[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":541},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,6,50,2973,[13,32,41,50,59,68,77,86,95,104,113,122,131,143,152,164,173,182,191,200,209,221,233,245,257,269,281,293,302,314,326,336,348,358,370,382,394,406,417,429,441,450,459,471,479,489,500,510,520,529],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":25,"analysis":31},1117316,1,"单选题","关于建设工程索赔成立条件的说法，正确的是（ ）。 A.导致索赔的事件必须是对方的过错，索赔才能成立 B.只要对方存在过错，不管是否造成损失，索赔都能成立 C.不按照合同规定的程序提交索赔报告，索赔不能成立 D.只要索赔事件的事实存在，在合同有效期内任何时候提出索赔都能成立",[19,22,24,27,29],{"key":20,"text":20,"correct":21},"A",false,{"key":23,"text":23,"correct":21},"B",{"key":25,"text":25,"correct":26},"C",true,{"key":28,"text":28,"correct":21},"D",{"key":30,"text":30,"correct":21},"E","",{"id":33,"libraryId":5,"type":15,"typeLabel":16,"stem":34,"options":35,"answer":28,"analysis":31},1117317,"根据《标准施工招标文件》，对于承包人向发包人的索赔请求，其索赔意向书应交由（ ）审核。 A.业主 B.设计人 C.项目经理 D.监理人",[36,37,38,39,40],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":21},{"key":28,"text":28,"correct":26},{"key":30,"text":30,"correct":21},{"id":42,"libraryId":5,"type":15,"typeLabel":16,"stem":43,"options":44,"answer":25,"analysis":31},1117318,"政府投资工程的承包人向发包人提出的索赔请求，索赔文件应该交由（ ）进行审核。 A.造价鉴定机构 B.造价咨询人 C.监理人 D.政府造价管理部门",[45,46,47,48,49],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":26},{"key":28,"text":28,"correct":21},{"key":30,"text":30,"correct":21},{"id":51,"libraryId":5,"type":15,"typeLabel":16,"stem":52,"options":53,"answer":23,"analysis":31},1117319,"根据《标准施工招标文件》中的通用条款，承包人按合同约定提交的最终结清申请单中，只限于提出（ ）。 A.在合同工程接收证书颁发前 B.在合同工作接收证书颁发后 C.在竣工付款证书接收前 D.在缺陷责任期终止证书颁发后",[54,55,56,57,58],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":26},{"key":25,"text":25,"correct":21},{"key":28,"text":28,"correct":21},{"key":30,"text":30,"correct":21},{"id":60,"libraryId":5,"type":15,"typeLabel":16,"stem":61,"options":62,"answer":25,"analysis":31},1117320,"下列工作内容中，属于反索赔工作内容的是（ ）。 A.收集准备索赔资料 B.编写法律诉讼文件 C.防止对方提出索赔 D.发出最终索赔通知",[63,64,65,66,67],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":26},{"key":28,"text":28,"correct":21},{"key":30,"text":30,"correct":21},{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":25,"analysis":31},1117321,"根据我国保险制度，关于建设工程第三者责任险的说法，正确的是（）。 A.被保险人是项目法人和承包人以外的第三人 B.赔偿范围包括承包商在工地的财产损失 C.被保险人是项目法人和承包人 D.赔偿范围包括承包商在现场从事与工作有关的职工伤亡",[72,73,74,75,76],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":26},{"key":28,"text":28,"correct":21},{"key":30,"text":30,"correct":21},{"id":78,"libraryId":5,"type":15,"typeLabel":16,"stem":79,"options":80,"answer":25,"analysis":31},1117322,"对环境调查和预测的风险属于施工合同风险的（）。 A.项目外界环境风险 B.项目组织成员风险 C.管理风险 D.经济风险",[81,82,83,84,85],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":26},{"key":28,"text":28,"correct":21},{"key":30,"text":30,"correct":21},{"id":87,"libraryId":5,"type":15,"typeLabel":16,"stem":88,"options":89,"answer":23,"analysis":31},1117323,"下列工程担保中，以保护承包人合法权益为目的的是（ ）。 A.投标担保 B.支付担保 C.履约担保 D.预付款担保",[90,91,92,93,94],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":26},{"key":25,"text":25,"correct":21},{"key":28,"text":28,"correct":21},{"key":30,"text":30,"correct":21},{"id":96,"libraryId":5,"type":15,"typeLabel":16,"stem":97,"options":98,"answer":20,"analysis":31},1117324,"建设工程施工预付款担保的主要形式是（ ）。 A.银行保函 B.支票 C.现金 D.