[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-58":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":573},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,58,50,2973,[13,34,46,58,70,80,92,104,116,128,138,148,160,172,181,193,205,217,229,238,250,262,274,285,297,309,317,328,340,352,362,373,385,397,409,420,429,439,448,457,469,478,490,501,509,518,528,538,550,562],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1119936,1,"单选题","根据《标准施工招标文件》规定，建设工程经验收合格，则实际竣工日期为()。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","组织工程竣工验收的日期",false,{"key":24,"text":25,"correct":22},"B","承包人实际完成工程的日期",{"key":27,"text":28,"correct":29},"C","承包人提交竣工验收申请报告的日期",true,{"key":31,"text":32,"correct":22},"D","工程竣工验收后，发包人给予认可意见的日期","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1119937,"根据《建设工程施工合同（示范文本）》（GF-19990201）规定，发包人应在监理人出具最终结清证书后的()d内，将应支付款支付给承包人。",[38,40,42,44],{"key":20,"text":39,"correct":22},"7",{"key":24,"text":41,"correct":29},"14",{"key":27,"text":43,"correct":22},"21",{"key":31,"text":45,"correct":22},"28",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1119938,"某工程项目承包人按合同要求向监理人提交了工程进度计划，并根据监理人的意见对工程进度计划进行了修改，监理人对修改后的工程进度计划予以确认。在施工过程中，发现由于进度计划安排不善导致出现了人员窝工的情况，由此产生的后果应由()承担。",[50,52,54,56],{"key":20,"text":51,"correct":22},"发包人",{"key":24,"text":53,"correct":22},"监理人",{"key":27,"text":55,"correct":22},"发包人与承包人共同",{"key":31,"text":57,"correct":29},"承包人",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1119939,"根据《建设工程施工合同（示范文本）》（GF-1999-0201)规定，关于预付款的表述，不正确的是()。",[62,64,66,68],{"key":20,"text":63,"correct":29},"预付款保函的担保金额应大于预付款金额",{"key":24,"text":65,"correct":22},"预付款的额度和预付办法在专用合同条款中约定",{"key":27,"text":67,"correct":22},"预付款用于承包人为合同工程施工购置材料、工程设备、施工设备、修建临时设施以及组织施工队伍",{"key":31,"text":69,"correct":22},"保函的担保金额可根据预付款扣回的金额相应递减",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1119940,"承包人在开工前，按照监理提供的测量基准点、基准线和水准点及其书面资料进行复核，建立控制网，结果因提供的资料不准确导致承包人测量放线返工，应由( )承担相应的损失。",[74,75,76,78],{"key":20,"text":57,"correct":22},{"key":24,"text":51,"correct":29},{"key":27,"text":77,"correct":22},"监理单位",{"key":31,"text":79,"correct":22},"发包人和监理单位",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":31,"analysis":33},1119941,"如发包人提供的测量基准点错误导致工程损失，发包人应()。",[84,86,88,90],{"key":20,"text":85,"correct":22},"承担由此增加的费用，但不承担工期延误",{"key":24,"text":87,"correct":22},"承担由此造成的工期延误，但不承担由此增加的费用",{"key":27,"text":89,"correct":22},"承担由此增加的费用和工期延误，但不补偿承包人利润损失",{"key":31,"text":91,"correct":29},"承担由此增加的费用和工期延误，并向承包人支付合理利润",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":27,"analysis":33},1119942,"施工总承包管理模式在质量控制方面的一个特点是()。",[96,98,100,102],{"key":20,"text":97,"correct":22},"对分包人的质量控制主要由发包人进行",{"key":24,"text":99,"correct":22},"各分包合同交叉界面的定义由发包人负责",{"key":27,"text":101,"correct":29},"对分包人来说，符合质量控制上的“他人控制”原则，对质量控制有利",{"key":31,"text":103,"correct":22},"施工总承包管理的招标不依赖于施工图设计，对质量控制不利",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":20,"analysis":33},1119943