[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-59":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":565},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,59,50,2973,[13,34,46,58,70,81,89,101,110,119,131,140,148,160,171,179,191,199,211,221,233,245,257,268,280,292,304,316,324,336,348,360,372,384,392,403,412,421,432,440,450,458,470,482,494,506,518,530,541,553],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1119986,1,"单选题","承包人应根据( )提交合格的竣工图。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","工程性质的要求",false,{"key":24,"text":25,"correct":26},"B","施工合同约定",true,{"key":28,"text":29,"correct":22},"C","监理单位的要求",{"key":31,"text":32,"correct":22},"D","设计单位的要求","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1119987,"工程施工质量验收资料是建设工程施工全过程中按照国家现行的工程质量检验标准，对施工项目进行单位工程、分部工程、分项工程及检验批的划分，再由检验批、分项工程、分部工程、单位工程逐级对工程质量做出()的工程质量验收资料。",[38,40,42,44],{"key":20,"text":39,"correct":22},"分级评定",{"key":24,"text":41,"correct":26},"综合评定",{"key":28,"text":43,"correct":22},"检验定级",{"key":31,"text":45,"correct":22},"验收评定",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1119988,"检验批质量验收应由()组织项目专业质量检查员等进行验收并签认。",[50,52,54,56],{"key":20,"text":51,"correct":22},"检验人员",{"key":24,"text":53,"correct":22},"建设单位负责人",{"key":28,"text":55,"correct":22},"项目经理",{"key":31,"text":57,"correct":26},"监理工程师",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1119989,"在工程质量验收合格标准中，对于主要功能项目的抽查结果应符合相关专业质量验收规范的规定属于（）验收的内容。",[62,64,66,68],{"key":20,"text":63,"correct":22},"分部工程",{"key":24,"text":65,"correct":22},"检验批",{"key":28,"text":67,"correct":26},"单位工程",{"key":31,"text":69,"correct":22},"分项工程",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1119990,"分项工程质量应由()组织项目专业技术负责人等进行验收。",[74,75,77,79],{"key":20,"text":55,"correct":22},{"key":24,"text":76,"correct":22},"总监理工程师",{"key":28,"text":78,"correct":26},"专业监理工程师",{"key":31,"text":80,"correct":22},"监理员",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":31,"analysis":33},1119991,"某栋10层住宅楼的钢筋工程可以作为一个()进行质量控制。",[85,86,87,88],{"key":20,"text":63,"correct":22},{"key":24,"text":67,"correct":22},{"key":28,"text":65,"correct":22},{"key":31,"text":69,"correct":26},{"id":90,"libraryId":5,"type":15,"typeLabel":16,"stem":91,"options":92,"answer":24,"analysis":33},1119992,"工程施工质量验收资料不包括（）。",[93,95,97,99],{"key":20,"text":94,"correct":22},"施工现场质量管理检查记录",{"key":24,"text":96,"correct":26},"隐蔽工程检查记录",{"key":28,"text":98,"correct":22},"分项工程质量验收记录",{"key":31,"text":100,"correct":22},"检验批质量验收记录",{"id":102,"libraryId":5,"type":15,"typeLabel":16,"stem":103,"options":104,"answer":24,"analysis":33},1119993,"工程施工质量验收资料，是由检验批、分项工程、分部工程、单位工程等逐级对工程质量做出（）的工程质量验收资料。",[105,107,108,109],{"key":20,"text":106,"correct":22},"分项评定",{"key":24,"text":41,"correct":26},{"key":28,"text":43,"correct":22},{"key":31,"text":45,"correct":22},{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":24,"analysis":33},1119994,"竣工图是真实、准确、完整反映和记录各种地下和地上建筑物、构筑物等详细情况的技术文件，竣工图应由承包人根据()提交。",[114,115,116,117],{"key":20,"text":32,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":22},{"key":31,"text":118,"correct":22},"竣工验收的要求",{"id":120,"libraryId":5,"type":15,"typeLabel":16,"stem":121,"options":122,"answer":28,"analysis":33},1119995,"案卷不宜过厚，一般不超过( )mm。",[123,125,127,129],{"key":20,"text":124,"correct":22},"20",{"key":24,"text":126,"