汇票",[99,100,101,102,103],{"key":20,"text":20,"correct":26},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":21},{"key":28,"text":28,"correct":21},{"key":30,"text":30,"correct":21},{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":25,"analysis":31},1117325,"债务人不转移对拥有财产的占有，将该财产作为债权的担保，债务人不履行债务时，债权人有权依法将该财产折价或者拍卖，变卖该财产的价款中优先受偿，这种担保方式是（）担保。 A.保证 B.质押 C.抵押 D.留置",[108,109,110,111,112],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":26},{"key":28,"text":28,"correct":21},{"key":30,"text":30,"correct":21},{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":28,"analysis":31},1117326,"建设工程履约担保的有效期始于（）之日。 A.合同签订 B.合同生效 C.承包人收到工程预付款 D.工程开工",[117,118,119,120,121],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":21},{"key":28,"text":28,"correct":26},{"key":30,"text":30,"correct":21},{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":28,"analysis":31},1117327,"某建设工程项目中，承包人按合同约定，由担保公司向发包人提供了履约担保书。在合同履行过程中，如果承包人违约，开出担保书的担保公司（ ）。 A.必须向发包人支付履约担保书规定的保证金 B.必须用履约担保书规定的保证金去完成施工任务 C.应完成施工任务，并向发包人支付履约担保书规定的保证金 D.用履约担保书规定的担保金去完成施工任务或向发包人支付该项保证金",[126,127,128,129,130],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":21},{"key":28,"text":28,"correct":26},{"key":30,"text":30,"correct":21},{"id":132,"libraryId":5,"type":15,"typeLabel":16,"stem":133,"options":134,"answer":28,"analysis":31},1117328,"下列担保中，担保金额在担保有效期内逐步减少的是( )。",[135,137,139,141],{"key":20,"text":136,"correct":21},"投标担保",{"key":23,"text":138,"correct":21},"履约担保",{"key":25,"text":140,"correct":21},"支付担保",{"key":28,"text":142,"correct":26},"预付款担保",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":23,"analysis":31},1117329,"在一份保险合同中，保险人承担或给付保险金责任的最高额度是该份保险合同的（ ）。 A.标的价值 B.保险金额 C.保险费 D.实际赔付额",[147,148,149,150,151],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":26},{"key":25,"text":25,"correct":21},{"key":28,"text":28,"correct":21},{"key":30,"text":30,"correct":21},{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":28,"analysis":31},1117330,"根据《招标投标法的实施条例》，对某3000 万元投资概算的工程项目进行招标时，施工投标保证金额度符合规定的是（ ）万元人民币。",[156,158,160,162],{"key":20,"text":157,"correct":21},"70",{"key":23,"text":159,"correct":21},"100",{"key":25,"text":161,"correct":21},"120",{"key":28,"text":163,"correct":26},"60",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":23,"analysis":31},1117331,"下列工程施工技术资料中，不属于施工记录文件的是（ ）。 A.工程定位测量检查记录 B.沉降观测记录 C.施工检查记录 D.交接检查记录",[168,169,170,171,172],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":26},{"key":25,"text":25,"correct":21},{"key":28,"text":28,"correct":21},{"key":30,"text":30,"correct":21},{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":20,"analysis":31},1117332,"下列关于施工文件立卷的说法，正确的是（ ）。 A.竣工验收文件按单位工程、专业组卷 B.卷内备考表排列在卷内文件的首页之前 C.保管期限为永久的工程档案，其保存期限等于该工程的使用寿命 D.同一案卷内有不同密级的文件，应以低密级为本卷密级",[177,178,179,180,181],{"key":20,"text":20,"correct":26},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":21},{"key":28,"text":28,"correct":21},{"key":30,"text":30,"correct":21},{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":23,"analysis":31},1117333,"下列工程管理信息资源中，属于管理类工程信息的是（）。 A.与建筑业有关的专家信息 B.与合同有关的信息 C.建设物资的市场信息 D.与施工有关的技术信息",[186,187,188,189,190],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":26},{"key":25,"text":25,"correct":21},{"key":28,"text":28,"correct":21},{"key":30,"text":30,"correct":21},{"id":192,"libraryId":5,"type":15,"typeLabel":16,"stem":193,"options":194,"answer":20,"analysis":31},1117334,"施工方信息管理手段的核心是（ ）。 A.实现工程管理信息化 B.编制信息管理手册 C.建立基于互联网的信息处理平台 D.