,"投标人取得了投标资格，在获得投标文件之后首要工作是()",[108,110,112,114],{"key":20,"text":109,"correct":29},"认真仔细研究招标文件",{"key":24,"text":111,"correct":22},"开展详细的调查研究",{"key":27,"text":113,"correct":22},"复核工程量",{"key":31,"text":115,"correct":22},"确定投标策略",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":31,"analysis":33},1119944,"标前会议上，招标人对投标人书面提出的问题和会议上即席提出的问题给予解答，会议结束后，招标人应将会议纪要用书面形式发给( )。",[120,122,124,126],{"key":20,"text":121,"correct":22},"提出问题的投标人",{"key":24,"text":123,"correct":22},"所有参加标前会议的投标人",{"key":27,"text":125,"correct":22},"所有未参加标前会议的投标人",{"key":31,"text":127,"correct":29},"每一个投标人",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":27,"analysis":33},1119945,"如果招标人在招标文件已经发布之后，发现有问题需要进一步的澄清或修改，应当在招标文件要求提交投标文件截止时间至少()日前发出。",[132,133,134,136],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":22},{"key":27,"text":135,"correct":29},"15",{"key":31,"text":137,"correct":22},"30",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":27,"analysis":33},1119946,"监理人发出暂停施工指示后()d内未向承包人发出复工通知，除了该项停工属于承包人暂停施工的责任的情况外，承包人可向监理人提交书面通知，要求监理人在收到书面通知后28d内准许已经暂停施工的工程或其中一部分工程继续施工。",[142,143,144,146],{"key":20,"text":41,"correct":22},{"key":24,"text":45,"correct":22},{"key":27,"text":145,"correct":29},"56",{"key":31,"text":147,"correct":22},"90",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":27,"analysis":33},1119947,"某工程项目施工过程中，先后发生了多次暂停施工：①由于监理人未能按约定提供图纸，导致暂停施工5天；②由于承包人已完工程出现质量问题，监理人要求进行质量整改，导致暂停施工8天；③由于发包人未能按合同约定支付工程款，导致暂停施工10天；④由于达到专用条件规定的异常恶劣气候条件的暴雨，导致暂停施工4天。根据《标准施工招标文件》中“通用合同条款”的规定，对上述情况导致的暂停施工，承包人可获得的工期顺延为()。",[152,154,156,158],{"key":20,"text":153,"correct":22},"13天",{"key":24,"text":155,"correct":22},"15天",{"key":27,"text":157,"correct":29},"19天",{"key":31,"text":159,"correct":22},"27天",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":31,"analysis":33},1119948,"根据《标准施工招标文件》“通用条款”，承包人应在接到开工通知后的()内向监理人提交承包人在施工场地的管理机构以及人员安排的报告",[164,166,168,170],{"key":20,"text":165,"correct":22},"7天",{"key":24,"text":167,"correct":22},"42天",{"key":27,"text":169,"correct":22},"14天",{"key":31,"text":171,"correct":29},"28天",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":24,"analysis":33},1119949,"根据《标准施工招标文件》中“通用合同条款”的规定，设计交底应由()组织。",[176,177,178,179],{"key":20,"text":53,"correct":22},{"key":24,"text":51,"correct":29},{"key":27,"text":57,"correct":22},{"key":31,"text":180,"correct":22},"设计单位",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":20,"analysis":33},1119950,"根据《标准施工招标文件》，下列属于承包人的一般义务的是（）。",[185,187,189,191],{"key":20,"text":186,"correct":29},"对施工作业和施工方法的完备性负责",{"key":24,"text":188,"correct":22},"组织设计交底",{"key":27,"text":190,"correct":22},"支付合同价款",{"key":31,"text":192,"correct":22},"协助办理证件和批件",{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":24,"analysis":33},1119951,"根据《标准施工招标文件》中“通用合同条款”的规定，下列事项中应由发包人承担责任的是（）。",[197,199,201,203],{"key":20,"text":198,"correct":22},"现场人员的工伤事故",{"key":24,"text":200,"correct":29},"工程或工程的任何部分对土地的占用所造成的第三者财产损失",{"key