correct":22},"30",{"key":28,"text":128,"correct":26},"40",{"key":31,"text":130,"correct":22},"50",{"id":132,"libraryId":5,"type":15,"typeLabel":16,"stem":133,"options":134,"answer":24,"analysis":33},1119996,"在施工文件的立卷中，案卷不宜过厚，一般不超过()mm。",[135,136,137,138],{"key":20,"text":124,"correct":22},{"key":24,"text":128,"correct":26},{"key":28,"text":130,"correct":22},{"key":31,"text":139,"correct":22},"60",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":20,"analysis":33},1119998,"一个建设工程由多个单位工程组成时，工程文件按()立卷。",[144,145,146,147],{"key":20,"text":67,"correct":26},{"key":24,"text":63,"correct":22},{"key":28,"text":69,"correct":22},{"key":31,"text":65,"correct":22},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":31,"analysis":33},1119999,"卷内备考表排列在()。",[152,154,156,158],{"key":20,"text":153,"correct":22},"卷内目录之前",{"key":24,"text":155,"correct":22},"卷内文件的首页之后",{"key":28,"text":157,"correct":22},"卷内目录之后",{"key":31,"text":159,"correct":26},"卷内文件的尾页之后",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":31,"analysis":33},1120000,"案卷封面标注的保管期限分为永久、长期、短期三种期限。永久是指工程档案需永久保存。长期是指工程档案的保存期限等于该工程的使用寿命。短期是指工程档案保存( )年以下。",[164,166,168,170],{"key":20,"text":165,"correct":22},"5",{"key":24,"text":167,"correct":22},"10",{"key":28,"text":169,"correct":22},"15",{"key":31,"text":124,"correct":26},{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":31,"analysis":33},1120001,"案卷封面标注的保管期限分为永久、长期、短期三种期限，其中短期是指工程档案保存( )年以下。",[175,176,177,178],{"key":20,"text":165,"correct":22},{"key":24,"text":167,"correct":22},{"key":28,"text":169,"correct":22},{"key":31,"text":124,"correct":26},{"id":180,"libraryId":5,"type":15,"typeLabel":16,"stem":181,"options":182,"answer":31,"analysis":33},1120002,"工程档案保管期限中的长期期限是指（）",[183,185,187,189],{"key":20,"text":184,"correct":22},"20年以上",{"key":24,"text":186,"correct":22},"10年以上20年以下",{"key":28,"text":188,"correct":22},"50年以下",{"key":31,"text":190,"correct":26},"工程寿命周期",{"id":192,"libraryId":5,"type":15,"typeLabel":16,"stem":193,"options":194,"answer":31,"analysis":33},1120003,"工程档案案巻封面标注的保管期限分为永久、长期、短期三种期限。短期是指工程档案保存()年以下。",[195,196,197,198],{"key":20,"text":165,"correct":22},{"key":24,"text":167,"correct":22},{"key":28,"text":169,"correct":22},{"key":31,"text":124,"correct":26},{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":24,"analysis":33},1120004,"下列关于归档施工文件的说法，不符合归档文件质量要求的是()。",[203,205,207,209],{"key":20,"text":204,"correct":22},"工程文件的内容及其深度必须符合国家有关技术规范、标准和规程",{"key":24,"text":206,"correct":26},"归档文件可以为复印件，但必须加盖单位印章",{"key":28,"text":208,"correct":22},"竣工图可以利用施工图改绘",{"key":31,"text":210,"correct":22},"工程文件使用碳素墨水书写",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":28,"analysis":33},1120005,"关于归档施工文件质量要求的说法中，错误的是()。",[215,216,218,219],{"key":20,"text":210,"correct":22},{"key":24,"text":217,"correct":22},"竣工图可以利用施工图改绘，但必须标明变更修改依据",{"key":28,"text":206,"correct":26},{"key":31,"text":220,"correct":22},"所有竣工图均应加盖竣工图章",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":24,"analysis":33},1120006,"施工单位应当在工程竣工验收前，将形成的有关工程档案向()归档。",[225,227,229,231],{"key":20,"text":226,"correct":22},"监理单位",{"key":24,"text":228,"correct":26},"建设单位",{"key":28,"text":230,"correct":22},"城建档案管理机构",{"key":31,"text":232,"correct":22},"质量监督机构",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":20,"analysis":33},1120007,