实现办公自动化",[195,196,197,198,199],{"key":20,"text":20,"correct":26},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":21},{"key":28,"text":28,"correct":21},{"key":30,"text":30,"correct":21},{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":25,"analysis":31},1117335,"工程项目信息管理的核心指导文件是（ ）。 A.信息编码体系 B.信息分类标准 C.信息管理手册 D.信息处理方法",[204,205,206,207,208],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":26},{"key":28,"text":28,"correct":21},{"key":30,"text":30,"correct":21},{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":28,"analysis":31},1117336,"在工程项目管理的内涵中，项目策划指的是目标控制前的一系列（）。",[213,215,217,219],{"key":20,"text":214,"correct":21},"施工组织设计工作",{"key":23,"text":216,"correct":21},"计划和协调工作",{"key":25,"text":218,"correct":21},"组织和管理工作",{"key":28,"text":220,"correct":26},"筹划和准备工作",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":25,"analysis":31},1117337,"项目的投资目标、进度目标和质量目标之间的关系是()的关系。",[225,227,229,231],{"key":20,"text":226,"correct":21},"对立",{"key":23,"text":228,"correct":21},"统一",{"key":25,"text":230,"correct":26},"既对立又统一",{"key":28,"text":232,"correct":21},"既不对立也不统一",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":25,"analysis":31},1117338,"设计方的项目管理工作主要在建设工程项目的（）进行。",[237,239,241,243],{"key":20,"text":238,"correct":21},"设计准备阶段",{"key":23,"text":240,"correct":21},"实施阶段",{"key":25,"text":242,"correct":26},"设计阶段",{"key":28,"text":244,"correct":21},"施工阶段",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":20,"analysis":31},1117339,"建设工程项目总承包在多数条件下采用（）。",[249,251,253,255],{"key":20,"text":250,"correct":26},"变动总价合同",{"key":23,"text":252,"correct":21},"固定单价合同",{"key":25,"text":254,"correct":21},"固定总价合同",{"key":28,"text":256,"correct":21},"变动单价合同",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":25,"analysis":31},1117340,"某建设工程项目采取施工总承包管理模式，其中的某些工程由建设单位发包给乙单位。在施工中，乙单位应该直接接受()的工作指令。",[261,263,265,267],{"key":20,"text":262,"correct":21},"建设单位",{"key":23,"text":264,"correct":21},"设计单位",{"key":25,"text":266,"correct":26},"施工总承包管理企业",{"key":28,"text":268,"correct":21},"施工承包企业",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":28,"analysis":31},1117341,"某建设项目采用施工总承包管理模式，R监理公司承担施工监理任务，G施工企业承担主要的施工任务，业主将其中的二次装修发包给C装饰公司，则C装饰公司在施工中应接受()的施工管理。",[273,275,277,279],{"key":20,"text":274,"correct":21},"业主",{"key":23,"text":276,"correct":21},"R监理公司",{"key":25,"text":278,"correct":21},"G施工企业",{"key":28,"text":280,"correct":26},"施工总承包管理方",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":25,"analysis":31},1117342,"甲单位拟新建一电教中心，经设计招标，由乙设计院承担该项目设计任务。下列目标中，不属于乙设计院项目管理目标的是（）。",[285,287,289,291],{"key":20,"text":286,"correct":21},"项目投资目标",{"key":23,"text":288,"correct":21},"设计进度目标",{"key":25,"text":290,"correct":26},"施工质量目标",{"key":28,"text":292,"correct":21},"设计成本目标",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":28,"analysis":31},1117343,"建设工程项目管理内涵中，“项目策划指的是”目标控制前的一系列（）。",[297,299,300,301],{"key":20,"text":298,"correct":21},"规划和决策工作",{"key":23,"text":216,"correct":21},{"key":25,"text":218,"correct":21},{"key":28,"text":220,"correct":26},{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":25,"analysis":31},1117344,"某一年产50万t乙烯的石油冶炼项目通过公开招标的方式确定甲工程总承包公司负责完成该项目的设计、采购和施工等任务，该项目所采用的工程项目承包模式在国际上通常被称作()。",[306,308,310,312],{"key":20,"text":307,"correct":21},"D+B承包模式",{"key":23,"text":309,"correct":21},"D-B-B承包模式",{"key":25,"text":311,"correct":26},"EPC承包模式",{"key":28,"text":313