":27,"text":202,"correct":22},"临时设施的设计、建造、运行、维护、管理和拆除",{"key":31,"text":204,"correct":22},"施工场地及其周边环境与生态的保护工作",{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":31,"analysis":33},1119952,"甲公司是某建设项目的施工总承包管理单位，乙公司是该项目的分包单位，则下述表述中正确的是（）。",[209,211,213,215],{"key":20,"text":210,"correct":22},"一般情况下，乙公司的分包合同应与甲公司签订",{"key":24,"text":212,"correct":22},"甲公司负责分包合同的管理与协调工作，对项目目标控制不承担责任",{"key":27,"text":214,"correct":22},"如甲公司认为乙公司没有能力完成分包任务，但业主不同意更换，则甲公司应认可该分包合同",{"key":31,"text":216,"correct":29},"甲公司只收取总包管理费，不赚总包与分包之间的差价",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":27,"analysis":33},1119953,"建筑材料运输过程中，属于途中自然减量的是（）。",[221,223,225,227],{"key":20,"text":222,"correct":22},"管理不善造成的损失",{"key":24,"text":224,"correct":22},"非人力所能抗拒的自然灾害造成的损失",{"key":27,"text":226,"correct":29},"装卸操作或换装造成的损失",{"key":31,"text":228,"correct":22},"工作失职造成的损失",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":24,"analysis":33},1119954,"根据《建设工程施工劳务分包合同（示范文本）》(GF2003-0214)，全部分包工作完成，经工程承包人认可后（）日内，劳务分包人向工程承包人递交完整的结算资料，按照合同约定进行劳务报酬的最终支付。",[233,234,235,236],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":29},{"key":27,"text":45,"correct":22},{"key":31,"text":237,"correct":22},"42",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},1119955,"某建设项目施工合同约定，由承包人负责采购项目所需的断桥隔热门窗，现设计要求的质量标准高于国家标准，则在材料采购合同中，对该材料质量标准约定应按（）执行。",[242,244,246,248],{"key":20,"text":243,"correct":22},"相应的企业标准",{"key":24,"text":245,"correct":29},"设计要求",{"key":27,"text":247,"correct":22},"颁布的国家标准",{"key":31,"text":249,"correct":22},"颁布的国家标准与设计要求综合确定的标准",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},1119956,"采用( )方式的，施工过程中不计工时和工程量。",[254,256,258,260],{"key":20,"text":255,"correct":29},"固定劳务报酬",{"key":24,"text":257,"correct":22},"按确定的工时计算劳务报酬的",{"key":27,"text":259,"correct":22},"按确认的工程量计劳务报酬的",{"key":31,"text":261,"correct":22},"计酬",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},1119957,"劳务分包合同中，劳务分包人应()。",[266,268,270,272],{"key":20,"text":267,"correct":22},"负责工程测量定位、沉降观测、技术交底",{"key":24,"text":269,"correct":22},"负责与发包人、监理、设计及有关部门联系，协调现场工作",{"key":27,"text":271,"correct":22},"自行准备有关的生产、生活临时设施",{"key":31,"text":273,"correct":29},"承担由于自身责任造成的质量修改、返工、工期拖延、安全事故、现场脏乱所造成的损失及各种罚款",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},1119958,"某工程项目中，甲公司作为工程承包人与乙公司作为劳务分包人签订了劳务分包合同，约定由乙公司负责现场的脚手架搭设，甲公司负责提供该分包工程所需的材料，对运至施工场地用于该分包工程的材料，应由（）办理或获得保险。",[278,279,281,283],{"key":20,"text":51,"correct":22},{"key":24,"text":280,"correct":29},"甲公司",{"key":27,"text":282,"correct":22},"乙公司",{"key":31,"text":284,"correct":22},"工程师",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":31,"analysis":33},1119959,"建设工程施工劳务分包合同中，工程承包人的主要义务不包括()",[289,291,293,295],{"key":20,"text":290,"correct":22},"向劳务分包人提供生产生活临时设施",{"key":24,"text":292,"correct":22},"统一安排技术档案资料的收集整理及交工验收",{"key":27,"text":294,"correct":22},"与发包人监理设计及有关部门联系，协调现场工作关系",{"key":31,"text":296,"correct":29},"组织具有相应资格证书的工人投入劳务分包工作",