"下列关于竣工图编制要求的表述中，错误的是（）。",[237,239,241,243],{"key":20,"text":238,"correct":26},"涉及图面变更面积超过25％的，应重新绘制竣工图",{"key":24,"text":240,"correct":22},"应完整、准确、清晰、规范，修改到位，真实反映项目竣工验收时的实际情况",{"key":28,"text":242,"correct":22},"如果按施工图施工没有变动的，由竣工图编制单位在施工图上加盖并签署竣工图章",{"key":31,"text":244,"correct":22},"一般性图纸变更，可在原图上更改，加盖并签署竣工图章",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":31,"analysis":33},1120008,"利用施工图改绘竣工图，必须标明变更修改依据；凡施工图结构、工艺、平面布置等有重大改变，或变更部分超过图面()的，应当重新绘制竣工图。",[249,251,253,255],{"key":20,"text":250,"correct":22},"1\u002F2",{"key":24,"text":252,"correct":22},"1\u002F4",{"key":28,"text":254,"correct":22},"2\u002F3",{"key":31,"text":256,"correct":26},"1\u002F3",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":28,"analysis":33},1120009,"施工单位在收齐工程文件整理立卷后，建设单位、监理单位应根据()的要求对档案文件完整、准确、系统情况和案卷质量进行审查。审查合格后向建设单位移交。",[261,263,265,266],{"key":20,"text":262,"correct":22},"建设主管部门",{"key":24,"text":264,"correct":22},"合同文件",{"key":28,"text":230,"correct":26},{"key":31,"text":267,"correct":22},"法律规范",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":28,"analysis":33},1120010,"按照归档文件的质量要求，竣工图章尺寸为( )。",[272,274,276,278],{"key":20,"text":273,"correct":22},"20mm×50mm",{"key":24,"text":275,"correct":22},"40mm×70mm",{"key":28,"text":277,"correct":26},"50mm×80mm",{"key":31,"text":279,"correct":22},"60mm×90mm",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":28,"analysis":33},1120011,"建设工程项目的实施需要人力资源和物质资源，应认识到()资源也是项目实施的重要资源之一。",[284,286,288,290],{"key":20,"text":285,"correct":22},"成本",{"key":24,"text":287,"correct":22},"质量",{"key":28,"text":289,"correct":26},"信息",{"key":31,"text":291,"correct":22},"合同",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":24,"analysis":33},1120012,"根据《建设工程文件归档整理规范》的要求，同一案卷内有不同保管期限的文件，该案卷保管期限应()。",[296,298,300,302],{"key":20,"text":297,"correct":22},"从短",{"key":24,"text":299,"correct":26},"从长",{"key":28,"text":301,"correct":22},"固定为5年",{"key":31,"text":303,"correct":22},"固定为20年",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":24,"analysis":33},1120013,"施工文件档案管理中，某一案卷内包含机密和秘密两套文件，则该案卷的密级应为（）",[308,310,312,314],{"key":20,"text":309,"correct":22},"绝密",{"key":24,"text":311,"correct":26},"机密",{"key":28,"text":313,"correct":22},"秘密",{"key":31,"text":315,"correct":22},"应分为机密和秘密两套案卷",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":24,"analysis":33},1120014,"施工単位应当在工程竣工验收前,将形成的有关工程档案向()归档。",[320,321,322,323],{"key":20,"text":226,"correct":22},{"key":24,"text":228,"correct":26},{"key":28,"text":230,"correct":22},{"key":31,"text":232,"correct":22},{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":20,"analysis":33},1120015,"施工文件立卷时，案卷卷盒的外表尺寸为()。",[328,330,332,334],{"key":20,"text":329,"correct":26},"310mm×220mm",{"key":24,"text":331,"correct":22},"310mm×200mm",{"key":28,"text":333,"correct":22},"320mm×220mm",{"key":31,"text":335,"correct":22},"320mm×200mm",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":28,"analysis":33},1120016,"应重新绘制竣工图的情况是，涉及结构形式、工艺、平面布置、项目等重大改变及图面变更面积超过()。",[340,342,344,346],{"key":20,"text":341,"correct":22},"20%",{"key":24,"text":343,"correct":22},"30%",{"key":28,"text":345,"correct":26},"35%",{"key":31,"text":347,"correct":22},"40%",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":31,"analysis":33},1120017,"施工文件立卷时，卷内目录式样宜符合《建设工程文件归档整理规范》附录B的要求。