,"correct":21},"BOT承包模式",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":25,"analysis":31},1117345,"供货方的项目管理工作主要在()阶段进行。",[318,320,322,324],{"key":20,"text":319,"correct":21},"决策",{"key":23,"text":321,"correct":21},"设计",{"key":25,"text":323,"correct":26},"施工",{"key":28,"text":325,"correct":21},"保修",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":28,"analysis":31},1117346,"某建设工程项目采用施工总承包管理模式，业主将其中的基础施工分包给某专业分包商，则该分包商应接受()的施工管理。",[330,331,333,335],{"key":20,"text":274,"correct":21},{"key":23,"text":332,"correct":21},"监理方",{"key":25,"text":334,"correct":21},"施工企业",{"key":28,"text":280,"correct":26},{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":25,"analysis":31},1117347,"设计方其项目管理主要服务于项目的()和设计方本身的利益。",[340,342,344,346],{"key":20,"text":341,"correct":21},"业主的利益",{"key":23,"text":343,"correct":21},"施工单位的利益",{"key":25,"text":345,"correct":26},"整体利益",{"key":28,"text":347,"correct":21},"总承包单位的利益",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":23,"analysis":31},1117348,"作为工程项目建设的参与方之一,供货方的项目管理工作主要是在()进行。",[352,353,354,356],{"key":20,"text":242,"correct":21},{"key":23,"text":244,"correct":26},{"key":25,"text":355,"correct":21},"保修阶段",{"key":28,"text":357,"correct":21},"动用前准备阶段",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":28,"analysis":31},1117349,"某学校拟新建一科教综合楼，经设计招标，由甲设计公司承担该项目设计任务。下列不属于该设计院项目管理目标的是()。",[362,364,366,368],{"key":20,"text":363,"correct":21},"项目的投资目标",{"key":23,"text":365,"correct":21},"设计的成本目标",{"key":25,"text":367,"correct":21},"设计的进度目标",{"key":28,"text":369,"correct":26},"项目的进度目标",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":31},1117350,"供货方项目管理的目标主要包括()。",[374,376,378,380],{"key":20,"text":375,"correct":26},"成本目标",{"key":23,"text":377,"correct":21},"设计目标",{"key":25,"text":379,"correct":21},"保修目标",{"key":28,"text":381,"correct":21},"设计准备目标",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":25,"analysis":31},1117352,"建设项目工程总承包的主要意义是（）。",[386,388,390,392],{"key":20,"text":387,"correct":21},"总价包干",{"key":23,"text":389,"correct":21},"交钥匙",{"key":25,"text":391,"correct":26},"为项目建设增值",{"key":28,"text":393,"correct":21},"设计与施工的责任明确",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":25,"analysis":31},1117353,"对业主方项目管理的目标而言，进度目标是指项目的()。",[398,400,402,404],{"key":20,"text":399,"correct":21},"立项时间目标",{"key":23,"text":401,"correct":21},"竣工时间目标",{"key":25,"text":403,"correct":26},"项目动用的时间目标",{"key":28,"text":405,"correct":21},"运营时间目标",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":23,"analysis":31},1117354,"建设项目工程总承包的主要意义并不在于总价包干，也不是交钥匙，其核心是通过设计与施工过程的组织集成，促进设计与施工的紧密结合，以达到为项目建设()的目的。",[410,412,414,415],{"key":20,"text":411,"correct":21},"管理",{"key":23,"text":413,"correct":26},"增值",{"key":25,"text":387,"correct":21},{"key":28,"text":416,"correct":21},"服务",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":28,"analysis":31},1117355,"建设工程项目管理，是指自项目开始至项目完成，通过项目策划和项目控制，实现项目的费用目标、进度目标和质量目标。