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":20,"analysis":33},1119960,"关于材料设备的交货期限，供方负责送货的，以（）为准。",[301,303,305,307],{"key":20,"text":302,"correct":29},"采购方收货戳记的日期",{"key":24,"text":304,"correct":22},"供方按合同规定通知的提货日期",{"key":27,"text":306,"correct":22},"供方发运产品时承运单位签发的日期",{"key":31,"text":308,"correct":22},"向承运单位提出申请的日期",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":24,"analysis":33},1119961,"根据《建设工程施工劳务分包合同（示范文本）》（GF-2003-0214）规定，工程承包人收到劳务分包人递交的结算资料后()d内进行核实，给予确认或者提出修改意见。",[313,314,315,316],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":29},{"key":27,"text":43,"correct":22},{"key":31,"text":45,"correct":22},{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":24,"analysis":33},1119962,"案卷封面档号由( )填写。",[321,323,325,326],{"key":20,"text":322,"correct":22},"建设单位",{"key":24,"text":324,"correct":29},"档案保管单位",{"key":27,"text":77,"correct":22},{"key":31,"text":327,"correct":22},"地方城建档案管理部门",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":31,"analysis":33},1119963,"在工程建设活动中直接形成的具有归档保存价值的文字、图表、声像等各种形式的历史记录，也可简称为（）。",[332,334,336,338],{"key":20,"text":333,"correct":22},"建设工程文件",{"key":24,"text":335,"correct":22},"归档文件",{"key":27,"text":337,"correct":22},"施工文档资料",{"key":31,"text":339,"correct":29},"工程档案",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":20,"analysis":33},1119964,"施工文件的归档范围详见《建设工程文件归档整理规范》的要求。对与工程建设有关的重要活动、记载工程建设（）、具有保存价值的各种载体文件，均应收集齐全，整理立卷后归档。",[344,346,348,350],{"key":20,"text":345,"correct":29},"主要过程和现状",{"key":24,"text":347,"correct":22},"主要阶段和质量状况",{"key":27,"text":349,"correct":22},"安全和质量状况",{"key":31,"text":351,"correct":22},"进度与质量状况",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":24,"analysis":33},1119965,"平行发包给多个承包单位的建设工程项目，应由各承包单位负责收集、整理、立卷其承包项目的工程文件，并应当在工程竣工验收前及时向()移交。",[356,357,358,360],{"key":20,"text":77,"correct":22},{"key":24,"text":322,"correct":29},{"key":27,"text":359,"correct":22},"城建档案管理机构",{"key":31,"text":361,"correct":22},"质量监督机构",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":31,"analysis":33},1119966,"建设工程实行施工总承包的，由施工总承包单位负责收集、汇总各分包单位形成的工程档案，各分包单位应将本单位形成的工程文件整理、立卷后及时移交（）。",[366,368,370,371],{"key":20,"text":367,"correct":22},"工程咨询单位",{"key":24,"text":369,"correct":22},"城建档案管理部门",{"key":27,"text":322,"correct":22},{"key":31,"text":372,"correct":29},"总承包单位",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":24,"analysis":33},1119967,"关于工程档案的编制，下列表述中正确的是（）。",[377,379,381,383],{"key":20,"text":378,"correct":22},"工程档案应在竣工后及时收集整理",{"key":24,"text":380,"correct":29},"工程档案不得涂改和随意抽撤",{"key":27,"text":382,"correct":22},"工程档案的内容由建设单位确定",{"key":31,"text":384,"correct":22},"工程档案由施工单位组织编制",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":24,"analysis":33},1119968,"工程各参与单位填写工程档案的依据不包括（）",[389,391,393,395],{"key":20,"text":390,"correct":22},"工程合同",{"key":24,"text":392,"correct":29},"施工方案",{"key":27,"text":394,"correct":22},"设计文件",{"key":31,"text":396,"correct":22},"施工及验收规范",