责任者应填写文件的()单位和个人。",[352,354,356,358],{"key":20,"text":353,"correct":22},"编制审查",{"key":24,"text":355,"correct":22},"档案管理",{"key":28,"text":357,"correct":22},"归档整理",{"key":31,"text":359,"correct":26},"直接形成",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":20,"analysis":33},1120018,"图样按()排列，同专业图样按图号顺序排列。",[364,366,368,370],{"key":20,"text":365,"correct":26},"专业",{"key":24,"text":367,"correct":22},"阶段",{"key":28,"text":369,"correct":22},"系统",{"key":31,"text":371,"correct":22},"工序",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":20,"analysis":33},1120019,"关于施工文件立卷的表述，错误的是()。",[376,378,380,382],{"key":20,"text":377,"correct":26},"卷内备考表排列在卷内文件的尾页之前",{"key":24,"text":379,"correct":22},"卷内图纸应按专业排列，同专业图纸按图号顺序排列",{"key":28,"text":381,"correct":22},"案卷内不应有重份文件，不同载体的文件应分别组卷",{"key":31,"text":383,"correct":22},"一个建设工程由多个单位工程组成时，工程文件按单位工程立卷",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":28,"analysis":33},1120020,"涉及结构形式、工艺、平面布置、项目等重大改变及图面变更面积超过()，应重新绘制竣工图。",[388,389,390,391],{"key":20,"text":341,"correct":22},{"key":24,"text":343,"correct":22},{"key":28,"text":345,"correct":26},{"key":31,"text":347,"correct":22},{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":24,"analysis":33},1120021,"按照我国现行规定，对于不同工程或施工单位之间的工程交接，当在总包管理范围内的分包单位之间移交时，见证单位应为( )。",[396,397,399,401],{"key":20,"text":226,"correct":22},{"key":24,"text":398,"correct":26},"总包单位",{"key":28,"text":400,"correct":22},"设计单位",{"key":31,"text":402,"correct":22},"施工单位",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":28,"analysis":33},1120022,"检验批质量验收应由（）组织有关人员进行验收并签认。",[407,409,410,411],{"key":20,"text":408,"correct":22},"施工单位项目专业质量负责人",{"key":24,"text":53,"correct":22},{"key":28,"text":57,"correct":26},{"key":31,"text":76,"correct":22},{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":20,"analysis":33},1120023,"各项新建、扩建、改建、技术改造、技术引进项目竣工图的负责编制人应是( )。",[416,417,418,420],{"key":20,"text":402,"correct":26},{"key":24,"text":400,"correct":22},{"key":28,"text":419,"correct":22},"资询单位",{"key":31,"text":228,"correct":22},{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":24,"analysis":33},1120024,"某房建工程的给排水工程由项目专业技术负责人组织验收后，应由（）签署验收意见及验收结构，并签字盖章",[425,427,428,430],{"key":20,"text":426,"correct":22},"施工企业施工员",{"key":24,"text":78,"correct":26},{"key":28,"text":429,"correct":22},"项目专业技术负责人",{"key":31,"text":431,"correct":22},"建设单位参加验收的人员",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":20,"analysis":33},1120026,"施工单位应在完成施工测量方案、红线桩校核成果、水准点引测成果及施工过程的各种测量记录后，填写《施工测量放线报验表》报请()审核。",[436,437,438,439],{"key":20,"text":226,"correct":26},{"key":24,"text":228,"correct":22},{"key":28,"text":400,"correct":22},{"key":31,"text":402,"correct":22},{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":28,"analysis":33},1120028,"通常情况下，工程洽商的提出者是（）。",[444,445,447,448],{"key":20,"text":400,"correct":22},{"key":24,"text":446,"correct":22},"业主",{"key":28,"text":402,"correct":26},{"key":31,"text":449,"correct":22},"咨询单位",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":31,"analysis":33},1120030,"在工程施工技术管理资料中，工程洽商是施工过程中一种协调业主与施工方、施工方和设计行为的记录。