对此，下列理解中正确的是（）。",[421,423,425,427],{"key":20,"text":422,"correct":21},"自项目开始至项目完成的是项目的寿命期",{"key":23,"text":424,"correct":21},"项目策划的主要任务是项目定义",{"key":25,"text":426,"correct":21},"费用目标对业主而言就是成本目标",{"key":28,"text":428,"correct":26},"项目实施期管理的主要任务就是通过管理使项目目标得以实现",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":20,"analysis":31},1117356,"( )的项目管理是管理的核心。",[433,435,437,439],{"key":20,"text":434,"correct":26},"业主方",{"key":23,"text":436,"correct":21},"设计方",{"key":25,"text":438,"correct":21},"施工方",{"key":28,"text":440,"correct":21},"供货方",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":28,"analysis":31},1117357,"材料和设备供应方的项目管理都属于( )的项目管理。",[445,446,447,449],{"key":20,"text":438,"correct":21},{"key":23,"text":434,"correct":21},{"key":25,"text":448,"correct":21},"建设项目工程总承包方",{"key":28,"text":440,"correct":26},{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":23,"analysis":31},1117358,"编制项目建议书是项目( )阶段的工作。",[454,455,456,458],{"key":20,"text":321,"correct":21},{"key":23,"text":319,"correct":26},{"key":25,"text":457,"correct":21},"设计准备",{"key":28,"text":323,"correct":21},{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":20,"analysis":31},1117359,"建设工程项目决策阶段包含的内容是（）。",[463,465,467,469],{"key":20,"text":464,"correct":26},"编制项目建议书",{"key":23,"text":466,"correct":21},"编制设计任务书",{"key":25,"text":468,"correct":21},"施工图设计",{"key":28,"text":470,"correct":21},"确定项目总投资",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":20,"analysis":31},1117360,"建设工程项目生产过程的总集成者是()。",[475,476,477,478],{"key":20,"text":434,"correct":26},{"key":23,"text":440,"correct":21},{"key":25,"text":438,"correct":21},{"key":28,"text":436,"correct":21},{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":23,"analysis":31},1117361,"可行性研究报告编制工作所处的阶段属于建设工程全寿命周期的()。",[483,485,487,488],{"key":20,"text":484,"correct":21},"使用阶段",{"key":23,"text":486,"correct":26},"决策阶段",{"key":25,"text":242,"correct":21},{"key":28,"text":240,"correct":21},{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":25,"analysis":31},1117362,"“费用目标”对业主而言是( )。",[493,494,496,498],{"key":20,"text":375,"correct":21},{"key":23,"text":495,"correct":21},"预算目标",{"key":25,"text":497,"correct":26},"投资目标",{"key":28,"text":499,"correct":21},"收益目标",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":28,"analysis":31},1117363,"对于建设工程项目而言，虽然有代表不同利益方的项目管理，但核心是（）方的项目管理。",[504,505,507,509],{"key":20,"text":321,"correct":21},{"key":23,"text":506,"correct":21},"总承包",{"key":25,"text":508,"correct":21},"监理",{"key":28,"text":274,"correct":26},{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":28,"analysis":31},1117364,"下列选项中，属于项目设计前准备阶段主要工作的是（）。",[514,515,517,519],{"key":20,"text":464,"correct":21},{"key":23,"text":516,"correct":21},"编制项目可行性研究报告",{"key":25,"text":518,"correct":21},"编制项目总成本计划",{"key":28,"text":466,"correct":26},{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":20,"analysis":31},1117365,"编制可行性研究报告属于建设工程项目全寿命周期( )阶段的工作。",[524,525,527,528],{"key":20,"text":319,"correct":26},{"key":23,"text":526,"correct":21},"实施",{"key":25,"text":457,"correct":21},{"key":28,"text":323,"correct":21},{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":20,"analysis":31},1117366,"编制项目建议书属于建设工程项目全寿命周期( )。",[533,535,537,539],{"key":20,"text":534,"correct":26},"决策阶段的工作",{"key":23,"text":536,"correct":21},"实施阶段的工作",{"key":25,"text":538,"correct":21},"设计准备阶段的工作",{"key":28,"text":540,"correct":21},"施工阶段的工作",[542,545,548,551,554,557],{"id":15,"name":543,"category":7,"favorite":544},"领导干部任职前廉政法规知识测试题",92,{"id":546,"name":547,"category":7,"favorite":15},595,"建筑结构与设备",{"id":549,"name":550,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":552,"name":553,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":555,"name":556,"category":7,"favorite":8},534,"BIM工程师",{"id":558,"name":556,"category":7,"favorite":8},535]