,"在建设工程施工总承包管理模式下，施工分包合同的主体一般是施工分包方和项目（）。",[313,315,317,319],{"key":20,"text":314,"correct":22},"总承包管理方",{"key":24,"text":316,"correct":26},"业主方",{"key":28,"text":318,"correct":22},"设计方",{"key":31,"text":320,"correct":22},"咨询机构",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":31,"analysis":33},1117393,"建设工程项目的全寿命周期包括项目的（）。",[325,327,329,331],{"key":20,"text":326,"correct":22},"可行性研究阶段、设计阶段、施工阶段",{"key":24,"text":328,"correct":22},"可行性研究阶段、施工阶段、使用阶段",{"key":28,"text":330,"correct":22},"决策阶段、实施阶段、保修阶段",{"key":31,"text":332,"correct":26},"决策阶段、实施阶段、使用阶段",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":31,"analysis":33},1117394,"按建设工程项目不同参与方的工作性质和组织特征划分，项目管理的类型不包括( )的项目管理。",[337,338,340,342],{"key":20,"text":316,"correct":22},{"key":24,"text":339,"correct":22},"施工方",{"key":28,"text":341,"correct":22},"总承包方",{"key":31,"text":343,"correct":26},"分包方",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":31,"analysis":33},1117395,"业主方项目管理的进度目标指的是()",[348,350,352,354],{"key":20,"text":349,"correct":22},"道路试运行结束",{"key":24,"text":351,"correct":22},"道路竣工结算完成",{"key":28,"text":353,"correct":22},"工厂通过竣工验收",{"key":31,"text":355,"correct":26},"工厂建成投入生产",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":20,"analysis":33},1117396,"建设工程项目管理的内涵是：自项目开始至项目完成，通过项目策划和项目控制，以使项目的（）得以实现。",[360,362,364,366],{"key":20,"text":361,"correct":26},"费用目标、进度目标和质量目标",{"key":24,"text":363,"correct":22},"成本目标、进度目标和质量目标",{"key":28,"text":365,"correct":22},"投资目标、进度目标和质量目标、安全目标",{"key":31,"text":367,"correct":22},"费用目标、进度目标和质量目标、安全目标",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":20,"analysis":33},1117397,"关于施工总承包管理方的主要特征，下列说法正确的是（）。",[372,374,376,378],{"key":20,"text":373,"correct":26},"一般情况下施工总承包管理方不承担施工任务，它主要进行施工的总体管理和协调",{"key":24,"text":375,"correct":22},"一般情况下，施工总承包管理方与分包方和供货方直接签订施工合同",{"key":28,"text":377,"correct":22},"业主方选定的分包方，业主方要承担对其的组织和管理责任",{"key":31,"text":379,"correct":22},"业主方选定的分包方可以不经施工总承包管理方的认可",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":31,"analysis":33},1117398,"按国际工程惯例，当采用指定分包商时，应对分包合同规定的工期和质量目标负责的是( )。",[384,385,387,389],{"key":20,"text":137,"correct":22},{"key":24,"text":386,"correct":22},"监理方",{"key":28,"text":388,"correct":22},"指定分包商",{"key":31,"text":390,"correct":26},"施工总承包方",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":31,"analysis":33},1117399,"下面关于总承包方管理目标和任务说法错误的是（）",[395,397,399,401],{"key":20,"text":396,"correct":22},"主要服务于项目的利益和建设项目总承包方本身的利益。",{"key":24,"text":398,"correct":22},"管理的目标包括项目的总投资目标",{"key":28,"text":400,"correct":22},"管理的目标包括总承包方的成本目标、项目的进度目标和项目的质量目标。",{"key":31,"text":402,"correct":26},"管理的目标包括施工的成本目标、施工的进度目标和施工的质量目标。",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":28,"analysis":33},1117400,"自项目开始至项目完成指的是项目的()。",[407,409,411,413],{"key":20,"text":408,"correct":22},"审批期",{"key":24,"text":410,"correct":22},"准备期",{"key":28,"text":412,"correct":26},"实施期",{"key":31,"text":414,"correct":22},"验收期",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":31,"analysis":33},1117401,"施工总承包管理方和()承担相同的管理任务和责任，即负责整个工程的施工安全控制、施工总进度控制、施工质量控制和施工的组织等。",[419,420,421,423],{"key":20,"text":318,"correct":22},{"key":24,"text":339,"correct":22},{"key":28,"text":422,"correct":22},"供货方",{"key":31,"text":390,"correct":26},{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":28,"analysis":33},1117402,"“对于某政府机关办公楼项目的业主方项目管理而言，其进度目标是该项目的( )”。",[428,430,432,434],{"key":20,"text":429,"correct":22},"立项时间目标",{"key":24,"text":431,"correct":22},"投产时间目标",{"key":28,"text":433,"correct":26},"启用时间目标",{"key":31,"text":435,"correct":22},"运营时间目标",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":28,"analysis":33},1117403,"在建设工程项目管理的内涵中，“费用目标”对业主而言指的是()。",[440,442,444,445],{"key":20,"text":441,"correct":22},"成本目标",{"key":24,"text":443,"correct":22},"利润目标",{"key":28,"text":214,"correct":26},{"key":31,"text":446,"correct":22},"融资目标",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":28,"analysis":33},1117404,"某工程项目施工采用施工总承包模式，其中电气设备由业主指定的分包单位采购和安装，则在施工中分包单位必须接受()的工作指令，服从其总体项目管理。",[451,452,453,454],{"key":20,"text":137,"correct":22},{"key":24,"text":318,"correct":22},{"key":28,"text":390,"correct":26},{"key":31,"text":455,"correct":22},"项目监理方",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":20,"analysis":33},1117405,"业主方的项目管理工作涉及项目实施阶段的全过程，在设计准备阶段的工作是()。",[460,461,462,464],{"key":20,"text":79,"correct":26},{"key":24,"text":75,"correct":22},{"key":28,"text":463,"correct":22},"编制可行性研究报告",{"key":31,"text":190,"correct":22},{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":31,"analysis":33},1117406,"业主方的项目管理工作涉及项目（）的全过程。",[469,470,471,472],{"key":20,"text":25,"correct":22},{"key":24,"text":29,"correct":22},{"key":28,"text":143,"correct":22},{"key":31,"text":32,"correct":26},{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":24,"analysis":33},1117407,"下列建设工程承包模式中，除（）以外都属于施工方项目管理范畴。",[477,479,481,483],{"key":20,"text":478,"correct":22},"施工总承包",{"key":24,"text":480,"correct":26},"设计、施工综合承包",{"key":28,"text":482,"correct":22},"施工总承包管理",{"key":31,"text":484,"correct":22},"施工分包",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":31,"analysis":33},1117408,"下列关于施工方进行项目管理的说法，错误的是()。",[489,491,493,494],{"key":20,"text":490,"correct":22},"“自项目开始至项目完成”指的是项目的实施期",{"key":24,"text":492,"correct":22},"费用目标对施工方而言是成本目标",{"key":28,"text":202,"correct":22},{"key":31,"text":495,"correct":26},"项目实施期管理工作的主要任务是确定项目的定义",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":28,"analysis":33},1117409,"设计和施工任务综合的承包，设计、采购和施工任务综合的承包等，它们的项目管理都属于()的项目管理。",[500,501,502,504],{"key":20,"text":422,"correct":22},{"key":24,"text":316,"correct":22},{"key":28,"text":503,"correct":26},"建设项目总承包方",{"key":31,"text":339,"correct":22},{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":28,"analysis":33},1117410,"下列关于建设工程项目管理的说法，正确的是()。",[509,511,513,515],{"key":20,"text":510,"correct":22},"项目管理的核心任务是项目策划和项目控制",{"key":24,"text":512,"correct":22},"建设工程项目的全寿命周期包括可行性研究阶段、实施阶段和使用阶段",{"key":28,"text":514,"correct":26},"业主方的进度目标是项目动用的时间目标",{"key":31,"text":516,"correct":22},"编制项目设计任务书属于决策阶段的工作",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":28,"analysis":33},1117411,"某施工企业在基础工程施工过程中，通过采用价值工程优化了施工方案，结果在不增加施工成本的前提下，缩短了工期并提高了工程质量。这体现了项目的投资目标、进度目标和质量目标之间的()关系。",[521,523,525,527],{"key":20,"text":522,"correct":22},"矛盾",{"key":24,"text":524,"correct":22},"关联",{"key":28,"text":526,"correct":26},"统一",{"key":31,"text":528,"correct":22},"协调",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":28,"analysis":33},1117412,"某酒店建设工程将设计工作分包给一家设计单位，下列（）不属于该设计单位的项目目标",[533,535,537,539],{"key":20,"text":534,"correct":22},"项目投资目标",{"key":24,"text":536,"correct":22},"设计进度目标",{"key":28,"text":538,"correct":26},"施工质量目标",{"key":31,"text":540,"correct":22},"设计成本目标",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":31,"analysis":33},1117413,"某建设项目采用施工总承包模式，R监理公司承担施工监理任务，G施工企业承担主要的 施工任务，业主将其中的二次装修发包给C装饰公司。则C装饰公司在施工中应接受（）的施工管理。",[545,546,548,550],{"key":20,"text":137,"correct":22},{"key":24,"text":547,"correct":22},"R监理公司",{"key":28,"text":549,"correct":22},"G施工企业",{"key":31,"text":551,"correct":26},"施工总承包单位",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":31,"analysis":33},1117414,"业主方的项目管理任务中（）是最重要的。",[556,558,560,562],{"key":20,"text":557,"correct":22},"投资控制",{"key":24,"text":559,"correct":22},"质量控制",{"key":28,"text":561,"correct":22},"合同管理",{"key":31,"text":563,"correct":26},"安全管理",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":20,"analysis":33},1117415,"项目决策期管理工作的主要任务是（），而项目实施期管理工作的主要任务是（）。",[568,570,572,574],{"key":20,"text":569,"correct":26},"确定项目的定义 通过管理使项目的目标得以实现",{"key":24,"text":571,"correct":22},"确定项目的定义 确定项目的启用目标",{"key":28,"text":573,"correct":22},"确定项目的总投资 通过管理使项目的目标得以实现",{"key":31,"text":575,"correct":22},"确定项目的启用时间 确定项目的竣工时间",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":31,"analysis":33},1117416,"在建设工程项目管理的内涵中，“项目策划”指的是目标控制前的一系列()。",[580,582,584,586],{"key":20,"text":581,"correct":22},"施工组织设计工作",{"key":24,"text":583,"correct":22},"计划和协调工作",{"key":28,"text":585,"correct":22},"组织和管理工作",{"key":31,"text":587,"correct":26},"筹划和准备工作",[589,592,595,598,601,604],{"id":15,"name":590,"category":7,"favorite":591},"领导干部任职前廉政法规知识测试题",92,{"id":593,"name":594,"category":7,"favorite":15},595,"建筑结构与设备",{"id":596,"name":597,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":599,"name":600,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":602,"name":603,"category":7,"favorite":8},534,"BIM工程师",{"id":605,"name":603,"category":7,"favorite":8},535]