工程洽商分为技术洽商和经济洽商两种，通常情况下由()提出。",[454,455,456,457],{"key":20,"text":446,"correct":22},{"key":24,"text":400,"correct":22},{"key":28,"text":226,"correct":22},{"key":31,"text":402,"correct":26},{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":24,"analysis":33},1120031,"下面关于施工文档资料的说法，错误的是（）。",[462,464,466,468],{"key":20,"text":463,"correct":22},"施工文档资料是城建档案的重要组成部分",{"key":24,"text":465,"correct":26},"施工文档资料包括全部工程档案的内容",{"key":28,"text":467,"correct":22},"施工文档资料是建设工程进行竣工验收的必要条件",{"key":31,"text":469,"correct":22},"施工文档资料是全面反映建设工程质量状况的重要文档资料",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":31,"analysis":33},1120033,"建设工程项目利用信息技术手段进行信息管理，其核心手段是()。",[474,476,478,480],{"key":20,"text":475,"correct":22},"数据库技术",{"key":24,"text":477,"correct":22},"数据库的不断更新",{"key":28,"text":479,"correct":22},"信息处理的工作平台",{"key":31,"text":481,"correct":26},"基于互联网的信息处理平台",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":31,"analysis":33},1120035,"施工文档资料是城建档案的重要组成部分，是建设工程进行竣工验收和竣工核定的必要条件，是全面反映建设工程（）的重要文档资料。",[486,488,490,492],{"key":20,"text":487,"correct":22},"成本构成",{"key":24,"text":489,"correct":22},"进度状况",{"key":28,"text":491,"correct":22},"安全状况",{"key":31,"text":493,"correct":26},"质量状况",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":31,"analysis":33},1120037,"住房和城乡建设部确认建筑信息化的最佳解决方案是以()技术为核心并做为中国未来建筑信息化的发展方向",[498,500,502,504],{"key":20,"text":499,"correct":22},"项目信息门户(PIP)",{"key":24,"text":501,"correct":22},"项目管理信息系统(PMIS)",{"key":28,"text":503,"correct":22},"管理信息系统(MIS)",{"key":31,"text":505,"correct":26},"建筑信息模型(BIM)",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":20,"analysis":33},1120039,"项目管理班子中各个工作部门的管理工作都与()有关。",[510,512,514,516],{"key":20,"text":511,"correct":26},"信息处理",{"key":24,"text":513,"correct":22},"施工预算",{"key":28,"text":515,"correct":22},"工程网络计划",{"key":31,"text":517,"correct":22},"信息编码",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":20,"analysis":33},1120041,"国际工程管理领域中，信息管理的核心指导文件是（）",[522,524,526,528],{"key":20,"text":523,"correct":26},"信息管理手册",{"key":24,"text":525,"correct":22},"技术标准",{"key":28,"text":527,"correct":22},"信息编码体系",{"key":31,"text":529,"correct":22},"工程档案管理制度",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":24,"analysis":33},1120043,"为了充分利用和发挥信息资源的价值、提高信息管理效率以及实现有序的和科学的信息管理，各方都应该编制各自的（）。",[534,536,537,539],{"key":20,"text":535,"correct":22},"项目管理规划",{"key":24,"text":523,"correct":26},{"key":28,"text":538,"correct":22},"系统开发计划",{"key":31,"text":540,"correct":22},"信息编码表",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":31,"analysis":33},1120045,"公共信息包括法律法规和部门规章信息、市场信息以及自然条件信息。以下属于市场信息的是()。",[545,547,549,551],{"key":20,"text":546,"correct":22},"交通运输条件",{"key":24,"text":548,"correct":22},"环境保护要求",{"key":28,"text":550,"correct":22},"年最大风力",{"key":31,"text":552,"correct":26},"材料价格表",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":31,"analysis":33},1120047,"建设工程项目的信息管理的目的旨在通过有效的项目信息传输的（）为项目建设的增值服务。",[557,559,561,563],{"key":20,"text":558,"correct":22},"识别与交流",{"key":24,"text":560,"correct":22},"沟通与协调",{"key":28,"text":562,"correct":22},"融汇与贯通",{"key":31,"text":564,"correct":26},"组织和控制",[566,569,572,575,578,581],{"id":15,"name":567,"category":7,"favorite":568},"领导干部任职前廉政法规知识测试题",92,{"id":570,"name":571,"category":7,"favorite":15},595,"建筑结构与设备",{"id":573,"name":574,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":576,"name":577,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":579,"name":580,"category":7,"favorite":8},534,"BIM工程师",{"id":582,"name":580,"category":7,"favorite":8},535]