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":27,"analysis":33},1119969,"建设工程实行施工总承包的，由施工()单位负责收集、汇总各分包单位形成的工程档案。",[401,403,405,407],{"key":20,"text":402,"correct":22},"发包",{"key":24,"text":404,"correct":22},"分包",{"key":27,"text":406,"correct":29},"总承包",{"key":31,"text":408,"correct":22},"监理",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":31,"analysis":33},1119970,"( )是城建档案的重要组成部分，是建设工程进行竣工验收的必要条件，是全面反映建设工程质量状况的重要文档资料。",[413,415,417,419],{"key":20,"text":414,"correct":22},"工程质量控制资料",{"key":24,"text":416,"correct":22},"竣工图",{"key":27,"text":418,"correct":22},"工程施工技术管理资料",{"key":31,"text":337,"correct":29},{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":20,"analysis":33},1119971,"施工单位可以按照施工合同的约定，接受（）的委托进行工程档案的组织和编制工作。",[424,425,427,428],{"key":20,"text":322,"correct":29},{"key":24,"text":426,"correct":22},"咨询单位",{"key":27,"text":180,"correct":22},{"key":31,"text":77,"correct":22},{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":20,"analysis":33},1119972,"施工单位负责编制的施工文件的套数不得少于（）的要求，但应有完整的施工文件移交建设单位及自行保存。",[433,434,436,438],{"key":20,"text":327,"correct":29},{"key":24,"text":435,"correct":22},"建设行政主管部门",{"key":27,"text":437,"correct":22},"施工单位技术管理部门",{"key":31,"text":322,"correct":22},{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":31,"analysis":33},1119973,"项目经理部收到工程图纸后，应组织有关人员进行审查，将设计疑问及图纸存在的问题，按专业整理、汇总后报（）。",[443,445,446,447],{"key":20,"text":444,"correct":22},"施工单位",{"key":24,"text":180,"correct":22},{"key":27,"text":77,"correct":22},{"key":31,"text":322,"correct":29},{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":24,"analysis":33},1119974,"根据施工合同示范文本的规定，图纸会审和设计交底应由（）组织。",[452,454,455,456],{"key":20,"text":453,"correct":22},"总监理工程师",{"key":24,"text":51,"correct":29},{"key":27,"text":57,"correct":22},{"key":31,"text":180,"correct":22},{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":24,"analysis":33},1119975,"下列不属于工程施工技术管理资料的是（）。",[461,463,465,467],{"key":20,"text":462,"correct":22},"图纸会审记录文件",{"key":24,"text":464,"correct":29},"地质勘查报告",{"key":27,"text":466,"correct":22},"设计变更文件",{"key":31,"text":468,"correct":22},"工程质量事故记录文件",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":27,"analysis":33},1119976,"工程洽商是施工过程中一种协调业主与施工单位、施工单位和设计单位洽商行为的记录，通常情况下由（）提出。",[473,474,476,477],{"key":20,"text":180,"correct":22},{"key":24,"text":475,"correct":22},"业主",{"key":27,"text":444,"correct":29},{"key":31,"text":426,"correct":22},{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":27,"analysis":33},1119977,"不属于工程测量记录文件的是( )。",[482,484,486,488],{"key":20,"text":483,"correct":22},"基槽及各层测量放线记录文件",{"key":24,"text":485,"correct":22},"施工测量放线报验表",{"key":27,"text":487,"correct":29},"工程定位测量检查记录",{"key":31,"text":489,"correct":22},"沉降观测记录文件",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":27,"analysis":33},1119978,"工程竣工文件作为工程施工技术管理资料的一部分，应包括竣工报告、竣工验收证明书和（）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"隐蔽工程验收资料",{"key":24,"text":497,"correct":22},"工程施工质量验收资料",{"key":27,"text":499,"correct":29},"工程质量保修书",{"key":31,"text":414,"correct":22},{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":27,"analysis":33},1119979,"在工程施工技术管理资料中，工程竣工文件作为工程施工技术管理资料的一部分，应包括竣工报告、竣工验收证明书和( )。",[505,506,507,508],{"key":20,"text":495,"correct":22},{"key":24,"text":497,"correct":22},{"key":27,"text":499,"correct":29},{"key":31,"text":414,"correct":22},{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":20,"analysis":33},1119980,"能够全面反映建设工程施工全过程质量控制和保证的依据性证明资料是()。",[513,514,516,517],{"key":20,"text":414,"correct":29},{"key":24,"text":515,"correct":22},"工程竣工质量验收资料",{"key":27,"text":416,"correct":22},{"key":31,"text":418,"correct":22},{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":24,"analysis":33},1119981,"建设工程实行质量保修制度，()在向建设单位提交工程竣工验收报告时，应当向建设单位出具质量保修书。",[522,523,525,526],{"key":20,"text":77,"correct":22},{"key":24,"text":524,"correct":29},"工程承包单位",{"key":27,"text":180,"correct":22},{"key":31,"text":527,"correct":22},"设备供应单位",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":24,"analysis":33},1119982,"竣工报告是指工程项目具备竣工条件后，施工单位提请（）组织竣工验收的文件。",[532,534,535,536],{"key":20,"text":533,"correct":22},"工程总承包单位",{"key":24,"text":322,"correct":29},{"key":27,"text":77,"correct":22},{"key":31,"text":537,"correct":22},"建设主管部门",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},1119983,"见证取样的试块、试件和材料应送至（）进行检测，并由检测单位出具检测报告。",[542,544,546,548],{"key":20,"text":543,"correct":22},"项目质量监督机构指定的质量检测单位",{"key":24,"text":545,"correct":29},"经过省级以上建设行政主管部门对其资质认可和质量技术监督部门对其计量认证的质量检测单位",{"key":27,"text":547,"correct":22},"经过省级以上建设行政主管部门对其资质认可的质量检测单位",{"key":31,"text":549,"correct":22},"监理单位指定的质量检测单位",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":27,"analysis":33},1119984,"以下有关隐蔽工程验收记录资料要求的说法中，表述不正确的是()。",[554,556,558,560],{"key":20,"text":555,"correct":22},"验收时，施工单位必须附有关分项工程质量验收及测试资料，包括原材料试(化)验单、质量验收记录、出厂合格证等，以备查验",{"key":24,"text":557,"correct":22},"需要进行处理的，处理后必须进行复验，办理复验手续，填写复验记录，并做出复验结论",{"key":27,"text":559,"correct":29},"工程具备隐检条件后，由技术负责人填写隐蔽工程验收记录，由质检员提前一天报请监理单位",{"key":31,"text":561,"correct":22},"验收时由专业技术负责人组织施工员、质量检查员共同参加，验收后由监理单位专业监理工程师签署验收意见及验收结论，并签字签章",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":31,"analysis":33},1119985,"施工文件档案管理中规定，在开工前由施工单位现场负责人填写“施工现场质量管理检查记录”，报()检查，并做出检查结论。",[566,567,569,571],{"key":20,"text":537,"correct":22},{"key":24,"text":568,"correct":22},"建设审批部门",{"key":27,"text":570,"correct":22},"设计单位负责人",{"key":31,"text":572,"correct":29},"项目总监理工程师",[574,577,580,583,586,589],{"id":15,"name":575,"category":7,"favorite":576},"领导干部任职前廉政法规知识测试题",92,{"id":578,"name":579,"category":7,"favorite":15},595,"建筑结构与设备",{"id":581,"name":582,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":584,"name":585,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":587,"name":588,"category":7,"favorite":8},534,"BIM工程师",{"id":590,"name":588,"category":7,"favorite":8},535]